Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on September 11, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

EARTHQUAKE REPAIR, BUILDING 11551 AND 8681

Closed
FA500020R0057Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, focuses on basin improvements under NAICS code 236220. The solicitation was posted on October 19, 2026, with a response deadline of November 4, 2026. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. To secure project financing, the Inland Empire Utilities Agency requires strict adherence to expanded DBE Good Faith Effort (GFE) guidelines. Bidders must provide proof of utilizing SBA and MBDA services and demonstrate that solicitations were posted in an online publication for 30 consecutive days and in a newspaper for at least one day prior to the bid opening. Failure to include this documentation within the bid package will result in the proposal being deemed non-responsive. While outreach documentation may be submitted up to three business days after the closing date, all other mandatory GFE requirements must be met by the opening date to ensure compliance.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 2 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 2 hours ago

DEADLINE

in 11 days

General Info

Contract Value

$196,000

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

JBER, AK, 99506, USA

Set-Aside

SBA

Award Issued Date

Documents

16

BULK+SAMPLE+ANALYSIS+ASBESTOS+BLDG+11551.pdf

PDF

DAVIS-BACON+WAGE+DETERMINATION+AK20200001.pdf

PDF

DETERMINATION+OF+LIQUIDATED+DAMAGES.pdf

PDF

DRAWINGS-+EARTHQUAKE+REPAIR+BUILDING+11551+AND+8681.pdf

PDF

Environmental+Management+Preconstruction+Checklist.pdf

PDF

FA500020R0057+Earthquake+Repair+Q+and+A.pdf

PDF

JBER+CAD+_+GIS+RECORD+DRAWING+AS-BUILT+STANDARD.pdf

PDF

LEAD+ANALYSIS+PAINT+BLDG+11551.pdf

PDF

OPEN+MARKET+CONSTRUCTION+CONTRACT+GENERAL+SPECIFICATIONS++AND+PROVISIONS.pdf

PDF

SCHEDULE+OF+MATERIAL+SUBMITTALS+AF66.pdf

PDF

Solicitation+Amendment+-+FA500020R00570001.pdf

PDF

Solicitation+Amendment+FA500020R00570001+SF+30.pdf

PDF

Solicitation+Amendment+-+FA500020R00570002.pdf

PDF

Solicitation+Amendment+FA500020R00570002+SF+30.pdf

PDF

STATEMENT+OF+WORK-+EARTHQUAKE+REPAIR+BUILDING+11551+AND+8681.pdf

PDF

TRANSFER+AND+ACCEPTANCE+OF+DoD+REAL+PROPERTY+DD1354.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 4, 2020 to Sep 10, 2020. The notice description changed.

Notice updated

Response deadline changed from Sep 10, 2020 to Sep 18, 2020. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA5000 673 Cons Lgc
Contacts2 people available
OfficeJBER, AK, 99506-2501, USA
Office AddressJBER, AK, 99506-2501, USA

Full Description

Show more
EARTHQUAKE REPAIR, BUILDING 11551 AND 8681, Project # FXSB 20-5247M This requirement is to provide repairs for damages to Building 11551 and 8681 sustained as a result of the earthquake affecting the Anchorage area on 30 November 2018. Repairs are as indicated on the drawing(s) associated with project # FXSB 20-5247M. Damage shown on drawings are assigned a Repair Code and contractor is to refer to Schedule of Repairs on drawing to define repair(s). Work is to be completed on Joint Base Elmendorf-Richardson, Alaska This requirement must meet all specifications outlined in the Statement of Work and corresponding documents and drawings associated with project # FXSB 20-5247M. The contractor shall have 120 days to complete the project from Notice to Proceed. Please see the full solicitation and corresponding documents within the attachments. All questions associated with this solicitation are due no later than Thursday, August 27th 10:00 AM AKST. Any questions received after the date and time indicated may not be reviewed or responded to. An amendment to this solicitation has been posted. The amendment addresses changes in the Statement of Work, Drawings, and AF Form 66 that have been made for this requirement to add additional work and clarification of previous work included within the initial solicitation. Additionally, an option CLIN has been added for asbestos and lead abatement based upon an estimated square footage, only to be exercised if additional hazardous material, outside of what has been identified in the statement of work and corresponding documents, is found during performance of the contract. Lastly, answers submitted in response to questions associated with this solicitation have been included to address questions or concerns presented. A second amendment has been posted to extend the solicition response due date to 10:00 am, Friday, 18 September 2020. Please see attchments for additional information and updated documents.

More opportunities from Department Of Defense → FA5000 673 Cons Lgc

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS