Dumbarton Bicycle Access Improvements Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Dumbarton Bicycle Access Improvements Project is a regional transportation initiative led by the Metropolitan Transportation Commission (MTC) to enhance bicycle and pedestrian connectivity along the SR-84/Dumbarton Bridge corridor in Redwood City, Menlo Park, and Newark, California. Work will focus on existing roadway rights-of-way, installing Class II and Class III bike lanes, buffered bike lanes, green thermoplastic striping, bike boxes equipped with detection loops, and upgraded wayfinding signage—all without expanding roadways or removing trees. The project targets gaps in the regional bicycle network and aligns with MTC’s Dumbarton Forward initiative, ensuring improvements remain within minimal excavation limits of 2.5 feet for signage and two inches for striping. Environmental compliance is established through categorical exemptions under the California Environmental Quality Act (CEQA), including Sections 15301, 15302, 15304, and the Common Sense exemption, confirming no significant impacts on protected species, habitats, historic resources, or flood zones. The project is currently in the pre-construction phase with final design expected to begin in November 2025, though no definitive construction start or completion dates are provided. Performance occurs across multiple locations in San Mateo and Alameda Counties, with inspection and acceptance conducted directly at the project sites, and no centralized delivery or off-site acceptance point. The MTC serves as the lead agency with Cathy Chea listed as the primary point of contact, though no formal Contracting Officer’s Representative, Procurement Contracting Officer, or other administrative personnel are named. There are no specified contract value, pricing details, payment terms, invoicing methods, or federal acquisition regulation clauses present; the document reflects an environmental notice rather than a formal procurement contract. The absence of socioeconomic certifications, offeror representations, evaluation factors, or delivery terms suggests this is an early-stage planning or environmental clearance document, and no formal solicitation, award process, or contractual obligations are yet established.
General Info
Agency
NAICS
Place of Performance
Multiple, CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
