This Government Contract opportunity from Oregon was posted on September 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Ductile Iron Water Main Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This subcontract for the City of Beaverton Public Works involves the installation of potable water mains. The scope of work includes trenching and installing 1,020 linear feet of 12-inch and 40 linear feet of 8-inch ductile iron pipe. Additional requirements include the completion of two system connections, one fire hydrant assembly, and two water services to deliver a fully operable pipe and valve system. All work must adhere to the 2024 Oregon Standard Specifications and AWWA standards, utilizing specific restraint systems, straddle blocking, and polyethylene encasement. The project is categorized under NAICS code 237110, with a response deadline set for October 21, 2026.
General Info
Place of Performance
OR, USASet-Aside
Documents
This scope was carved out of 27-009.
The full solicitation package (10 documents), including the RFP, is on the prime solicitation, not on this scope.
Erickson Ave Waterline Replacement (2nd St to 5th St)
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
