Eagle Rock High School Relocatable Buildings Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project at Eagle Rock High School involves the demolition of eight existing bungalow buildings with 16 classrooms, along with associated stairs, ramps, sitework, and utilities, and the installation of six new relocatable classroom buildings on permanent foundations. The scope includes upgrading the campus-wide fire alarm system, installing two new fire hydrants, and performing related sitework, landscaping, and utility improvements. All work must comply with local, state, and federal regulations including the Americans with Disabilities Act, the Division of the State Architect, the California Environmental Quality Act, and the Department of Toxic Substances Control. The project is designed to meet LAUSD’s Standard Conditions of Approval adopted on December 12, 2023, and incorporates environmental protection measures such as soil testing prior to demolition, immediate work stoppage upon discovery of subsurface cultural or hazardous materials, and mandatory recycling of construction waste to the maximum extent feasible. Tree removal is restricted, requiring prior written approval and a nesting bird survey if conducted between February 1 and August 31. The project has a budget of $4,556,538, approved by the LAUSD Board of Education on September 20, 2016, and is being executed under a CEQA categorical exemption utilizing sections 15301, 15302, 15304, 15311, and 15314, indicating no significant environmental impact. Performance will occur at the Eagle Rock High School campus located at 1750 Yosemite Drive in Los Angeles, with inspection and acceptance responsibilities held by LAUSD’s Office of Environmental Health and Safety. The Environmental Planning Specialist, Zulema Renteria, serves as the primary point of contact for compliance and project matters. Proposals are due by June 29, 2026, and must adhere to LAUSD-specific design guidelines and environmental protocols rather than federal contract clauses. No formal evaluation factors, contract type, or line-item pricing details are specified beyond the overall budget, and all requirements are tied to regulatory compliance, waste management, and site-specific environmental protections rather than traditional procurement terms.
General Info
Agency
NAICS
Place of Performance
Los Angeles, CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
