This Solicitation opportunity from Texas was posted on September 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Eagle Mountain Spillway Guardrail Height Adjustment
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Tarrant Regional Water District (TRWD) issued Request for Proposal 26-185 for the Eagle Mountain Spillway Guardrail Height Adjustment project. The scope of work involves the maintenance and restoration of approximately 6,200 linear feet of existing metal beam guard fence located along both sides of the roadway across the top of the dam. The primary objective is to adjust the guardrail to a uniform nominal rail height of 28 inches above the finished roadway or shoulder surface. All work must adhere to current Texas Department of Transportation specifications and standards. The project requires a pre-construction inspection to document existing heights and identify components needing replacement, with the contractor responsible for removing all construction waste and debris upon completion. Proposals must be submitted electronically via the OpenGov portal by October 20, 2026, following a mandatory pre-proposal meeting on October 8, 2026. The contract will be awarded based on best value, with the project timeline accounting for 10 percent of the evaluation. Required submission documents include a proposed project schedule, three professional references, and various certifications, including a Non-Collusion Affidavit and Form 1295. For proposals exceeding 50,000 dollars, a bid bond of at least two percent is required. While the project does not fall under the federal Davis Bacon Act, contractors must comply with Texas Government Code 2258.022 and state wage rulings. Pricing is requested as a lump sum for general labor and equipment, supplemented by unit prices for specific replacement materials and traffic control.
General Info
Place of Performance
Set-Aside
Documents
3AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 5 days
- Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 9 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Interested Companies (16)
See All 16 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
