Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on August 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DSC_J-472-DB - Utilities Upgrades, Phase 1

Closed
PE-47200-RFQ-2027-000000148State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of new gravity sewers, manholes, and a fully operational pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The project has an estimated value of 16,690,000 dollars. This solicitation is set aside for Small Businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation criteria focusing on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. The agreement is based on EJCDC standard forms, requiring performance and payment bonds, as well as proof of insurance. Bids are due by November 10, 2026, with a final bid opening date of November 12, 2026. Contract administration involves monthly progress payments due 30 days after presentation to the owner, subject to review by the Engineer and the Resident Project Representative. The contractor must adhere to rigorous technical standards, including AWS D1.2 for welding and NEMA standards for motors. Materials must be delivered in original manufacturer packaging with specific labeling and storage requirements, such as maintaining a minimum ambient temperature of 45 degrees Fahrenheit for coatings. The project commences upon the issuance of a Notice to Proceed, which typically occurs within 30 to 60 days of the bid opening or effective date.
Don Moorhead Construction, Inc.

POSTED

19 minutes ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of FRP reinforcing systems. Mechanical and structural requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation of new slide gates and modifications to existing sluice gates. Additional technical tasks include the rehabilitation of reactor mixers and aerators, the installation and operation of a temporary 11 MGD pumped bypass, and extensive electrical and instrumentation upgrades, including the replacement of motor control center components. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Requested services and supplies include lead abatement, metals fabrication, painting and coatings, trucking and hauling, and the provision of access hatches. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Submissions should be based on Garney Standard PO and Subcontract Forms, with any exceptions submitted as redlines.
Garney Pacific, Inc.

POSTED

19 minutes ago

DEADLINE

in 20 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities (Project No. EN19001.03) and Butterfield Lift Station Improvements (Project No. EN26054) located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of a new Mountain Avenue Lift Station with two submersible pumps and a new SCE power connection, modifications to the RP-2 Lift Station to include a standby generator and an elevated electrical platform for flood protection, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operation. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and electrical and instrumentation and control. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on encouraging participation from minority-owned and disadvantaged business enterprises. Bids are due by October 29, 2025, at 2:00 PM.
Filanc

POSTED

19 minutes ago

DEADLINE

in about 8 hours

AI Contract Overview

Show more

The Board of Regents of the University System of Georgia, acting on behalf of Dalton State College in Dalton, Georgia, is soliciting Design-Build services for Project No. J-472-DB, Utilities Upgrades, Phase 1, through a two-step Request for Qualifications process. The project involves the comprehensive replacement and upgrade of aging underground utility systems across the campus, including sanitary sewer lines constructed of deteriorating clay, water lines made of aging ductile iron, and stormwater infrastructure, all while maintaining continuous campus operations. Additional scope includes ADA-compliant improvements to sidewalks and ramps, adherence to the Energy Efficiency & Sustainable Construction Act (O.C.G.A. 50-8-18), and implementation of quality assurance protocols with special inspections required. The work is anticipated to begin in Fall 2026, with construction documents due by Summer 2027, though actual construction initiation is contingent upon funding availability. The estimated Guaranteed Maximum Price is $4,382,100, with a stated construction cost limit of $4,050,000; however, the final contract value will be determined through post-qualification negotiations. Proposals are evaluated in two stages: first, through a qualifications review weighted 45% on relevant project experience, 30% on organizational suitability, and 25% on corporate stability, followed by finalist interviews that assess team qualifications, management plans, and communication effectiveness. Only firms that pass the initial qualifications review are invited to submit detailed fee proposals using mandatory exhibit formats for design, preconstruction, and construction costs, which must be submitted as a single, password-protected file. All submittals must be in electronic PDF format, not exceed 50 pages, and comply with strict formatting and naming conventions, uploaded via the designated BOR/Egnyte portal by the August 27, 2026 deadline. Contractors must demonstrate valid Georgia licensing, financial liquidity with a current ratio of 1.0 or higher, and safety compliance with an Experience Modification Rating of 1.2 or less. They must also certify compliance with Georgia’s E-Verify requirements under O.C.G.A. § 13-10-91, refrain from any criminal, debarment, or default history in the past five years, and disclose any prior business relationships or benefits provided to the Board of Regents or the college within specified timeframes. Insurance and bonding must originate from companies listed in the U.S. Treasury

General Info

Design-build contract for utilities upgrades at Dalton State College, due August 27, 2026, administered by Georgia Board of Regents.

Documents

9

DSC J-472 Utilities Upgrades Phase 1 Design-Build RFQ and RFP

PDF, High priority: read this firstrfq-rfp
High

Exhibit C - DB Fee Proposal for Project No. J-472 Utilities Upgrades Phase 1

DOCX, High priority: read this firstcontract-document
High

Exhibit E - General Conditions Breakdown

XLSX, High priority: read this first3 pages · cost-breakdown
High

Exhibit F - Project Cost Matrix for Utilities Upgrades Phase 1 at Dalton State College

XLSX, High priority: read this firstcost-proposal-matrix
High

Exhibit A Certification Form

DOCX, Low prioritycertification-form
Low

Exhibit B Contractor Affidavit for Utilities Upgrades Phase 1 at Dalton State College

DOCX, Low prioritycontractor-affidavit
Low

Exhibit D - Preconstruction Cost and Expenses Breakdown

XLSX, Low priority1 page · exhibit
Low

Exhibit G - Proposer's Disclosure Statement for Project J-472 Utilities Upgrades Phase 1

DOC, Low priorityproposers-disclosure-statement
Low

USG File Sharing Upload Instructions

PDF, Low priority4 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyBoard Of(university System of Georgia) Regents
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Mr. William Moody

Full Description

Show more
Design-Build Services for Project No. J-472-DB, Utilities Upgrades, Phase 1, Dalton State College, Dalton, Georgia. Please see the attached documents for project information and upload instructions. Questions about any aspect of the RFQ or the project should be submitted in writing to the contact listed above.

More opportunities from Board Of(university System of Georgia) Regents

Same awarding agency

New
SLED
UGA_BR-10-2702 DP Oglethorpe House Renovation
Solicitation # PE-47200-RFQ-2027-000000162
The Board of Regents of the University System of Georgia is soliciting design professional services for the renovation and modernization of Oglethorpe House, a nine-story residential facility encompassing approximately 93,538 square feet in Athens, Georgia. The project aims to address aging building systems and facility deficiencies while ensuring compliance with current life safety, accessibility, and operational standards. Key scope requirements include modernizing mechanical, electrical, and plumbing infrastructure, installing a fire command center, an emergency generator, and stairwell pressurization systems, as well as increasing the number of ADA-compliant rooms and providing a stretcher-compliant elevator cab. The estimated construction cost is 33.5 million dollars, with a design professional base fee of approximately 2.345 million dollars. The selection process is a multi-step evaluation following the State Construction Manual. Initial qualifications are weighted based on relevant project experience (45 percent), suitability for the project (30 percent), and firm stability (25 percent). Finalists will be interviewed and evaluated on team qualifications (50 percent), design methodology (25 percent), and communication skills (25 percent). Proposers must submit a PDF package not exceeding 50 pages to the BOR Egnyte platform by November 17, 2026, at 2:00pm. Required documentation includes notarized certification forms, a contractor affidavit for the Georgia Security and Immigration Compliance Act, and a proposer's disclosure statement. All designs must adhere to the campus master plan and the Energy Efficiency and Sustainable Construction Act of 2008, with Georgia Peach certification required during commissioning.

POSTED

1 day ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS