Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on June 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Earned Value Management (EVM) Implementation and Reporting

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541611
New
SLED
Pinellas County SBE Consultants per the Consultant Competitive Negotiations Act (CCNA)
Solicitation # 26-0853-RFQ-CCNA
Pinellas County's Office of Management and Budget is seeking to establish a pool of certified Small Business Enterprise (SBE) consultants under the Consultant Competitive Negotiations Act (CCNA). This ongoing solicitation aims to increase the utilization of SBEs for professional services including engineering, architectural, landscape architecture, planning, coastal management, construction management, and survey and mapping. The program specifically targets work assignments that do not exceed the 150,000 dollar local market threshold. To be eligible, firms must be located in Pinellas, Hillsborough, Pasco, or Manatee counties, employ no more than 50 full-time staff, and meet annual gross revenue limits of 3 million dollars for selective goods and services or 8 million dollars for construction providers. Applicants are evaluated based on the ability of professional personnel, experience and past performance, and SBE status, requiring a minimum score of 75 points to be accepted onto the shortlist. Required submission documents include an introduction letter, a completed SF-330, a Pinellas County SBE certificate, professional Florida licenses, and a signed insurance statement. All engineering and survey deliverables must adhere to the latest Pinellas County CADD Standards Manual and Kit. Insurance requirements include 1 million dollars for professional liability and commercial general liability per occurrence, with specific mandates for tail coverage and naming Pinellas County as an additional insured.
OMB - PURCHASING

POSTED

1 day ago

DEADLINE

in almost 5 years

AI Contract Overview

Show more

The contract requires the implementation and ongoing maintenance of Earned Value Management systems in strict compliance with ANSI/EIA-748 standards, covering the full lifecycle of project oversight including Work Breakdown Structure development, baseline establishment and control, and comprehensive performance reporting. This subcontract is tied to the prime contract managed by the Department of Defense under the FA8625 Aflcmc Wlnk C130 office, with performance expected to occur in Dayton. The contractor must ensure all EVM processes are rigorously aligned with federal standards to support accurate cost, schedule, and technical performance tracking across the program. The solicitation was posted on June 24, 2026, with a response deadline of July 31, 2026, at 9:00 p.m. EDT, and is classified under NAICS code 541611 for Management, Scientific, and Technical Consulting Services. While no specific set-aside designation is indicated, the work is intended for a subcontractor supporting a defense program and will require demonstrated expertise in EVM system development and operational validation. All deliverables must meet DoD expectations for transparency, traceability, and integration with existing program management frameworks.

General Info

Implement and maintain ANSI/EIA-748 compliant EVM systems for DoD in Dayton under prime contract FA8625 Aflcmc Wlnk C130.

Agency

Department Of Defense → FA8625 Aflcmc Wlnk C130View Agency

NAICS

541611 - Administrative Management and General Management Consulting ServicesView NAICS

Place of Performance

Dayton, OH, USA

Set-Aside

NONE

Documents

This scope was carved out of HFPSIndustryDayQA.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

C-130H Industry Day Q&A

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8625 Aflcmc Wlnk C130
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → FA8625 Aflcmc Wlnk C130
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Implementation and maintenance of EVM systems in compliance with ANSI/EIA-748, including WBS development, baseline management, and performance reporting for the prime contract.

More opportunities from Department Of Defense → FA8625 Aflcmc Wlnk C130

Same awarding agency

NAICS: 334511
Federal
C-130H Formation Positioning System Draft RFP
Solicitation # FPS2026130H
This notice pertains to the C-130H Formation Positioning System (FPS) program, which seeks industry input for Engineering and Manufacturing Development and Production and Deployment support. It is not a formal solicitation and does not obligate the Government to issue a Request for Proposals or award a contract. The information provided is for planning purposes only and may change based on industry feedback. Access to draft documents containing Controlled Unclassified Information (CUI) requires a verified SAM.gov account linked to a valid Unique Entity ID and CAGE code. Interested parties must request access through SAM.gov by providing their CAGE code and a statement of interest, with approval contingent upon verified U.S. vendor status and mission-related need. The System Model document is not available for direct download due to file limitations and must be requested separately via secure email to the designated point of contact, after which it will be delivered through the DoD SAFE platform with secure authentication. Vendors granted access are encouraged to provide technical feedback, questions, or comments via secure email to Aaron Christy, clearly identifying the associated document and section. All correspondence must adhere to CUI handling protocols. The primary point of contact is located at Wright-Patterson Air Force Base in Ohio, under the Department of Defense’s Air Force Life Cycle Management Center. Submissions are not reimbursable, and no contractual obligations are created through this notice. Secondary contact information is also provided for administrative support. The NAICS code 334511 indicates the focus is on navigation, measuring, electromedical, and control instruments manufacturing, aligning with the precision systems required for the FPS. Security and compliance with DoDI 5200.48 govern all document access, transmission, and handling procedures.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 336413
Federal
C-130H Formation Position System Draft RFP
Solicitation # FPS2026130
The contract pertains to the Engineering and Manufacturing Development and Production and Deployment support for the C-130H Formation Positioning System, managed by the Air Force Life Cycle Management Center at Wright-Patterson AFB, Ohio. This is a draft solicitation under solicitation number FPS2026130, intended for market research and industry feedback rather than as a formal request for proposals; no contract award or cost reimbursement is guaranteed from this notice. The scope encompasses full lifecycle support including systems engineering, software development, configuration management, spectrum certification, and quality assurance, with deliverables governed by specific Data Item Descriptions such as the System/Subsystem Design Description, Software Bill of Materials, Test Plans, Acceptance Test Reports, and Failure Summary Reports. All technical outputs must comply with critical military standards including MIL-STD-810H for environmental resilience, MIL-STD-130N for Unique Item Identification and IUID marking in the WAWF registry, MIL-STD-461G for electromagnetic compatibility, and RTCA DO-178C for avionics software development. Security is strictly enforced, requiring Tier 1 clearance and CAC authorization for personnel, adherence to DFARS 252.204-7012 for cyber incident reporting within 72 hours of compromise, and compliance with OPSEC directives under DoDD 5205.02E and AFI 10-701, with Controlled Technical Information restricted to DoD components under Distribution Statement D. Offerors must submit a five-volume proposal electronically via DoD Safe by 3:00 PM Dayton time on DD Mmm 2027, with strict page limits for executive summary, technical, and past performance volumes, and no physical submissions allowed. Evaluation will follow a best-value trade-off approach where Technical Excellence and Past Performance are of equal and primary importance, significantly outweighing Price, with adjectival ratings for technical acceptability ranging from Outstanding (Blue) to Unacceptable (Red), and only offerors achieving Satisfactory past performance confidence will be eligible. All offerors must provide their CAGE code, size status, and Small Business Subcontracting Plan if applicable, and must comply with IUID requirements, preservation standards, and physical security obligations for Government property. Pricing details are absent from the notice and will be provided separately in an unattached Pricing Matrix referenced in Section B.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

4 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS