Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from South Carolina was posted on April 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Ductile Iron Force Main Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The contract entails the installation of a 6-inch restrained joint ductile iron force main pipeline at depths ranging from 4 to 6 feet, incorporating necessary expansion joints and 45-degree bends to accommodate system flexibility and directional changes. The work is part of a municipal infrastructure project managed by the City of Columbia in South Carolina, with the scope focused on the construction and alignment of a pressurized wastewater conveyance system designed for durability and leak resistance. All materials must comply with industry standards for ductile iron piping and restrained joint technology to ensure structural integrity under operational stresses. The contract is classified as a subcontract under NAICS code 237110 for Utility System Construction and was posted on April 28, 2026, with a response deadline of May 28, 2026. It is open to eligible subcontractors seeking to participate in the City of Columbia’s public works initiative, though specific set-aside provisions are not indicated. The place of performance and point of contact details are not provided in the data, but interested parties can access further solicitation details through the official city procurement portal linked in the posting. All submissions must meet technical and scheduling requirements as specified in the full bid package.

General Info

Install 6-inch ductile iron force main, 4–6 feet deep, with expansion joints and 45-degree bends for Columbia, SC wastewater system.

Documents

This scope was carved out of BID031-25-26-WRO.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CDBE SS7655 Shady Lane FM Extension

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySouth Carolina → City Of Columbia
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of 6-inch Restrained Joint Ductile Iron (DI) force main piping at depths of 4–6 feet, including expansion joints and 45-degree bends.

More opportunities from South Carolina → City Of Columbia

Same awarding agency

NAICS: 237110
New
SLED
SS7539-03 Major Pipe Rehabilitation Geopolymer
Solicitation # BID009-26-27-TUE-CDBE
The City of Columbia is soliciting bids for the SS7539-03 Major Pipe Rehabilitation Geopolymer project, which involves the rehabilitation of approximately 3,765 linear feet of gravity sanitary sewer pipe and 14 manholes. The scope of work includes mobilization, traffic control, multi-sensor inspection (MSI) using sonar, LiDAR, and CCTV, and the application of spray-applied geopolymer lining for 48-inch and 54-inch sewers. The project also includes options for cured-in-place pipe and cementitious manhole lining. Acceptance of the work is based on achieving specific minimum liner thickness and material properties, with a strict threshold where any value less than 90 percent of the specified minimum is considered unacceptable. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must provide a bid bond, and the awardee will be required to provide performance and payment bonds. Required submittals include a technical response detailing experience and qualifications, three references from the past five years, a CDBE Goal Affidavit, and financial statements for the last three audit periods. All subcontractors must possess a Sam.gov Unique Entity Identifier (UEID) and an active City of Columbia vendor number. The contract includes standard provisions for termination for cause, convenience, and unavailability of funds, and requires adherence to 2 CFR 200.321 regarding the utilization of small and minority-owned businesses.
Water and Sewer Line and Related Structures Construction

POSTED

5 days ago

DEADLINE

in 28 days
View Details
NAICS: 541370
New
SLED
811 Utility Locate Services
Solicitation # RFP004-26-27-KDD
The City of Columbia is soliciting proposals for 811 Utility Locate Services to manage its utility locating program, which encompasses approximately 2,500 miles of water mains and 1,000 miles of sewer lines. The selected contractor will handle an average of 85,000 to 105,000 annual locate requests from SC811, with an expectation of completing roughly 25 percent of these tickets. Key performance requirements include responding to emergency and no-show requests generally within three hours and providing a positive response to SC811 within 72 hours. The contractor must also maintain detailed photo documentation of all markings indexed by ticket number and location. The initial contract term is six months, running through June 30, 2026, with options for one-year extensions. Proposals must be submitted via IonWave by December 4, 2026, and must not exceed 15 pages, excluding cover pages, resumes, and appendices. The evaluation process is based on a combined score from a technical response and interviews with key personnel. Award will be granted to the highest-ranked, responsive, and responsible contractor. Pricing is based on daily rates for a staff of 3 to 5 people, emergency rates for business and after-hours requests, and ticket scrubbing, with mileage reimbursed at GSA rates. Invoices must be submitted monthly and include a valid purchase order number.
Surveying and Mapping (except Geophysical) Services

POSTED

6 days ago

DEADLINE

in 17 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS