Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Eagle Rock High School Relocatable Buildings Replacement

Forecast
EagleRockHS_RelocatableBuildingsReplacement_NOE_20260529State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project at Eagle Rock High School involves the demolition of eight existing bungalow buildings with 16 classrooms, along with associated stairs, ramps, sitework, and utilities, and the installation of six new relocatable classroom buildings on permanent foundations. The scope includes upgrading the campus-wide fire alarm system, installing two new fire hydrants, and performing related sitework, landscaping, and utility improvements. All work must comply with local, state, and federal regulations including the Americans with Disabilities Act, the Division of the State Architect, the California Environmental Quality Act, and the Department of Toxic Substances Control. The project is designed to meet LAUSD’s Standard Conditions of Approval adopted on December 12, 2023, and incorporates environmental protection measures such as soil testing prior to demolition, immediate work stoppage upon discovery of subsurface cultural or hazardous materials, and mandatory recycling of construction waste to the maximum extent feasible. Tree removal is restricted, requiring prior written approval and a nesting bird survey if conducted between February 1 and August 31. The project has a budget of $4,556,538, approved by the LAUSD Board of Education on September 20, 2016, and is being executed under a CEQA categorical exemption utilizing sections 15301, 15302, 15304, 15311, and 15314, indicating no significant environmental impact. Performance will occur at the Eagle Rock High School campus located at 1750 Yosemite Drive in Los Angeles, with inspection and acceptance responsibilities held by LAUSD’s Office of Environmental Health and Safety. The Environmental Planning Specialist, Zulema Renteria, serves as the primary point of contact for compliance and project matters. Proposals are due by June 29, 2026, and must adhere to LAUSD-specific design guidelines and environmental protocols rather than federal contract clauses. No formal evaluation factors, contract type, or line-item pricing details are specified beyond the overall budget, and all requirements are tied to regulatory compliance, waste management, and site-specific environmental protections rather than traditional procurement terms.

General Info

Demolish eight bungalow buildings, replace with six modern relocatable classrooms, upgrade utilities, landscaping, fire system, and hydrants for $4.56M.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles Unified School District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Zulema RenteriaEnvironmental Planning Specialist

Full Description

Show more
The proposed project (Project) consists of demolishing eight (8) existing bungalow buildings containing 16 classrooms and associated stairs, ramps, sitework, and utilities, and installing six (6) new relocatable classroom buildings containing 12 classrooms on permanent foundations. The Project also includes related utilities, sitework, landscaping, and upgrading the fire alarm system throughout the Campus, including the addition of two (2) new fire hydrants on site. The Board of Education approved the Project's budget of $4,556,538 on September 20, 2016. Minor work will include improvements to ensure compliance with local, state, and federal requirements including those of the American with Disabilities Act (ADA), Division of State Architect (DSA), California Environmental Quality (CEQA), and Department of Toxic Substances Control (DTSC). The Project will be implemented pursuant to all applicable State, federal, and local regulations and all applicable Los Angeles Unified School District (LA Unified or District) specifications, standards, and/or guidelines, including those in compliance with the California Environmental Quality Act (CEQA) and the updated Standard Conditions of Approval for District Construction, Upgrade, and Improvements Projects (SC) as adopted by the Board of Education on December 12, 2023. LAUSD's SCs, design guidelines, and best management practices are designed to be incorporated into the Project design in order to avoid or limit potential adverse impacts associated with the District's projects. The beneficiaries of this Project are the students, faculty, staff, families, school supporters, and the community at large who may request access to the facilities and grounds of the Campus pursuant to the Civic Center act (CA Ed. Code Sections 38130-38139).

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 7 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes such as epoxy mortar flooring, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additionally, the project requires the replacement of electrical distribution, LED lighting, low-voltage systems, and building automation controls, alongside site improvements including paving removal and replacement, drainage upgrades, and hazardous materials abatement. The estimated contract value is between 10 million and 25 million dollars, with a performance period of 730 days after award. The procurement is managed by NAVFAC Mid-Atlantic and will be awarded based on the lowest price for two primary exhibit line items: building renovation and paving work. Proposals are due by November 23, 2026. Bonding requirements are tiered, with proposals exceeding 150 thousand dollars requiring bid, payment, and performance bonds. The project is subject to the Davis-Bacon Act and requires compliance with ADA accessibility guidelines and Buy American requirements. Quality assurance is managed through a multi-phase inspection process, including punch-out, pre-final, and final acceptance inspections, with final real property acceptance documented via DD Form 1354. Invoicing must be submitted through Wide Area Work Flow using NAVFAC Form 4330/54.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and an underground stormwater retention system. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work covers a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in 18 days
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a subcontracting opportunity for the Grafton Job Corps Center in North Grafton, Massachusetts, to perform comprehensive water damage restoration in Building 17. The project follows a fire sprinkler discharge that affected the first, second, and third floors, including dormitory rooms, offices, conference rooms, and hallways. The scope of work requires the contractor to restore these areas to their original condition through drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. All work must comply with NFPA-101 Life Safety Code, ADA, OSHA, EPA regulations, and applicable Massachusetts building codes. The contract is a single lump sum award based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Bidders must attend a mandatory pre-bid walk-through and provide a detailed cost breakdown, a 90-day bid guarantee, and proof of a valid Massachusetts Contractor's License. The project is subject to the Davis-Bacon Act, requiring adherence to specific wage determinations and paid sick leave mandates. Payment terms are Net 30, and the contractor must name Adams and Associates, Inc. as an additional insured on their insurance policies.
Grafton Job Corps

POSTED

about 6 hours ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring spaces damaged by water intrusion to return them to safe residential use. The scope of work includes repairs to sixteen residential rooms and bathrooms, as well as mechanical and utility rooms and common areas. Specific tasks involve drywall installation, joint finishing, and painting, along with the temporary removal and re-installation of HVAC equipment. The project is set as a small business set-aside and is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposing contractors must provide a detailed proposal including relevant experience, a safe work method statement addressing project phasing and occupied-building protection, and itemized pricing by room and trade. Financial requirements include providing payment and performance bonding for the full project value within ten days of award, as well as maintaining general liability insurance with minimum coverage of one million dollars per occurrence and three million dollars general aggregate. Deliverables include a project schedule, personnel resumes, and a minimum one-year workmanship warranty upon final acceptance. The contractor is responsible for all debris removal and the testing of restored mechanical, plumbing, electrical, and life-safety systems to obtain necessary inspection approvals before final acceptance by CSD.
Career Systems Development Corporation

POSTED

about 6 hours ago

DEADLINE

in 8 days
View Details

More opportunities from California → Los Angeles Unified School District

Same awarding agency

NAICS: 423450
New
SLED
Automated External Defibrillators
Solicitation # 2381068792
The Los Angeles Unified School District is soliciting bids for a comprehensive Automated External Defibrillator (AED) program, including the provision of equipment, real-time monitoring, maintenance, compliance management, and post-event services. The resulting unit rate requirements contract will cover an initial 36-month period. Key technical specifications require a minimum four-year battery and electrode life. The District evaluates bidders primarily on the lowest unit cost on an FOB Destination basis, though bidders may be ruled non-responsible based on poor past performance. The District also reserves the right to inspect bidder facilities and may require a testing period for any newly proposed brands. Deliveries must be made to various District locations within 30 calendar days of a purchase order, with specific delivery windows between 8:00 a.m. and 3:30 p.m. All shipments must be properly packaged to prevent damage and include detailed packing slips. Payment is processed via Electronic Funds Transfer (EFT), and invoices must be submitted in PDF format. The contract emphasizes social responsibility, with a 25 percent participation goal for Small Business Enterprises and a 5 percent goal for Veteran and Disabled Veteran Business Enterprises. Bidders must provide proof of insurance, material safety data sheets, and disclosure of manufacturing plant locations to comply with the District's Sweat-Free Procurement Policy.
Medical, Dental, and Hospital Equipment and Supplies Merchant Wholesalers

POSTED

5 days ago

DEADLINE

in 24 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS