Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Dryburn Footbridge Replacement - PROW 302146

Open
ocds-h6vhtk-07bf89International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

1
PDF, High priority: read this firstrfp
High

Read the document

Due in 49 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 49 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyWestmorland and Furness Council
Contacts1 person available
OfficeN/A

Full Description

Show more
The Authority is seeking a contractor to design and build a new 34 metre two span footbridge over the South Tyne River along Public Right of Way 302146, near the area known as Dryburn near Garrigill and in the Alston parish. The bridge will be required to be at 1.2 minimum walking width, with a pier design suitable for the frequent flash flooding that led to the previous footbridge failing. The PRoW forms part of the Pennine Way National Trail and the work will need to be carried out to National Trails Quality Standards. The bridge would sit within the Alston parish and nearby the remote village of Garrigill, a remote location within the North Pennines National Landscape. The project is to be let as a 2 stage Design and Build contract with the contractor being responsible for completion of a full design and obtaining all necessary consents, permits and orders (Stage 1) to allow construction works (Stage 2) to commence as soon as possible after 1st April 2028 (subject to funding), and where required making best use of the in-river working window of 16th June to 30th September.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power in California. The scope of work is extensive, covering civil and infrastructure activities such as tunneling, boring, jacking, micro tunneling, cathodic protection, steel casing, and manhole material. Additional requirements include asphalt paving, traffic signs and signals, lighting, landscaping, ready mix and precast concrete supply, concrete drilling, saw cutting, welding services, and various support services including land surveying, site photography, quality control, dumpster services, site security, traffic control, trucking, hauling, subsurface investigation, material landfill, site clearing, shoring, subgrade, roadbed, and storm water pollution prevention. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. Responsive bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100% of their contract value, with bond premiums to be reimbursed by Kiewit. Kiewit will prioritize bidders who demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected electronic system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237310
New
SLED
Traffic Guidelines
Solicitation # 802
The Capitol Region Purchasing Council, an affiliate of the Capitol Region Council of Governments, is soliciting bids for traffic guidelines and painted pavement markings for a contract period running from January 1, 2027, through December 31, 2027. The scope of work primarily involves applying markings to sheet asphalt and bituminous concrete pavements, including stop bar lines, arrows, parking stall lines, crosswalks, and miscellaneous detail work such as railroad crossings and bicycle path diamonds. All work must adhere to the MUTCD 2003 edition, CTDOT Form 816, and ASTM D4505 standards. Bidders must provide manufacturer spec sheets for all paints, thermoplastic materials, epoxy resins, and pavement marking tapes used. The contract will be awarded to the lowest responsible bidder based on price, qualifications, past performance, and the ability to perform work during off-hours and handle small jobs. Required bid documentation includes evidence of experience painting public roads, a list of three municipal references from the past two years, and a detailed equipment list. Successful contractors must maintain work in good repair for 90 days post-completion and may be required to provide a performance bond for 100% of the contract value. Administration is handled via the Euna portal, and awarded vendors must pay a 1% administrative fee to the Capitol Region Council of Governments on a quarterly basis. There is no set-aside status for this solicitation.
DAS Procurement

POSTED

about 2 hours ago

DEADLINE

in 21 days
View Details

More opportunities from Westmorland and Furness Council

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS