Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Drainage & Erosion Control

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the state of West Virginia focuses on the installation of drainage structures and erosion control measures for prime contractors working on WVDEP Abandoned Mine Lands projects. The scope of work includes the installation of riprap lined channels, riprap blankets, road crossings, and stabilization fabric, as well as piezometer abandonment and the maintenance of sediment controls in accordance with NPDES Stormwater Requirements. The opportunity is categorized under NAICS code 237310 and was posted on September 22, 2026, with a response deadline of September 30, 2026. The primary objective is the delivery of fully installed drainage systems and active erosion control measures to support environmental reclamation efforts.

General Info

West Virginia subcontract for drainage installation and erosion control on abandoned mine projects.

Agency

West VirginiaView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Www.Wvoasis.Gov, WV, USA

Set-Aside

NONE

Documents

This scope was carved out of ARFQ-0313-DEP2700000007-2.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ARFQ-0313-DEP2700000007-2 | AML - Harmonds Creek Portals Phase II

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyWest Virginia
ContactsNo contacts available
OfficeN/A
Organization / Agency
West Virginia
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs drainage structures and erosion control measures for prime contractors on WVDEP Abandoned Mine Lands projects. Installs riprap lined channels, riprap blankets, road crossings, and stabilization fabric. Performs piezometer abandonment and maintains sediment controls per NPDES Stormwater Requirements. Delivers installed drainage systems and active erosion control measures.

Similar Contracts

Same NAICS industry code

More opportunities from West Virginia

Same awarding agency

NAICS: 238910
New
SLED
ARFQ-0313-DEP2700000007-2 | AML - Harmonds Creek Portals Phase II
Solicitation # ARFQ-0313-DEP2700000007-2
The West Virginia Department of Environmental Protection, Abandoned Mine Lands, is soliciting bids for the Harmonds Creek Portals Phase II Construction/Reclamation project in Putnam County, West Virginia. This fixed-period contract, with a maximum value of 500,000 dollars, requires the contractor to provide all labor, equipment, and supplies necessary for site preparation, the installation of wet, dry, and standard bar gate mine seals, and the revegetation of disturbed areas. The project must be completed within 120 days of the notice to proceed. Award will be granted to the lowest responsible bidder, with evaluation based on the vendor's capability, integrity, and eligibility as verified by the Office of Surface Mining Reclamation and Enforcement. Bidders must submit all responses electronically via the wvOASIS VSS Portal. Requirements include a bid bond of five percent of the total bid, and the successful vendor must provide performance and labor/material payment bonds for 100 percent of the contract value. Due to federal funding, contractors must adhere to Davis-Bacon wage rates, the Build America, Buy America Act for materials, and OSHA Regulation 29 CFR Part 1926 for excavation and trenching. Payment is managed through a schedule of values with itemized estimates submitted twice monthly. Final acceptance is contingent upon site inspections by an engineer and the submission of certified as-built drawings within 60 days of substantial completion.
Site Preparation Contractors

POSTED

1 day ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS