Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Iowa was posted on July 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Shoreline Stabilization, Pillsbury Point, Dickinson County

Closed
24-01-30-03State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 11 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 17 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

This project involves repairing shoreline damage at Pillsbury Point State Park in Dickinson County, Iowa, caused by prolonged exposure to high water levels and wave action. The work aims to stabilize the shoreline to prevent further erosion and protect natural and recreational resources within the state park. All project documents including detailed plans, specifications, proposal forms, and addenda are available for review at Beeline and Blue in Des Moines, or online at www.beelineandblue.com, with inquiries directed to DNR Procurement via email to [email hidden] by 12:00pm on the Friday before bid letting, using the required subject line format. Bids must be submitted no later than 11:00am CST on July 23, 2026, under solicitation number 24-01-30-03. The Iowa Department of Natural Resources is the procuring agency, and the designated point of contact is Darin Galbraith, reachable at [phone hidden]. The project is located entirely within Dickinson County, Iowa, with no set-aside designation specified.

General Info

Repair shoreline erosion at Pillsbury Point State Park, Iowa, bids due July 23, 2026, DNR procuring.

Place of Performance

Dickinson County, IA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIowa → Department of Natural Resources
Contacts1 person available
OfficeDES MOINES, IA, 50321, USA
Office AddressDES MOINES, IA, 50321, USA

Full Description

Show more
This project consists of repairing damage caused by sustained high water and wave action along the shoreline of West Okoboji Lake at Pillsbury Point State Park.
*** Project documents, including plans, specifications, proposal forms, and addenda for this project are available at Beeline and Blue, 2507 Ingersoll Ave, Des Moines, IA 50312. Please visit www.beelineandblue.com or contact +1 (555) 000-0000 for more information. ***
Direct substitution requests, questions about the project, or questions concerning bidding and contract procedures to DNR Procurement. To be considered, these requests must be emailed to contact@example.gov by 12:00pm the Friday prior to bid letting with the following subject line: Contractor Question - Project Number - Project Location ***
Bid Closing Date and Time: 7/23/2026 at 11:00 AM CST

More opportunities from Iowa → Department of Natural Resources

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS