EA 01-0J93U_SR 29 PM 15.26-18.43 Twin Lakes CAPM & Left Turn Channelization (Streambed Alteration Agreement EPIMS Notification No. LAK-57517-R2)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has authorized a streambed alteration agreement for culvert replacement and associated roadway maintenance work along State Route 29 in Lake County between post miles 15.26 and 18.43, under EPIMS Notification No. LAK-57517-R2. The project includes upsizing an 18-inch by 70-foot corrugated steel pipe to a 24-inch by 70-foot pipe at PM 15.26 with installation of a steel flared end section and rock slope protection at the outlet, in-kind replacement of a 24-inch by 88-foot corrugated steel pipe at PM 16.44, and in-kind replacement of a 24-inch steel flared end section at PM 18.43. Vegetation management will be conducted using hand tools or heavy equipment, with strict limitations to ensure heavy machinery remains confined to the roadway prism and does not enter stream channels or riparian zones. Temporary dewatering or clear water diversions may be implemented as needed to facilitate in-channel construction where water is present. The work falls under a categorical exemption under California Code of Regulations Title 14, Section 15301, as it involves repair and replacement of existing facilities consistent with current design and functional standards. Authorization is issued under Section 1602 of the Fish and Game Code, ensuring compliance with environmental protections for aquatic resources. Performers of the work, represented by the California Department of Transportation, must adhere to all conditions outlined in the agreement and conduct activities to maintain environmental integrity. The project is administered by the California Department of Fish and Wildlife, Region 2 – Northern Central, with oversight provided by Senior Environmental Scientist Mary Xiong and project coordination handled by Caltrans representative Isral Konopa. The agreement was executed via DocuSign on October 6, 2025, and the notice was posted on November 13, 2025. No formal contract value, pricing structure, or federal acquisition regulation clauses are specified, as this is a state-level environmental authorization rather than a federally procured contract. There are no stated deadlines for performance, no FOB or payment terms, no formal contract type designations, and no solicitation-based evaluation factors or offeror certifications included in the documentation. Inspections and acceptance occur at the three project locations, with the California Department of Fish and Wildlife serving as the approving authority. Packaging,

General Info

Culvert replacement and roadway maintenance on SR-29 with environmental protections under CDFW authorization.

Agency

California → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

LAK-57517-R2 Notice of Exemption for Twin Lakes CAPM & Left Turn Channelization

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova
Office AddressN/A
Contacts
Mary XiongSenior Environmental Scientist, Specialist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number LAK-57517-R2, pursuant to Section 1602 of the Fish and Game Code to the project Applicant, the California Department of Transportation. The project is limited to culvert work at three locations. The project is part of a larger capital maintenance project that involves rehabilitation of roadway pavement, drainage systems, and other associated work. At PM 15.26, the existing 18-inch by 70-foot corrugated steel pipe (CSP) will be replaced and upsized with a 24-inch by 70-foot CSP, and a 24-inch steel flared end section (FES) and rock slope protection will be installed at the outlet. At PM 16.44, the existing 24-inch by 88-foot CSP will be replaced in-kind. At PM 18.43, the existing 24-inch steel FES at the inlet will be replaced in-kind. Trimming and removal of riparian vegetation will be performed at each proposed site as necessary, using hand tools or heavy equipment. Heavy equipment will remain on the roadway prism and not be driven down within the stream and riparian habitat to perform vegetation removal work. Dewatering and temporary clear water diversions may be required prior to any in-channel work if flowing or standing water is present.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
International
Town of Hinton - Request for Proposal - Town of Hinton - Tamarack Drive Rehabilitation (2026)
Solicitation # AB-2026-05583
The Town of Hinton is soliciting proposals for the comprehensive rehabilitation of Tamarack Drive scheduled for 2026, under solicitation number AB-2026-05583. The project encompasses a full range of infrastructure improvements including grading, installation of granular base course, curb and gutter construction, and application of asphalt concrete pavement to restore the roadway to modern standards. Additional scope elements include the installation of traffic cameras for enhanced monitoring and safety, as well as new pedestrian crossings to improve accessibility and compliance with current transportation guidelines. All work is to be performed within the municipal boundaries of Hinton, Alberta, with the expectation that contractors will adhere to local regulations and engineering specifications. Proposals must be submitted by September 1, 2026, at 8:00 PM Mountain Time, following the release of the request for proposal on August 7, 2026. The primary point of contact for inquiries is Michael Steffler, Project Manager, who can be reached via email at michael.steffler@wsp.com or by phone at 780-728-7398. The procurement is managed directly by the Town of Hinton with no set-aside provisions specified, and all interested parties are directed to the official Alberta purchasing portal for detailed documentation and submission requirements. The project reflects a strategic investment in community infrastructure aimed at improving transportation efficiency, public safety, and long-term durability of the road network.
Town of Hinton

POSTED

about 19 hours ago

DEADLINE

in 24 days
View Details