Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Earthwork and Erosion Control

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Earthwork and Erosion Control supports bridge replacement projects for the City of Winter Park under the Public Works and Transportation agency. The scope of work involves comprehensive site preparation, including clearing and grubbing, regular excavation, embankment work, and Type B stabilization. The objective is to deliver a site fully prepared for paving and structure installation. A critical component of the contract is the installation and maintenance of environmental protections, such as sediment barriers, floating turbidity barriers, and inlet protection systems to ensure active erosion control. The solicitation was posted on July 9, 2026, with a response deadline of October 14, 2026, falling under NAICS code 238910.

General Info

Earthwork and erosion control subcontract for City of Winter Park bridge replacement projects.

Documents

This scope was carved out of IFB26-24.

The full solicitation package (21 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

456999-1-54-01 Stirling Avenue Bridge Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Public Works & Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs site clearing, excavation, and installation of environmental protections for prime contractors on City of Winter Park bridge replacement projects. Installs sediment barriers, floating turbidity barriers, and inlet protection systems. Performs clearing and grubbing, regular excavation, embankment, and Type B stabilization. Delivers a prepared site ready for paving and structure installation with active erosion controls.

Similar Contracts

Same NAICS industry code

More opportunities from Florida → Public Works & Transportation

Same awarding agency

NAICS: 237310
SLED
456999-1-54-01 Stirling Avenue Bridge Replacement
Solicitation # IFB26-24
The City of Winter Park, Florida, is soliciting bids under IFB26-24 for the Stirling Avenue Bridge Replacement project, identified as Financial Project ID 456999-1-54-01. The project involves the demolition of an aging timber box culvert and the construction of a single-span cast-in-place concrete flat slab bridge featuring two travel lanes and two ADA-compliant sidewalks. The scope includes roadway reconstruction with two 60-foot vertical curves to increase clearance, the installation of steel piling and sheet piling, and site restoration involving erosion control and sodding. The project is located on Stirling Avenue, extending from approximately 40 to 311 feet east of the Lakeview Drive intersection. The contract requires strict adherence to FDOT FY 2026-27 standards and specifications. Key administrative requirements include a bid surety of 5 percent of the bid amount and performance and payment bonds equal to 100 percent of the annual contract price. Bids must be submitted electronically via the OpenGov portal by October 14, 2026, at 2:00 pm. The City will award the contract to the lowest responsive and responsible bidder, considering quality, delivery terms, and service reputation. The project involves significant coordination with multiple utilities, including the City of Winter Park Water and Wastewater Utilities, TECO Peoples Gas, Charter Spectrum, and Lumen. Environmental and regulatory compliance is mandatory, with authorizations already in place from the U.S. Army Corps of Engineers under Nationwide Permit 14 and the St. Johns River Water Management District. Additionally, the contractor must comply with the Build America, Buy America Act, Davis-Bacon labor standards, and FHWA-1273 federal-aid provisions. Payment terms are 30 days net from the receipt of an invoice.
Highway, Street, and Bridge Construction

POSTED

3 months ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS