Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Dry Creek Bridge Wingwall Repair Project At Alvarado-Niles Road

Closed
20260730009State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The Dry Creek Bridge Wingwall Repair Project at Alvarado-Niles Road in Union City, California, is a municipal construction solicitation issued by the City of Union City under Bid #24-11, with a response deadline of August 17, 2026. The scope of work includes the complete removal and disposal of an existing wingwall, footing, and barrier, followed by excavation, backfill, and installation of new concrete structures including a retaining wall, barrier, and sidewalk. Work also involves reconstruction of a portion of the paved trail, removal and replacement of wood rail and posts, and painting of lumber and timber components. Strict compliance with Caltrans Standard Plans and Specifications, as well as City of Union City standards, is mandatory. The contractor must implement temporary shoring, erosion and water pollution control measures, and a traffic control plan. Onsite staging and storage are prohibited, requiring daily removal of all materials and equipment. All work must be completed within 30 working days following issuance of the Notice to Proceed at the designated location approximately 200 feet east of the intersection of Alvarado-Niles Road and Western Avenue. The contractor must hold a valid California Class A General Engineering license and be registered with the Department of Industrial Relations (DIR), and all subcontractors must also be DIR-registered. Prevailing wage rates under California Labor Code Section 1770 apply. Financial assurances include a 10% bid bond, performance and payment bonds at contract execution, and a 10% maintenance bond covering a one-year period post-completion. Insurance requirements mandate workers’ compensation, $1 million employer’s liability, $1 million commercial general liability, and $1 million automobile liability coverage. A 5% retention is withheld from progress payments and released 35 days after final acceptance. Liquidated damages of $500 per day apply for delays beyond the 30-day performance period, capped at 10% of the contract value. Bids must be submitted by email or in person by 2:00 p.m. on the deadline date and include completed license certifications, a list of proposed subcontractors, workers’ compensation insurance documentation, and certificates of insurance. The award will be made on a lowest price technically acceptable basis, with failure to meet mandatory compliance criteria resulting in rejection regardless of bid amount. No contract value has been determined as the bid schedule lacks unit prices. All project data and documents become city property upon completion, and the contractor must certify compliance with non

General Info

Remove and rebuild wingwall, footing, barrier, sidewalk, trail; comply with Caltrans, no onsite storage, pollution and traffic plans required.

Place of Performance

Union City, CA, USA

Set-Aside

NONE

Documents

2

24-11 Alvarado Niles Dry Creek Bridge Wingwall Repair Final Plans

PDF, High priority: read this firstplans
High

RFP 24-11 Dry Creek Bridge Wingwall Repair Project

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Union City
Contacts4 people available
OfficeN/A

Full Description

Show more
Bid #24-11: The Dry Creek Bridge Wingwall Repair Project involves the removal and disposal of existing wingwall, footing, and barrier, followed by excavation and backfill. Temporary shoring and water pollution control measures are required. The project includes the construction of a new wingwall, footing, and barrier, as well as the removal and reconstruction of a portion of the sidewalk and paved trail. Additionally, the work entails the removal and replacement of wood rail and posts, and painting of lumber and timber. The contractor must comply with Caltrans Standard Plans and Specifications where applicable. Onsite staging and storage are not permitted, requiring daily removal of materials and equipment. A Water Pollution Control Plan and Traffic Control Plan are mandatory.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS