This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on March 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DSCR B15 C-Bay Renovation of Office Space, Restroom, and Break Room

Closed
SP470326Q0018Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, with a response deadline of November 4, 2026. The project falls under NAICS code 236220 and focuses on basin improvements within the Riverside or Los Angeles project areas. A critical component of this solicitation is strict adherence to six Good Faith Effort (GFE) requirements designed to ensure DBE participation and secure project financing. Bidders must provide proof of GFE #2, which requires posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of GFE #5, involving the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit documentation for these two specific efforts within the bid package will result in the proposal being deemed non-responsive. Additionally, outreach documentation for GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 3 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, and the contractor must maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation encourages participation from small and disadvantaged businesses, including DBE, DVBE, MBE, WBE, and SBE certified firms. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors are required to use the Textura electronic invoicing system, provide a 100 percent performance and labor bond if requested, and adhere to arcflash compliance for electrical work. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026.
C. Overaa & Co.

POSTED

about 3 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 3 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes saw cutting reinforced concrete walls, installing a commercial-grade exterior door assembly with panic hardware, and excavating a permanent ADA-accessible egress path with required drainage, retaining walls, and handrails. The contractor must ensure all work is code-compliant, coordinate inspections with the Authority Having Jurisdiction, and restore all affected surfaces to match existing clubhouse architecture. This is a price-based invitation for bids where the award will be granted to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements. Preference is tiered from 100% Colville Business Enterprises down to non-certified Indian-owned businesses, with allowable price differentials based on the total bid amount. Bidders must submit a firm fixed price bid, a performance schedule, a subcontracting plan, and evidence of financial stability, insurance, and licensing by November 20, 2026. The project is expected to be completed by March 31, 2026, though this date is weather-dependent. Final contract terms and payment conditions will be negotiated upon the selection of the successful bidder.
Confederated Tribes of the Colville Reservation

POSTED

about 3 hours ago

DEADLINE

in about 1 month

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Richmond, VA, 23237, USA

Set-Aside

SBA

Documents

8

Amendment 0001 to RFQ SP470326Q0018 - Bonding Requirement and Deadline Extension

PDF, High priority: read this firstamendment
High

DLA Installation Management Richmond Building 15 Offices and Bathroom Repairs SOW Rev1

PDF, High priority: read this firstsow
High

Q and A Matrix for DSCR B15 TP1 Offices and Bathroom Project

XLSX, High priority: read this firstq-and-a
High

Solicitation SP4703-26-Q-0018 for Commercial Services Repair at DSCR

PDF, High priority: read this first30 pages · rfq
High

Solicitation SP4703-26-Q-0018 for Commercial Services Repair Project

PDF, High priority: read this firstrfq
High

Statement of Work for Building 15 TP1 Offices and Bathroom Repairs

PDF, High priority: read this first53 pages · sow
High

Wage Determination VA20260017 for Chesterfield County, VA Building Construction

PDF, High priority: read this first6 pages · wage-determination
High

Site Visit Attendance Sheet

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Mar 24, 2026 to Mar 27, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Dcso Richmond Division #1
Contacts2 people available
OfficeRICHMOND, VA, 23237, USA
Office AddressRICHMOND, VA, 23237, USA
Contacts
Robert Moragues Contracting Officer
Kyle Gregory Contracting Officer

Full Description

Show more

Solicitation SP470326Q0018 has been amended to include a bonding requirement, and extend the solicitation close date until COB 03/27/2026.


The Questions and Answers, Site Visit Attendance Sign-in, and revised SOW have also been added as attachments. The SOW has been updated to reflect any changes resultant to Questions received. Refer to revised SOW document SOW_Rev1 DSCR B15 TP1 Offices and Bathroom.pdf for full requirement description; this supercedes prior requirement details, and details found on the continuation page of both copies of the SF1449. Refer to amended solicitation SF1449 SP470326Q00180001.pdf for full and complete applicable clauses and provisions.


Amendment document SF30 SP470326Q00180001.pdf has been added as an attachment. The SF30 is the formal amendment document, however, it does not contain the full solicitation amendment details - for full solicitation amendment details please refer to document SF1449 SP470326Q00180001.pdf



This notice is a combined synopsis/solicitation for commercially available services prepared in accordance with the format in FAR Part 12, and supplemented with additional information included in this notice. The solicitation number SP470326Q0018 is issued as a request for quote(RFQ). Award will be made to the Lowest Priced Technically Acceptable offeror.


The resulting contract will be a firm-fixed price award with an expected Period of Performance of 140 days from issuance of notice to proceed.


Disclosure of magnitude: the estimated magnitude of the award is between $150,000.00 - $200,000.00


This acquisition is set-aside for 100% small business.


The North American Industry Classification System (NAICS) Code is 236220 (Repair or Alteration of Office Buildings).


The small business size standard is $45M.


Department of Labor Wage Determination based on location of the service provided (Chesterfield County, VA).


Partial proposals will not be accepted.


A site visit will be held on 03/12/2026@0930. See "Additional Details" below for full text for parties interested in attending the site visit. Please note: Parties interested in attending the site visit MUST be vetted through security prior to the date of the site visit - vetting can take 5 business days, interested parties should plan accordingly.


Deadline for questions is COB 03/16/2026 - Questions and Answers will be publicly posted as an attachment to the same notice id on SAM.gov as the solicitation. Generally, answers will be posted to SAM.gov within 2 working days of the deadline for questions.


Deadline for quote has been extended until COB 03/27/2026.


Acceptable method of quote: Email to contracting officer Robert Moragues <Robert.Moragues@dla.mil>


*******************Specific Requirements*********************


For an offer to be considered for award, the contractor must own, possess, or otherwise control a bona fide place of business from which mobilization occurs within 125 miles of Defense Supply Center Richmond. A bona fide place of business refers to a location where the offeror regularly maintains an office with at least one full-time employee. The offeror must include the address of this location within the offer submitted.


OBJECTIVES:


The goal of this project is to repair and upgrade the bathroom, both office spaces, and the break area within Building 15 C-Bay of Defense Supply Center Richmond(DSCR). The purpose is to improve the condition, functionality, and overall quality of facilities that are currently in disrepair.


BACKGROUND:


The offices, break area, and bathroom within DSCR B15-C are currently in disrepair. These spaces require repairs and updates to ensure they are functional, safe, and suitable for employees.


SPECIFIC REQUIREMENTS


The contractor shall:


Bathroom:


• Replace the entrance door/frame with a steel door/frame, no lite. Include heavy duty closure, deadbolt with thumb latch to lock from inside. Pull handle inside and push plate outside. Paint this door and frame, two coats, both sides, Manor Brown. Add a 6”X12” plastic sign mounted to the door that identifies this bathroom as unisex.


• Clean the deep sink, toilets and urinals inside and out with a commercial cleaner and polish all items.


• Replace toilet seats with heavy duty, match color and type.


• Replace both sinks and plumbing (not in wall), approximately 20”X18”, center hole, white ceramic. Include single handle faucets. Remove the board the sinks are mounted on. Provide stainless-steel braided supply lines. Mount at same height as existing.


• Replace the toilet partitions with solid phenolic, solid color, color choice by customer.


• Add 2 partitions between the urinals, same type and color as above.


• Scrub/wash the floors with a commercial scrubbing machine/cleaner.


• Prepare all walls, conduit, and all other piping/components except fire sprinkler piping to receive paint. Remove defunct wall hangers. Ceiling is not in contract.


• Prime then paint two coats of paint on all walls, conduit and all other piping/components.


• Remove and reinstall all items from the walls as needed. Permanently affixed items can be painted around.


• Replace the exterior window with a similar style to existing, metal. Provide a proposed window system to use for approval. Match closely to the current window sizes, mullions, etc. non-operable, double pane insulated. The goal is to closely match the new window to existing. This doesn’t have to meet historical regulations.


• Provide and install an 8’ wide ceiling fan, no light, oil-rubbed bronze color, with wall mount wired controller (not remote) to control fan speed, mounted near the existing heater controller. Attach fan to “X” bracing near the ceiling in the room. Include a 12” down rod. Tie the fan into the fire alarm system so it turns off when an alarm is activated. The Big Ass Fan I6 is a known complying fan.


• Replace pop up drain vent.


• Remove all floor expansion joints and replace.


Office/Breakroom:


• Prepare, prime and paint both entrance doors and frames, both sides, Manor Brown, two coats. Replace thresholds and weather stripping.


• Provide heavy duty closure to both doors.


• For the front door and both sides of the warehouse door, add a box to accepted Lenel control panel. Add 1” conduit with pull string routed to within 1” of the cable tray in the warehouse adjacent to the office.


• Remove the existing window AC unit, support, drain and other components and dispose.


• Replace the entire wall panel to match the existing panels next to it, including insulation and thickness. The wall is about 3.5” thick.


• Secure the wall to ceiling metal grid that is loose.


• Caulk the wall to grid joints and verticals in the corners.


• Prepare and prime both sides of all these panels including the metal strips that join the panels together both sides. After priming an inspection is required. Provide two business days’ notice for this inspection.


• Paint these panels inside and out with two coats of paint. After the 1st coat an inspection is required. Provide two business days’ notice for this inspection.


• The exterior color shall match the brick color. The inside color shall match the color of all interior walls, off white. Exact color choice by customer, eggshell.


• Paint all exposed conduit, boxes etc. not ceiling items.


• Remove and replace all cove base, replace with black.


• Remove the existing VCT tile.


• Prepare the floor to accept new VCT 12”x12” tile, blue/grey texture. Provide physical submittal color pallet for customer choice.


• Follow VCT manufacture recommendations when applying a sealer and polish. 4 coats each. The current janitorial contractor uses Zep, 4-step system.


• Replace all ceiling lights with 2’x4’ LED lights, color selectable. Reuse existing wiring.


• Remove electric base board heating, conduit and wiring back to the panel and dispose.


• Remove the old wall mount phone and speaker and dispose. Cut wires and hide behind conduit.


• Prepare, prime and paint all walls. Color by customer, eggshell.


• Shorten the conduit that supplies the fire alarm strobe over the cabinets from its current location to 5’ closer to the door to make room for the mini split.


• Provide and install a minimum 26 Seer, 12,000 BTU mini split heat pump, Mitsubishi preferred. Mount above the break area cabinets centered. Route the condensate drain line to the exterior grass area. If the drain is run through the bathroom, run this drain line along the wall not through the center of the room.


• Prepare, prime and paint the drain line to match the surrounding wall color.


• Run a new circuit from the panel in the warehouse for the mini split. Provide a new correctly sized breaker.


• Provide a concrete pad for the mini split in the grass areas against the wall. 4” of #57 stone then 4” of 3000spi concrete. Pad to be 2” above grade. Bagged concrete is acceptable.


• Mount outdoor unit on concrete pad and bolt down.


• Remove and dispose of all cabinets.


• Remove the three supply and drain lines. Cap off in the bathroom.


• Provide new hot and cold SS supply lines and drain, for new cabinets and sink from the bathroom.


• Provide one 3’ double door base cabinet. Install base cabinet 4’ from the door. Base cabinet shall have drawers over each door.


• Provide one 3’ - 18” tall wall cabinet mounted 18” above the base cabinet.


• All drawers and doors shall have pulls and soft close hinges and slides.


• Provide 1 - 12”X12” undermount SS sink, 16 gauge, 8” deep.


• Provide a new gooseneck type faucet with built in sprayer.


• Provide a solid surface quartz countertop and 4” quartz backsplash with marbling, 1.25” thick. Provide physical samples for customer selection.


Large Office


• Remove the ceiling grid, tile and lights and dispose.


• Install new ceiling grid, white, the same height as existing. Install drop in textured tegular tile, fine fissured, white. All wall mounted ceiling grid shall be shadow type.


• Install 2’X4’ LED drop in lights the same amount and location as existing, color selectable. Reuse wiring.


• Prepare, prime and paint the warehouse entrance door and frame, both sides, Manor Brown, two coats. Replace threshold and weather stripping.


• Replace the entrance door with a metal door/frame, with half-light and built in mini blind between the glass, almond. Paint, Manor Brown, two coats.


• Provide lever handle, heavy duty stainless-steel.


• Provide heavy duty closure and weather stripping.


• Remove the sign on this door and reattach.


• Paint all trim the same color as the walls, semi-gloss.


• Trim out window.


• Replace the office door with the same size, type, lite size etc. as existing. Glass to have internal mini blind, almond.


• Paint storage door/frame, outside only.


• Remove the existing VCT tile.


• Prepare the floor to accept new VCT 12”x12” tile, blue/grey texture. Provide physical submittal color pallet for customer choice.


• Follow VCT manufacture recommendations when applying a sealer and polish. 4 coats each. The current janitorial contractor uses Zep, 4-step system.


• Replace all outlets, switches and plate covers, almond. Replace data plates almond.


• Remove and dispose of all the wood paneling and trim. There is no gypsum behind them.


• Dispose of all the existing wall insulation and replace with R-13 insulation except the interior office partition and storage room. After the insulation is installed, an inspection is required. Provide two business days’ notice for this inspection.


• Install 5/8” mold resistant gypsum wall board over all walls except the storage room, 6” above ceiling. Finish to level 4. Trim sheetrock edges that protrude around windows and doors with white plastic edging or similar to cover rough edges, paint to match wall color.


• For the warehouse door both sides, add a box to accept a Lenel control panel. Add 1” conduit with pull string routed to within 1” of the cable tray in the warehouse adjacent to the office.


Exterior Repairs


• Properly prepare both set of steps, risers, treads and handrails to receive paint.


• Paint all risers’ safety yellow, two coats semi-gloss.


• Paint the treads matt black with added Anti-Slip Floor Paint Additive, 1lb per gallon.


• Paint all handrails Manor Brown, semi-gloss.


• All areas to receive 2 coats of paint.


For all rooms


• Remove and dispose of all items remaining in the offices.


• Relocate the refrigerators, microwave into the warehouse and replace.


• Adjust all doors to close properly and meet ADA.


See SOW for complete project requirement detail.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS