Drainage Infrastructure Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract involves the design and installation of site drainage systems tailored to manage stormwater runoff, with particular emphasis on coastal environmental conditions in Malibu. This subcontract is focused on infrastructure that mitigates erosion, prevents flooding, and protects sensitive coastal ecosystems by effectively channeling and dispersing water runoff. The work is governed under NAICS code 237110, which classifies it as heavy and civil engineering construction, indicating the scale and technical complexity of the system requirements. The project is being procured by the City of Malibu in California, with all performance activities centered within the city limits, reinforcing its local impact and compliance with regional environmental standards. Despite the absence of specific set-aside details or point of contact information, the posting date of July 2, 2026, suggests this is a planned initiative intended to address long-term resilience in a high-risk coastal zone.
General Info
Agency
NAICS
Place of Performance
Malibu, CASet-Aside
Documents
This scope was carved out of Coastal Development Permit No. 22-009, Appeal No. 25-001, Site Plan Review No. 24-013, and Categorical Exemption No. 23-072.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
