Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Dry Well Installation and Construction

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Dry Well Installation and Construction involves the development of dry well systems for prime contractors working on Rancho California Water District projects in Temecula, California. The scope of work includes drilling or excavating dry well shafts, installing perforated casings or infiltration galleries, and placing stone or gravel filter media using specialized equipment such as drilling rigs and augers. The project requires strict adherence to stormwater infiltration standards and compliance with CEQA Section 15303 to ensure the delivery of a fully functional dry well system. The contract is categorized under NAICS code 238910 and was posted on September 18, 2025.

General Info

Subcontract for dry well installation and construction for Rancho California Water District projects.

Agency

Rancho California Water District

Place of Performance

Temecula, CA, 92590

Set-Aside

NONE

Documents

This scope was carved out of E-202500820.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

De Portola Drain Line Mitigation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyRancho California Water District
ContactsNo contacts available
OfficeN/A
Organization / Agency
Rancho California Water District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Constructs a dry well system for prime contractors on Rancho California Water District projects. Drills or excavates the dry well shaft, installs infiltration galleries or perforated casings, and places gravel or stone filter media. Utilizes augers, drilling rigs, and perforated piping. Adheres to stormwater infiltration standards and CEQA Section 15303 compliance. Delivers a functional dry well system.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 18 hours ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS