Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Drainage and Culvert Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Drainage and Culvert Installation involves the replacement of drainage structures for prime contractors on West Virginia Department of Transportation roadway projects. The scope of work specifically includes the replacement of ditch line flow culverts and the cleaning of shoulders and ditches utilizing specialized ditching equipment. The primary deliverables are the successful installation of culverts and the cleaning of drainage ditches. To be eligible for this contract, providers must hold West Virginia Department of Transportation prequalification for drainage and structures. The project is associated with NAICS code 237310 and is designated for performance in Marshall, West Virginia.

General Info

Subcontract for drainage and culvert installation and ditch cleaning in Marshall, West Virginia.

Place of Performance

Marshall, WV, USA

Set-Aside

NONE

Documents

This scope was carved out of 2025260017.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Call 007 2025260017

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyWest Virginia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Replaces drainage structures for prime contractors on West Virginia Department of Transportation (WVDOT) roadway projects. Performs replacement of ditch line flow culverts and cleaning of shoulders and ditches using specialized ditching equipment. Requires WVDOT prequalification for drainage and structures. Delivers installed culverts and cleaned drainage ditches.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, and subsurface investigation; pipeline and utility work involving tunneling, boring, jacking, and the installation of steel casing and cathodic protection; and surface improvements including asphalt paving, landscaping, and the installation of traffic signals and lighting. Additionally, the project requires various materials and support services, including ready-mix supply, precast concrete, trucking, hauling, and storm water pollution prevention. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. A critical requirement is that responsible subcontractors and material contractors must provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system. The deadline for responses is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 18 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS