Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Drainage Channel Lining & Erosion Control

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Drainage Channel Lining and Erosion Control involves installing channel linings and erosion control measures for prime contractors on projects for the Commonwealth of Kentucky Division of Abandoned Mine Lands. The scope of work includes the installation of Class II Channel Lining and the construction of aggregate-based construction entrances to ensure stabilized drainage channels and secure access points. The contract is managed by the Energy & Environment Cabinet for the state of Kentucky under NAICS code 238990. There is no specific set-aside status designated for this opportunity. Interested parties should note the response deadline of December 1, 2026.

General Info

Place of Performance

Other, KY, USA

Set-Aside

NONE

Documents

This scope was carved out of RFB-785-2700000192-2.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFB-785-2700000192-2 | RFB-108-27 25035AMLBAML, HOPKINS COUNTY

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 7 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 3 documents on the prime contractFrom RFB-785-2700000192-2 | RFB-108-27 25035AMLBAML, HOPKINS COUNTY
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyKentucky → Energy & Environment Cabinet
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs channel linings and erosion control measures for prime contractors on Commonwealth of Kentucky Division of Abandoned Mine Lands projects. Installs Class II Channel Lining and constructs construction entrances using aggregate. Delivers lined drainage channels and stabilized construction entrances.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
Federal
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation number SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, and the modification of sluice and slide gates. Additionally, the project encompasses the installation of platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying of reactor areas. The estimated contract value for this project ranges between 18.5 million and 19.5 million dollars. This solicitation is designated as a Small Business set-aside, including SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. The bid opening is scheduled for December 2, 2026. Ranger Pipelines Incorporated is seeking quotes from certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and welding. All subcontractors must comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details

More opportunities from Kentucky → Energy & Environment Cabinet

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS