Early Education Expansion at Caliber Changemakers Academy

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Vallejo is advancing the modernization of the Caliber Changemakers Academy campus to support increased enrollment in its early education program through the installation of four new one-story modular buildings totaling 8,640 square feet. These structures will directly expand classroom capacity and educational infrastructure to meet growing demand. Complementing the new buildings, the project includes significant on-site enhancements such as an expanded parking lot and student pick-up/drop-off area, upgraded playfields and hardcourts, new play structures, associated site work and underground utility improvements, and approximately 6,173 square feet of new landscaping to enhance the overall campus environment and functionality. The work is planned to be completed at the existing campus location in Vallejo, California, with a posted forecast date of August 4, 2026. Key personnel overseeing the project include Cesar Orozco as Planning Manager, Brittany Sicat as Project Manager, and Markus Mullarkey as President of Caliber Schools, with coordination through the City of Vallejo’s administrative channels.

General Info

Vallejo to add four modular classrooms and upgrade campus facilities by August 2026 to support early education growth.

Agency

California → City of Vallejo

Place of Performance

Valle Vista Avenue and Napa Street, Vallejo, CA, 945490

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Vallejo
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Vallejo
Office AddressN/A
Contacts
Cesar OrozcoPlanning Manager
Brittany SicatProject Manager
Markus MullarkeyPresident

Full Description

Show more
The project consists of the modernization of the existing Caliber Changemakers Academy campus to accommodate increased enrollment in its early education program. The project includes the installation of four new one-story modular buildings totaling 8,640 square feet to support the expanded early education program. In addition, the project includes on-site improvements, including the expansion of the existing parking lot and student pick-up/drop-off area, improvements to the existing playfields and hardcourts, installation of new play structures, associated site work and underground utilities, and approximately 6,173 square feet of new landscaping.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a Total Small Business Set-Aside for the interior modernization of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. This firm-fixed-price construction project involves comprehensive renovations including the replacement of corridor and classroom flooring with LVP and carpet tiles, full restroom remodeling of vanities and lavatories, and the installation of raised flooring with integrated electrical distribution for classrooms. Additional technical requirements include upgrading lighting controls, replacing ceiling fans, updating doors and life-safety components, and replacing variable air volume systems. The contractor is also responsible for moving and protecting loose furniture and providing new ADA-compliant signage for all spaces. The period of performance is scheduled from January 11, 2027, to March 11, 2028, totaling 425 calendar days after the Notice to Proceed. Proposals are due by November 18, 2026, and will be evaluated based on price, past performance, and corporate relevant experience. Awardees must provide payment and performance bonds, and bidders are required to furnish a bid guarantee of 20 percent of the bid price or 3 million dollars. Due to the nature of the facility, personnel must undergo background checks and adhere to strict security and safety protocols, including the DHS Non-Disclosure Agreement and FBI fingerprinting. All work must comply with applicable Davis-Bacon wage determinations and Buy American requirements.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 11 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Technical upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the project requires hazardous materials abatement and site improvements, including paving, drainage upgrades, and repairs to water, sanitary, and storm systems. The project has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Proposals are due by November 23, 2026, and will be awarded based on the lowest price. Bidders must provide pricing for two specific exhibit line items: building renovation and paving removal and replacement. Bonding requirements vary by proposal value, with those 150 thousand dollars and greater requiring bid, payment, and performance bonds. The contract is subject to the Davis-Bacon Act, Buy American requirements, and ADA accessibility guidelines. Invoicing must be submitted monthly via Wide Area Work Flow using NAVFAC Form 7300/30.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 16 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and an underground stormwater retention system. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bids are required across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in 22 days
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile repair, and rubber wall base installation, as well as flooring replacement, vanity and cabinet restoration, and necessary electrical and plumbing work to return the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside solicitation open to Small Businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, with evaluation weights assigned to price (60%), quality (20%), past performance (10%), and schedule (10%). Prospective bidders must attend a mandatory pre-bid site walk-through and submit a proposal by November 17, 2026, including a detailed cost breakdown, a 90-day bid guarantee, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act, requiring compliance with specific minimum wage rates and paid sick leave mandates. All work must adhere to OSHA, EPA, ADA, and NFPA-101 Life Safety Code standards, with payment terms set at Net 30.
Grafton Job Corps

POSTED

about 6 hours ago

DEADLINE

in 9 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to return them to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as common areas and mechanical rooms. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in utility rooms and hallways, along with the temporary disconnection and re-installation of HVAC equipment, water heaters, and furnaces. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100. Proposing contractors must provide itemized pricing by room and trade, a detailed description of their proposed work methods for an occupied building, and evidence of relevant experience. Award requirements include the provision of payment and performance bonding for the full project value, as well as general liability insurance with minimum coverage of 1 million dollars per occurrence and 3 million dollars general aggregate, all within ten days of award. Final acceptance by CSD is contingent upon successful system testing, debris removal, and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 6 hours ago

DEADLINE

in 12 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement