Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Texas was posted on June 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Drainage and Water Management During Construction

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
SLED
Whittier Park Playground Installation
Solicitation # PW ITB 6647-26
The City of Spokane is soliciting bids for the Whittier Park Playground Installation project, located at 3405 W. Hartson Ave. The scope of work includes a base bid for the expansion of the existing play area, featuring the installation of owner-furnished equipment, engineered wood fiber surfacing, excavation, demolition, new concrete curbing, grading, irrigation repairs, and landscape restoration. An optional alternate is available for the supply and placement of engineered wood fiber surfacing within the existing play area footprint. The project is funded by Federal CDBG funds and is subject to both Washington State prevailing wage rules under RCW 39.12 and Federal Davis-Bacon Act requirements. Bids must be submitted electronically via the City's bidding portal by 11:00 AM on December 8, 2026. The contract will be awarded to the lowest responsible bidder who meets mandatory criteria, including current contractor registration, a Washington UBI number, and appropriate insurance and tax registrations. A critical requirement for responsiveness is that the contractor must employ a Certified Playground Safety Inspector (CPSI). Once awarded, the contractor has ten days to sign the contract and provide payment and performance bonds. Work must commence within ten days of the Notice to Proceed and be substantially completed within 30 working days.
City of Spokane

POSTED

about 15 hours ago

DEADLINE

in 26 days
NAICS: 238990
New
SLED
Pool Plaster Replacement at Simsbury Farms Rec Complex
Solicitation # CP&R 2026-4
The Town of Simsbury is soliciting bids for a licensed contractor to perform pool plaster replacement and surface rehabilitation for the Main Lap Pool and Diving Pool at the Simsbury Farms Recreation Complex. The scope of work includes water-blasting surfaces, removing hollow areas, replacing grout and caulking, updating depth markers and drain grates, and applying a multi-coat scratch coat and new commercial-grade cementitious plaster finish. All work must be completed by May 10, 2027, and performed Monday through Friday, excluding state and federal holidays unless approved. The project requires adherence to the Virginia Graeme Baker Pool and Spa Safety Act, Connecticut public pool requirements, and ASTM standards, with a minimum three-year warranty on labor and workmanship. To be considered a responsible bidder, firms must demonstrate the successful completion of at least five comparable commercial or public-use pool resurfacing projects within the last seven years, including three of similar size and complexity. Sealed proposals must be submitted to the Director of Finance by 10:00 a.m. on November 30, 2026. Required documentation includes a bid form, qualifications statement, non-collusion affidavit, a ten-year project list, and a list of key personnel. The successful bidder must provide a W-9 form and maintain specific insurance coverage, including a $2,000,000 limit for single-person injury and a $1,000,000 limit for multi-person accidents. The Town of Simsbury is exempt from Federal Excise Taxes and Connecticut Sales and Use Taxes.
DAS Procurement

POSTED

about 15 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

The contract pertains to the installation of temporary drainage systems, dewatering, and erosion control measures necessary during maintenance operations on roadways in El Paso, Texas, aimed at preventing damage to infrastructure caused by water accumulation or soil displacement. All work must be performed in accordance with prevailing standards for construction-related water management, ensuring that surface runoff is properly diverted, sediment is contained, and the surrounding environment is protected throughout the duration of maintenance activities. The scope is focused exclusively on temporary solutions implemented during active work periods, not permanent infrastructure upgrades. This is classified as a subcontract under NAICS code 238990, indicating it falls under other heavy and civil engineering construction specialties. The contract was posted by the Texas Department of Transportation with a solicitation deadline set for June 1, 2026, though no response deadline is distinguishable from the posting date, suggesting immediate or same-day award procedures may apply. Performance is limited to the El Paso area, and no set-aside provisions or organizational type details are specified. All work is expected to align with state and federal environmental and transportation compliance requirements, and technical specifications are available through the provided Texas DOT planning portal link.

General Info

Temporary drainage and erosion control for roadway maintenance in El Paso, Texas, under TxDOT subcontract.

Agency

Texas Department of Transportation

Place of Performance

El Paso, TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 6497-64-001.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

El Paso County — CSJ 6497-64-001 — June 2026 Letting — Local-Let Maintenance

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas Department of Transportation
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of temporary drainage systems, dewatering, and erosion control measures during maintenance activities to prevent roadway damage.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS