Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on September 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Eagle Mountain Spillway Guardrail Height Adjustment

Closed
26-185State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Opportunity to quote asphalt repairs_Laura Street Sewer Improvements Project
Solicitation # opportunity-quote-asphalt-repairslaura-street-sewer-improvements-project
D.R. Phillips, LLC is soliciting quotes for asphalt repairs and paving services associated with the Laura Street Sewer Improvements project in Robbinsville, North Carolina. The scope of work includes asphalt pavement replacement, milling, removal, surface and binder course placement, pavement patching, trench restoration, hauling, compaction, and the application of tack coat. This solicitation is intended for bidding purposes to obtain competitive subcontractor pricing for the prime contractor's project bid. Any subsequent award is contingent upon D.R. Phillips, LLC securing the prime contract and the successful negotiation of a separate subcontract agreement. The opportunity is set aside for SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), HUBZone Small Business (HUBZone SB), and SAM.gov designated Small Disadvantaged businesses. Interested contractors must submit proposals by November 27, 2026, including company contact information, certification status, itemized pricing, equipment and workforce availability, and relevant experience with municipal sewer and roadway restoration. A quick payment agreement will be included, and project plans and specifications are available upon request.
D.R. Phillips, LLC

POSTED

about 4 hours ago

DEADLINE

in 5 days
NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering site preparation, construction, and finishing services. Key activities include land surveying, site photography, subsurface investigation, tunneling, boring, jacking, micro tunneling, and the installation of utilities and cathodic protection. Additionally, the project requires asphalt paving, concrete drilling, saw cutting, welding services, landscaping, and the provision of materials such as ready mix and precast concrete. Environmental and safety requirements include storm water pollution prevention (SWPPP) and traffic control. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. Bidders must also demonstrate an ability to foster and maintain labor harmony on the project. Interested firms should contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 24 days
NAICS: 237310
New
International
Buckinghamshire Highways Works Open Framework
Solicitation # BC/0002075
The Buckinghamshire Highways Works Open Framework, solicitation BC/0002075, is a procurement by Buckinghamshire Council to establish an Open Framework Scheme for highway-related construction, capital-funded maintenance, and improvement schemes. The framework is designed to enhance the operation and serviceability of highway assets and is divided into seven discrete lots, with the intention of appointing a maximum of four suppliers per lot. The total estimated value of the contract ranges from £126,030,000 excluding VAT to £151,236,000 including VAT, with a maximum total duration of eight years from the commencement of the initial framework agreement, estimated to end by April 1, 2035. The procurement process is conducted in two stages, beginning with a Pre-Qualification Stage (PSQ) that evaluates financial standing, health and safety policies, and data protection. Bidders must meet specific insurance requirements, including £20m for both Employer’s and Public Liability Insurance and £5m for Professional Indemnity Insurance. Award decisions are based on the most advantageous tender, weighted 60% on price and 40% on quality. Quality assessments focus on technical capability, service delivery, the NEC4 delivery model, innovation, social value, and sustainability. Performance will be monitored through five core Key Performance Indicators (KPIs) and additional call-off KPIs. There is no set-aside status for this solicitation.
Buckinghamshire Council

POSTED

about 12 hours ago

DEADLINE

N/A
NAICS: 237310
New
SLED
Curtiss Park Trail State Project No. 128-158
Solicitation # E26-01
The Town of Simsbury is soliciting bids for the Curtiss Park Trail project (State Project No. 128-158), which involves the construction of approximately 3,000 linear feet of bituminous concrete multi-use trail along the north side of Tariffville Road, extending over the Farmington River bridge to Curtiss and Pattison Parks. The scope includes the installation of a boardwalk section within the Farmington River riparian corridor and wetlands. This project is funded via the Transportation Alternatives Program and administered by the Connecticut Department of Transportation. Key technical requirements include adherence to CTDOT Standard Specifications, the use of reinforced Portland concrete for bin walls with a minimum compressive strength of 3,000 psi, and the implementation of soil erosion and sediment control measures. Revised bid quantities include 1,172 cubic yards of earth excavation and 1,710 tons of controlled materials disposal. The contract will be awarded to the lowest responsive and responsible bidder who is properly licensed, adequately staffed, and experienced. Bidders must provide a CTDOT Contractor Prequalification Certificate, bid security, a non-collusion affidavit, and a hold harmless and indemnification agreement. All contractors and subcontractors must comply with prevailing wage requirements and federal, state, and municipal laws. The DBE participation goal for this contract is zero percent. Bids must be submitted physically to the Director of Finance in Simsbury, CT, by November 24, 2026, at 2:00 PM; no fax or email submissions are permitted. There is no specified set-aside status for this solicitation.
DAS Procurement

POSTED

about 15 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The Tarrant Regional Water District (TRWD) issued Request for Proposal 26-185 for the Eagle Mountain Spillway Guardrail Height Adjustment project. The scope of work involves the maintenance and restoration of approximately 6,200 linear feet of existing metal beam guard fence located along both sides of the roadway across the top of the dam. The primary objective is to adjust the guardrail to a uniform nominal rail height of 28 inches above the finished roadway or shoulder surface. All work must adhere to current Texas Department of Transportation specifications and standards. The project requires a pre-construction inspection to document existing heights and identify components needing replacement, with the contractor responsible for removing all construction waste and debris upon completion. Proposals must be submitted electronically via the OpenGov portal by October 20, 2026, following a mandatory pre-proposal meeting on October 8, 2026. The contract will be awarded based on best value, with the project timeline accounting for 10 percent of the evaluation. Required submission documents include a proposed project schedule, three professional references, and various certifications, including a Non-Collusion Affidavit and Form 1295. For proposals exceeding 50,000 dollars, a bid bond of at least two percent is required. While the project does not fall under the federal Davis Bacon Act, contractors must comply with Texas Government Code 2258.022 and state wage rulings. Pricing is requested as a lump sum for general labor and equipment, supplemented by unit prices for specific replacement materials and traffic control.

General Info

TRWD seeks proposals to adjust 6,200 feet of Eagle Mountain Spillway guardrail height.

Documents

3
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstrfp
High
PDF, Low priorityother
Low

Read all 3 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 5 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 9 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Operations- Reservoir
Contacts2 people available
OfficeFort Worth, TX, 76102, USA

Interested Companies (16)

AmtekTomball, TX
Circle J FabricationWhite Settlement, TX
ConstructconnectCincinnati, OH

See All 16 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The Tarrant Regional Water District (TRWD) has provided quality water to its customers, implemented vital flood control measures and created recreational opportunities for Tarrant County residents and communities for more than one hundred (100) years. TRWD is led by a publicly elected five (5) member board and owns and operates four (4) major reservoirs including Lake Bridgeport, Eagle Mountain Lake, Cedar Creek Reservoir and Richland Chambers Reservoir. TRWD has constructed over two hundred and fifty (250) miles of water pipelines, multiple pump stations and a two-thousand-acre wetland water reuse project augmenting water supplies for the area. TRWD also maintains twenty-seven (27) miles of floodway levees and more than one hundred (100) miles of Trinity River Trails. TRWD's transmission pipelines, ranging in diameters of 72 inch through 108 inch, convey water from its water supply sources Richland-Chambers Reservoir, Cedar Creek Reservoir and Lake Benbrook, through several lake and booster pump stations including balancing reservoirs along the way. The raw water is delivered directly to customer water treatment plants supplied by TRWD's pipelines, as well as to terminal storage reservoirs (Eagle Mountain, Lake Benbrook, and Lake Arlington) through pressure reducing outlets.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS