Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Iowa was posted on July 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Drawdown & Structure Installation, Diamond Lake, Poweshiek County

Closed
27-05-79-01State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter; structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and painting; and general electrical work. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a bid deadline of September 17, 2026, at 10:00 a.m. The project is partially financed through the EPA's Water Infrastructure Finance and Innovation Act (WIFIA), making it subject to the American Iron and Steel (AIS) provisions, Davis-Bacon Related Acts, and DBE Program requirements. Kiewit is specifically seeking qualified DBE, MBE, WBE, and SBE certified firms. To be considered responsive, bidders must hold a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, for which Kiewit will reimburse the bond premiums. All inquiries and bid submissions are managed by Lead Estimator Jose Valenzuela.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 8 days
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers, Honolulu District. The scope of work involves maintenance dredging of approximately 4,260 cubic yards with ocean disposal at an approved site south of Oahu, vegetation clearance, and the repair of the revetted mole through stone rework and void filling. The project is located in Haleiwa, Oahu, Hawaii, and has a performance period of 200 calendar days from the receipt of the Notice to Proceed. The estimated contract value ranges between 1 million and 5 million dollars, with the award based on a sealed bid process where price is the primary evaluation factor. The contract is set aside for small businesses, with a 10 percent price evaluation preference granted to HUBZone small business concerns. Key requirements include the provision of a third-party qualified surveyor for multi-beam hydrographic surveys to verify dredging depths and the appointment of key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Bidders must provide performance and payment bonds and adhere to Davis-Bacon Act wage requirements. Liquidated damages for delays are set at 2,297 dollars per calendar day. Submission of bids must be handled via sealed envelopes to the Fort Shafter office, as electronic submissions are strictly prohibited.
Healy Tibbitts Builders, Inc.

POSTED

about 5 hours ago

DEADLINE

in 21 days
NAICS: 237990
New
Federal
Z--Mendota Pool Bypass and Reach 2B Improvements
Solicitation # 140R2026R0020
The Bureau of Reclamation, under the San Joaquin River Restoration Program and the San Joaquin River Restoration Settlement Act, is seeking industry input via Request for Information 140R2026R0020 for the Mendota Pool Bypass and Reach 2B Improvements. This large-scale civil works project in California is estimated to have a magnitude between 225 million and 300 million dollars. The primary objective is to construct channel and structural improvements to ensure a conveyance of at least 4,500 cfs from Reach 2B downstream to Reach 3. The project is divided into two phases: Phase 1 focuses on the Mendota Pool Bypass Channel to provide passage for Chinook salmon, including the construction of a control structure, fish ladder, and auxiliary water supply, with a goal of being operational by spring 2030. Phase 2 involves replacing intake locations in Reach 2B with a headworks structure, canal, and siphon or pipeline to maintain water delivery to the Columbia Mowry Delivery System. The government aims to begin construction on the channel and levee in 2027 and is currently evaluating the most effective delivery method, considering design-bid-build, design-build, or a hybrid approach. The project must comply with several environmental mandates, including the National Environmental Policy Act, the Clean Water Act, the Endangered Species Act, and the National Historic Preservation Act, and will require a Project Labor Agreement. As this is currently an RFI for market research and planning, the agency is soliciting feedback on risk allocation, constructability, and schedule estimates. Interested parties must execute a Federal Non-Disclosure Agreement to access detailed geotechnical reports, design drawings, and specifications. The primary point of contact for this effort is Stephanie Lindner.
Mp-Regional Office

POSTED

about 9 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The project involves the controlled drawdown of Diamond Lake in Poweshiek County, Iowa, through the cutting of the dam and the installation of a permanent drawdown structure to facilitate future lake level management. All work must comply with the detailed plans and specifications available at Beeline and Blue, located at 2507 Ingersoll Ave, Des Moines, IA, and additional information can be obtained by visiting their website or calling (515) 244-1611. Any questions regarding the project, direct substitution requests, or bidding procedures must be submitted via email to constructionbids@dnr.iowa.gov by 12:00 p.m. CST on the Friday before bid letting, with the exact subject line format required for consideration. Bids are due no later than 11:00 a.m. CST on July 23, 2026, and will be solicited under project number 27-05-79-01 by the Iowa Department of Natural Resources, with the primary point of contact being Darin Galbraith at (515) 344-0055. The work is to be performed entirely within Poweshiek County, Iowa, and all bidders must adhere to the terms and conditions outlined in the project documentation.

General Info

Diamond Lake dam drawdown in Iowa with permanent structure, bids due July 23, 2026, DNR project 27-05-79-01

Agency

Iowa → Department of Natural ResourcesView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Poweshiek County, IA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIowa → Department of Natural Resources
Contacts1 person available
OfficeDES MOINES, IA, 50321, USA
Organization / Agency
Iowa → Department of Natural Resources
View Agency Profile
Office AddressDES MOINES, IA, 50321, USA

Full Description

Show more
This project consists of cutting the dam for a controlled drawdown of Diamond Lake. A drawdown structure will be installed to aid in future lake drawdowns.
*** Project documents, including plans, specifications, proposal forms, and addenda for this project are available at Beeline and Blue, 2507 Ingersoll Ave, Des Moines, IA 50312. Please visit www.beelineandblue.com or contact (515) 244-1611 for more information. ***
Direct substitution requests, questions about the project, or questions concerning bidding and contract procedures to DNR Procurement. To be considered, these requests must be emailed to constructionbids@dnr.iowa.gov by 12:00pm the Friday prior to bid letting with the following subject line: Contractor Question - Project Number - Project Location ***
Bid Closing Date and Time: 7/23/2026 at 11:00 AM CST

More opportunities from Iowa → Department of Natural Resources

Same awarding agency

NAICS: 237990
SLED
Septic Mound System (Rebid), Wapsipinicon State Park, Jones County
Solicitation # 25-06-53-02
The Iowa Department of Natural Resources is soliciting competitive quotations for project 25-06-53-02 at Wapsipinicon State Park in Jones County. This project is a rebid necessitated by previous pump sizing issues and involves the demolition of an existing septic system and the installation of a new septic mound system. The scope includes mobilization, demolition, the complete mound system installation, and topsoil import, with optional site restoration. Due to the requirements of the golf course, time is of the essence to ensure grass is established within the fall seeding window, with a final contract completion date of November 13, 2026. Bids must be submitted electronically to constructionbids@dnr.iowa.gov by 3:00 PM on September 10, 2026. The contract will be awarded to the lowest responsive and responsible bidder on a unit price basis. Key requirements include a performance bond for contracts exceeding 25,000 dollars, specific public liability and property damage insurance, and an NPDES Stormwater Discharge Permit for land disturbing activities of one acre or more. The contractor must provide a one-year guarantee on construction, and the Department may withhold up to 3 percent of payment per Iowa Code Chapter 573. Liquidated damages for delays are set at 1,000 dollars per calendar day.
Other Heavy and Civil Engineering Construction

POSTED

12 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS