This Government Contract opportunity from Department Of Commerce was posted on December 13, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The National Oceanic and Atmospheric Administration (NOAA) solicited firm fixed price proposals for drydock repairs to the NOAA ship PISCES, a 208.6-foot vessel homeported in Pascagoula, Mississippi. The scope of work includes a comprehensive set of base items such as general drydocking, sea valve overhauls, zinc and cathodic protection renewals, ABS drydocking surveys, hull painting, and various mechanical overhauls of the bow thruster, anchor windlass, and chill water pumps. Additionally, the contract includes option items for system upgrades, including a Dynamic Positioning system, GMDSS and ECDIS installations, radar and Doppler speed log upgrades, and interior refurbishments such as stateroom carpet and deck tile replacement.
The performance period was scheduled for approximately 75 calendar days, beginning around January 1, 2017, and ending around March 17, 2017, with work performed at the contractor's facility. The acquisition was conducted as a Request for Proposals under FAR Part 15, requiring bid, performance, and payment bonds, and including a liquidated damages clause. Award was based on best value, considering price and past performance. Technical execution of the work is governed by various NOAA Atlantic Marine Center standard specifications and manufacturer manuals covering electrical rotating machinery, coating systems, and HVAC balancing.
PDF, High priority: read this first3 pages · specifications
HighAI Summary for 256 Main Seawater Cooling System Diagram - Component List: Component list for document 256 covering the main seawater cooling system diagram. It enumerates tagged equipment and fittings, including valves, pumps, strainers, heat exchanger, hoses, flexible joints, temperature and pressure gauges, and a pressure switch. The content appears to be part of a multi-sheet engineering drawing/specification package, with item numbers, sizes, service descriptions, remarks, and several entries marked not used or model-specific. No solicitation or contract terms are present; this is a technical component schedule.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for 529 Bilge and Ballast System Diagram - Component List: Component list for drawing 529 Bilge and Ballast System Diagram. It identifies valves, strainers, pressure indicators, pumps, manifolds, and couplings for bilge, ballast, and fire service systems, with item numbers, sizes, service types, and remarks such as remote actuation, quick-closing features, USCG category A, and ABS approval. The file appears to be a technical equipment schedule associated with a vessel system diagram.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for 6001-5 U.S. Standard Bus Connection Bolt Torque Values: PEARL Reconditioning Standards reference 6001-5 dated 11-2008 for U.S. Standard Bus Connection Bolt Torque Values. The document provides Table 1 with torque values by bolt diameter for heat treated steel fasteners across SAE grades 1, 2, 5, 7, and 8, including minimum tensile strengths. It also includes torque guidance for silicon bronze, stainless steel, and aluminum alloy fasteners, with notes on lubrication, alloy requirements, and tensile strength minimums.
PDF
PDF, High priority: read this first8 pages · sow
HighAI Summary for 703280B1 - T2+ System Description, Labels and Drawings: System description document for the T2+ installation, including labels and drawings. It explains the operation of the T2+ system, the working of the two devices, and provides illustrations and labeling guidance. The content references speed indications, display placement, and related configuration details for the system components. The file appears to be a technical/installation-oriented document rather than a solicitation or award.
PDF
PDF, High priority: read this first2 pages · sow
HighAI Summary for ABS Drydocking Survey Checklist – Pisces (07-Jun-2016): American Bureau of Shipping Drydocking Survey checklist for vessel PISCES, Class No. 09161926, dated 07-Jun-2016. The document lists underwater/drydock inspection items and notes for hull, rudder, propeller, stern bearing, sea chests, valves, nonmetallic expansion pieces, thrusters, and related fittings. It includes survey requirements, examination criteria, and references to special periodic survey guidance.
PDF
PDF, High priority: read this first22 pages · specifications
HighAI Summary for AMC-000-1F Standard Specification for Ship Repair Work: August 1995 standard specification AMC-000-1F, superseding AMC-000-1E (June 1993), issued by NOAA Atlantic Marine Center. It sets out the general requirements for ship repair contract work on NOAA ships, including scope, references, definitions, condition reports, progress meetings, required personnel information, and protective covering requirements for interior work. The document provides baseline contractual and technical requirements to be invoked by solicitations and related procurement documents.
PDF
PDF, High priority: read this first7 pages · specifications
HighAI Summary for AMC-000-2C Standard Specification: Temporary Services at Contractor Facilities: August 1995 NOAA Atlantic Marine Center Standard Specification AMC-000-2C, superseding AMC-000-2B (October 1990), for temporary services at contractor facilities. It sets general requirements for servicing NOAA ships while in a contractor’s yard, including utility connections, gangways, fenders, electric power, potable water, telephones, fax service, sanitary/cooling water, steam, sewage and garbage disposal, temporary toilets, and fire alarm system requirements. The document includes operational timelines, safety and contamination controls, and potable water compliance references.
PDF
PDF, High priority: read this first10 pages · specifications
HighAI Summary for AMC-300-1 Standard Specification: Overhaul of Electrical Rotating Machinery: September 1988 NOAA Atlantic Marine Center Standard Specification AMC-300-1 for the overhaul of electrical rotating machinery. It establishes general requirements and procedures for overhauling electrical motors and generators on NOAA ships and boats, including contractor responsibilities, removal/reinstallation guidance, cleaning methods, inspections, electrical tests, and repair criteria. The document includes detailed technical requirements and measurement limits, making it a critical procurement technical specification.
PDF
PDF, High priority: read this first3 pages · sow
HighAI Summary for AMC-583-1B General Requirements for Liferaft Inspections: NOAA Atlantic Marine Center Standard Specification AMC-583-1B, December 1998, superseding AMC-583-1A (July 1995). This specification sets the general requirements and procedures for contractor-performed U.S. Coast Guard inspections of NOAA liferafts and hydraulic releases. It includes scope, references to 46 CFR parts 160.151 and 160.062, contractor obligations, annual inspection requirements, special five-year inspection requirements, hydraulic release inspection requirements, and notes on information to be provided by the detail specification or other procurement documents.
PDF
PDF, High priority: read this first6 pages · specifications
HighAI Summary for AMC-634-1B Deck Coverings Specification: March 2005 standard specification AMC-634-1B from NOAA Atlantic Marine Center, superseding AMC-634-1A (September 1991). It sets general requirements for removal and installation of deck coverings on NOAA ships, including preparation of surfaces, primer and underlayment requirements, installer qualifications, color selection, and detailed installation instructions for deck tile, monolithic deck covering, and quarry tile systems. The document also includes material standards, adhesion, grouting, curing, and protection requirements.
PDF
PDF, High priority: read this first2 pages · amendment
HighAI Summary for Amendment 0001 - SF 30 Amendment/Modification: Standard Form 30 amendment/modification document for a solicitation or contract. The content provides general SF 30 instructions and notice language requiring offerors/contractors to acknowledge receipt, with references to amendment and modification blocks, signature requirements, effective date, accounting data, and description of changes. Filename indicates Amendment 0001, but no specific solicitation number or change details are populated in the text provided.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0002 for Solicitation EA-133M-16-RP-0112: Amendment 0002 to solicitation EA-133M-16-RP-0112, issued by NOAA/ERAD on 09/28/2016. The document modifies the Schedule of Prices by removing Work Item 502 and provides several technical corrections to the specifications for the NOAA SHIP PISCES (r 226) FY 2017 drydocking and repairs. It also includes a Q&A section addressing vendor inquiries regarding pump serial numbers, coating requirements, submission methods, and technical manuals.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for ANSI/ASHRAE Standard 151-2002: Shipboard HVAC&R Systems: ANSI/ASHRAE Standard 151-2002 provides uniform and systematic practices for measuring, testing, adjusting, and balancing heating, ventilation, air-conditioning, and refrigeration (HVAC&R) systems on board ships. Approved in 2002, the document defines instruments, electrical measurements, air and hydronic system testing, and reporting procedures to verify if design conditions are met and to monitor system performance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Bearings, Lineshaft and Thrust Model: SKF and Michell Bearing Manual: Technical manual (FRV40-226-005-010) published by direction of NOAA, dated 18 SEP 2007. It provides description, operation, installation, and maintenance instructions for Lineshaft and Thrust Bearings (SKF and Michell models) for ship FRV40-226 under contract 50-SPNA-1-00031. The document includes technical details on bearing applications, components, and validation records.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Chill Water Plant Technical Manual (Model 30HXS086R-140): Technical manual for the Carrier Transicold Model 30HXS086R-140 sea water cooled marine screw chiller, provided under contract 50-SPNA-1-00031 for NOAA vessel FRV 40. The document includes description, operation, installation, and maintenance instructions, including technical specifications for refrigerant charge, power requirements (575V), and water flow limits.
PDF
PDF, High priority: read this first334 pages · specifications
HighAI Summary for Consilium SAL T2/T2+ System Manual Article No. 702270L2: System manual / technical description for Consilium SAL T2 and SAL T2+ speed logs, Article No. 702270L2. The document outlines the purpose of the speed log system, system description, block diagrams, typical configurations, component listings, and technical specifications. It also includes operating principles, installation/service notes, display and processing unit details, and related drawings/diagrams. This appears to be a vendor manual supporting installation, configuration, and maintenance rather than a solicitation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Docking Drawing M283-085-FA04: Technical drawing and specification document (Doc No. M283-085-FA04) detailing docking data, power supply monitoring systems, and equipment lists. It includes general notes for contractors, a bill of materials, legends for sensors and controllers, and detailed plan views for power supply and load monitoring systems.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for dwg085-_FA01_Outboard_Profile: Technical drawing and specification document for an outboard profile of a vessel. It includes general construction notes (steel hull, aluminum deckhouse), detailed vessel characteristics (length, beam, draft), and hull applicability designations. The document is property of VW Group.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for DWG 528 Grey and Black Water System Diagram: Technical plumbing/system diagram and location list for Grey and Black Water drainage, including gravity drain pipe size design data, fixture-to-pipe sizing, drainage location tables by deck/space/source, and item/assembly callouts. The content references multiple levels and fixtures such as lavatories, showers, deck drains, service sinks, eye washes, toilets, and drink fountains, plus size/type/remarks details and NAVSEA-related hose and discharge components. Likely part of drawing package DWG 528, sheet set for grey and black water system layout.
PDF
PDF, High priority: read this first11 pages · sow
HighAI Summary for EA-133M-16-RP-0112 Subcontracting Plan Outline: Subcontracting plan outline for solicitation EA-133M-16-RP-0112 from the U.S. Department of Commerce. This document provides guidance and required fields for preparing a FAR Subpart 19.7 subcontracting plan, including plan type selection, acquisition cost, subcontracting goals, table of subcontracted products/services, methods for developing goals, indirect/overhead treatment, and program administrator responsibilities. It references FY 2016 subcontracting goals and eSRS annual reporting requirements.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Egg Sampling System Diagram - Component List: Component list for the Egg Sampling system diagram, identifying equipment items and service numbers for valves, pressure indicator, hose assemblies, pump, and continuous underway fish egg sampler (CUFES). Includes item numbers, descriptions, remarks, and notes such as M283/M284-only applicability, not used entries, and pump operating details. No solicitation or award language is present.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for FA-05 Fire Control Plan - General Notes: Technical specifications and general notes for a vessel's Fire Control Plan. The document details requirements for fireman's outfits, portable fire extinguishers, SOLAS hose requirements, bulkhead classifications, and damage control locker contents. It includes references to 46CFR regulatory compliance and specifies the placement and storage of fire safety equipment.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for FA17 Mission Equipment and Rigging Arrangements: Technical drawing specifications and arrangements for mission equipment and rigging, including crane reach, net outhaul operations, and tram door operations. The document contains detailed plan and side elevation views, drawing indices, and specific hardware requirements (e.g., valve steel plates and stud welded trimlines) under drawing numbers M282-591-FA17 and M279-591-FA17.
PDF
PDF, High priority: read this firstsow
HighAI Summary for FAR-2117/2127/2817/2827 Installation Manual: Installation manual for FURUNO MARINE RADAR/ARPA models FAR-2117/2127/2817/2827 and BB variants, Pub. No. IME-35190-P2 (Jan. 2004; P2 Sep. 14, 2015). Includes safety instructions, equipment lists, system configuration, mounting, wiring, setting and adjustment, optional equipment installation, I/O data, outline drawings, and interconnection diagrams. Contains critical installation requirements, compass safe distances, power and RF radiation warnings, and part/cable listings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for FE01 Power One Line Drawing: Technical drawing and general notes for a vessel's power one-line system. It specifies compliance with ABS, USCG, and IEEE 45 standards, detailing circuit breaker settings, cable requirements (low smoke halogen), and controller specifications for propulsion and ship service loads.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Food Service Equipment Technical Manual - FRV40-226-035-010: Technical manual and specifications for Food Service Equipment provided under contract 50-SPNA-1-00031 for ship FRV40-226, approved by NOAA. The document includes an approval record, validation performance page, and detailed technical specifications for various galley equipment, specifically focusing on the Lang Marine 36 Series Range, including electrical data, dimensions, and construction details.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for FP02 Vents and Sounds System Diagram: Technical drawing and specifications document for a Vents and Sounds System. It includes general construction notes referencing 2001 LNRD 90 meter manuals and ASTM D1392 standards for pipe work and fittings, as well as specific details for tank or compartment vents (Details C-6-E and C-7-A).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for FP16 Chilled Water System Diagram: The document appears to be a technical specification or diagram related to a chilled water system (FP16). It contains technical data including electrical terminal details (1/4 inch square plug terminals), power supply labels (Main, Backup, Load Test), and a fully automated system reference, although the provided text content is fragmented and contains significant noise.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for FP18 Scientific SW System Diagram: Technical drawing and specification document for the FP18 Scientific SW System. It contains general notes on ship contracting, nominal speed tables, conversion tables for PSI to metric, and a revision list regarding pump transmission ratios.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for FP19 Seachest Diagram Rev. 6 Component List: Seachest diagram component list, Revision 6, for FP19. The document lists item numbers, sizes, service, and descriptions for seachest gate valves (ROV on 2nd deck/w with Monel trim), including several valve line items and one marked not used.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for FP23 Aux Seawater Cooling System Diagram Component List: Component list for the FP23 Auxiliary Seawater Cooling System Diagram. The document identifies numbered items, sizes, descriptions, and remarks for hoses, valves, pressure indicators, pressure switches, and pumps, including ABS/SAE J-1942 references and vendor-furnished notes. It appears to be a technical equipment/component schedule supporting the seawater cooling system, with no solicitation language.
PDF
PDF, High priority: read this first85 pages · sow
HighAI Summary for FRV40-22 6-004-010 Rev 2 Anchor Windlass Manual: Description, Operation, and Maintenance Instructions manual for an Anchor Windlass, Rev. 2, dated 13 June 2008. It includes NOAA approval and procurement record information for contract 50-SPNA-1-00031 and covers safety rules, installation requirements, operating performance, electrical requirements, features, lubrication, maintenance, and recommended spares.
PDF
PDF, High priority: read this first38 pages · sow
HighAI Summary for FRV40-22 6-011-010 Cathodic Protection System Manual: Technical manual for the Cathodic Protection System, Model ICCP 50A, under contract 50-SPNA-1-00031 for NOAA/Halter Marine. Dated 05 July 2007, it includes description, operation, installation, maintenance instructions, record of changes, approval and procurement record, validation performance, and a foreword outlining chapters for installation, operation, maintenance, fault finding, corrosion principles, cathodic protection theory, and drawings.
PDF
PDF, High priority: read this first327 pages · specifications
HighAI Summary for FRV40-22 6-134-010 Knuckle Boom Crane Manual: Technical manual for the Knuckle Boom Crane, Model KB120-67, published by direction of NOAA on 05 July 2007. It includes description, operation, installation, maintenance and service instructions, drawings, manufacturer inserts, test procedure and acceptance report references, and recommended spare parts. The document also contains approval and procurement record data tied to contract 50-SPNA-1-00031 and validation/performance certification information.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Furuno Marine Radar/ARPA Installation Manual (FAR-2137S/2837S/2137S-BB): Installation manual for Furuno Marine Radar/ARPA models FAR-2137S, 2837S, and 2137S-BB, updated September 14, 2015. The document provides comprehensive technical instructions on mounting, wiring, setting, and adjustment of antenna, monitor, processor, and control units. It includes critical safety instructions regarding RF radiation, electrical shock hazards, magnetic compass safe distances, and detailed equipment lists with part numbers.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for HB-085 FA02 General Arrangements: Technical drawing and general arrangements document (FA02) for a vessel, including general notes on equipment locations, fire-rated walls, and superstructure construction. It includes a reference list of layouts (e.g., bridge deck, machinery room) and a document distribution record involving Noise Cont Chand LLC.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for HB-163_FP19_Seachest_Diagram: Technical diagram or specification document related to a seachest for HB-163 FP19. The provided content contains a numbered list or table of items.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for HB-243 Shafting Layout and Details: Technical specifications and layout details for shafting (HB-243), including NPTF threading specifications, component technical data (voltage/current ratings), and dimensional parameters dated December 7, 2023.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for HB-512 FV02 HVAC Diagram General Notes: Technical specifications and general notes for HVAC equipment installation, including ductwork fabrication, insulation, mounting requirements, and bulkhead fitting standards. Includes a symbols and abbreviations key for HVAC systems and marine-quality construction requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for HB-631_FF04 Paint Schedule: Technical paint and coatings specification document dated 06/01/2023. It details surface preparation (SSPC-SP-10, SP-7), material requirements (Powder Coated Steel ASTM A653), and specific coating systems using Amercoat and Dimetcote products. The document provides detailed application data including Wet Film Thickness (WFT), Dry Film Thickness (DFT), spread rates, and overcoat times for various vessel areas such as the hull, sea chests, and exterior decks.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Hull Forebody Scantlings FR 0 - FR 18: Technical drawing and specifications document for the hull forebody scantlings (Frames 0 to 18). It includes general notes on vessel classification (OCS A1, CROLE E), material requirements, welding standards, and specific connection details for the vessel's structure.
PDF
PDF, High priority: read this first203 pages · specifications
HighAI Summary for M282-512-FV01 HVAC Loads As-Built Index and Notes: Index and general notes sheet from drawing M282-512-FV01 for the NOAA FRV40 Class 63m vessel HVAC load calculations. Dated 09/14/2006 and revised to suit as-built conditions (Rev 1). Includes title/index pages, revision status, references, general notes, list of spaces, and air-conditioning/ventilation system summary sheets. Also references thermal insulation and ship HVAC design bulletins used for the calculations and explains room load sheet numbering and heat load symbols.
PDF
PDF, High priority: read this first12 pages · specifications
HighAI Summary for MOC-631-2D Standard Specification: Coating Systems for Steel Surfaces: August 2004 NOAA Marine Operation Center Standard Specification MOC-631-2D covering coating systems for steel surfaces on NOAA ships and boats. It sets general requirements for surface preparation, environmental conditions for painting, coating application, dry film thickness measurement, protection of adjacent equipment, and referenced SSPC/NACE standards for blast cleaning and other surface prep methods.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Navi-Sailor 4000 ECDIS Installation Guide v2.00.323: Installation Guide for Navi-Sailor 4000 ECDIS, version 2.00.323, dated December 2011. The document provides service-engineer instructions for hardware installation, system settings, software installation, configuration, chart setup, software upgrade, technical specifications, interface capabilities, warnings and cautions, compass safety distances, MTBF information, and annexes. It is a technical installation manual for deploying and commissioning the navigation system.
PDF
PDF, High priority: read this first63 pages · sow
HighAI Summary for NAVSEA FY-09 Item 009-32 Cleaning and Painting Requirements: NAVSEA Standard Item FY-09, Item No. 009-32 dated 19 Jul 2007. This document sets cleaning and painting requirements for ship preservation work, including surface preparation, abrasive blast media certifications, coating application rules, storage conditions, masking, restoration of markings, and references to applicable standards and manuals. It includes detailed technical requirements for coatings, anti-fouling systems, and acceptable surface cleanliness and profile criteria.
PDF
PDF, High priority: read this first90 pages · sow
HighAI Summary for NOAA Ship PISCES FY17 Drydocking and Repairs Detail Specification: Detail specification for NOAA Ship PISCES (R 226) FY17 drydocking and repairs, dated July 2016. The document defines the scope, general requirements, references, QA/test and inspection planning, ABS survey coordination, weight reporting, drawing updates, and contractor performance requirements. It also lists basic work items, additional work items, and option items covering drydock work, repairs, coatings, inspections, system overhauls, and equipment renewals.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for OD-581-002 Revision C - Anchor Handling Modifications: Technical drawing and specifications for anchor handling modifications on a vessel. The document details the installation of new chain stoppers, hawse pipes, and anchor pockets, including specific material requirements (Grade A), welding standards, and structural modifications to the main deck and side shell. It includes detailed sectional views, elevation drawings, and general notes for construction.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Purifier, Fuel Oil/Lube Oil Model PU 100 Manual: Technical manual (FRV40-226-085-010) for the Model PU 100 Fuel Oil/Lube Oil Purifier, published by direction of NOAA and provided under contract 50-SPNA-1-00031 by Halter Marine, Inc. The document contains detailed instructions for description, operation, installation, and maintenance, including safety protocols, system descriptions, alarm/fault finding, and a spare parts catalogue.
PDF
PDF, High priority: read this first48 pages · sow
HighAI Summary for RC18xx Series GMDSS Console Installation Manual: Furuno USA installation manual for the RC18xx Series A3 GMDSS console, covering mechanical installation, grounding, wiring, battery requirements, equipment installation, and setup for associated radios and components. It includes console layout drawings, interconnect references, power supply and charger connections, NMEA/IEC-61162 wiring, equipment lists, parts lists, and installation instructions for Felcom 18, FM-8900, FS-1575/FS-2575, IB-585, and related items. The content appears to be a technical installation guide rather than a procurement solicitation.
PDF
PDF, High priority: read this first36 pages · rfp
HighAI Summary for RFP EA133M-16-RP-0112 Solicitation, Offer and Award: Solicitation, Offer and Award form (Standard Form 33) for solicitation EA133M-16-RP-0112, issued 08/10/2016 by NOAA Eastern Region Acquisition Division. This is a negotiated RFP for ship drydocking and repair services, with detailed CLIN pricing, base items, growth work/AIRs, option CLINs, submission instructions, and evaluation/award information. The schedule includes numerous maintenance and overhaul work items, unit pricing fields, and contract offer/award sections.
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
6 updates
PhaseAwarded
Posted
Presolicitation
Notice updated
The notice description changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Response deadline changed from Sep 8, 2016 to Oct 7, 2016. The notice description changed.
Type Changed
Presolicitation → Solicitation
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
The National Oceanic and Atmospheric Administration (NOAA), Eastern Region Acquisition Division, Norfolk, VA, on behalf of the Office of Marine and Aviation Operations (OMAO), is soliciting for the drydock repairs to NOAA ship PISCES. The PISCES is 208.6 feet long overall, and its home port is Pascagoula, MS. Provide all labor, material, and equipment necessary to perform the following (including, but not limited to): BASE ITEMS: General Requirements; Temporary Services; Drydocking and Routine Drydock Work; Sea Valve Overhauls; Zinc Renewals and Additional Zinc Anode Installations; Cathodic Protection System Inspection and Anode Replacements; ABS Drydocking Survey; Bow Thruster Inspection; Ground Tackle Inspection and Preservation; Annual Fire Inspection; Annual Life Raft Inspection; U/W Hull Complete Paint System; Free Board Coating; Propulsion Shaft Thrust Bearing Inspection; HVAC System Rebalancing; Preservation (Stern Gate Trunk and Laundry Exhaust Trunk); Hydraulic Hose Renewals; Miscellaneous Repairs; Integrated Trawl Instrumentation (ITI) Reorientation; Forward Crane Pump Overhaul/Motor Rewind; Anchor Windlass Overhaul; Aft Deck Tile Replacement; Chill Water Pumps and Motor Rebuilds; Clean Transformers (T1, T2 and Main Motor); Acoustic Doppler Current Profiler (ADCP) Renewal; Renew Hoses on Fuel Oil Purifier (FOP); Dock and Sea Trials. OPTION ITEMS: Bow Thruster Drive A/C Mods (Rockwell Cabinet Fans); Dynamic Positioning (DP) System Installation; 480 Outlets Design/220 Transformer; Salad Bar Renewal; Stateroom Carpet Replacement; Main Passageway Deck Tile Replacement with Polymeric Deck Covering (PRC); GMDSS Upgrade; Electronic Charting and Display Information System (ECDIS) Installation; Radar Installation; Doppler Speed Log Upgrade to Consilium. The solicitation will include a liquidated damages clause, as well as a requirement for bid, performance, and payment bonds. The performance period will be approximately 75 calendar days, with a start date on or about January 1, 2017 and a completion date on or about March 17, 2017. Place of performance shall be the contractor's facility. Ship's transit time to and from the place of performance is not included in the specified performance period. The date, time and place for an inspection of the ship is August 23, 2016, 9:00 a.m. (local time) at Naval Station Newport - Pier 2, 68 Peary Street, Newport, RI. Appointments and arrangements for attending the ship inspection can be made by contacting the Port Engineer, Mr. Brian L. Kelly, on or before noon on August 19, 2016 at +1 (555) 000-0000 or +1 (555) 000-0000 or by Email at contact@example.gov. Contact information for personnel attending the ship inspection must be provided to the Port Engineer. The acquisition will be issued as a Request for Proposals (RFP) in accordance with FAR Part 15. A copy of the Statement of Work (SOW) is attached to this notice for reference for those planning to attend the ship check. The RFP was issued on August 10, 2016. The proposal due date of September 8, 2016 is extended to October 7, 2016 by Amendment 0001. The anticipated award date is November 23, 2016. This procurement is unrestricted; all responsible sources may submit an offer which shall be considered by the agency. The Government anticipates awarding a firm fixed price contract to the contractor whose proposal represents the best value considering past performance, price and price related factors. The RFP will be issued via electronic posting on the Federal Business Opportunity (FBO) web page www.fbo.gov. Hard copies of the RFP will not be issued. It is incumbent upon contractors to monitor FBO for the release of the RFP, specifications, drawings and all subsequent amendments. The specification will be uploaded to www.fbo.gov with the RFP. Prospective offerors who are interested in submitting a proposal for this acquisition are encouraged to register with the FedBizOpps Vendor Notification Service and to be on the Interested Vendors List for this acquisition (see applicable tab within FBO where this synopsis is posted). Offerors must be registered in the System for Award Management (SAM) database at www.sam.gov/portal/public/SAM; offerors must also obtain a Data Universal Numbering System (DUNS) number and provide it with the offer. For information concerning this acquisition, please forward inquiries via e-mail to Michelle Blake, at contact@example.gov or via telephone at +1 (555) 000-0000.
More opportunities from Department Of Commerce Noaa