Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Georgia was posted on June 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Earthwork and Site Preparation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between $80,000,000 and $100,000,000, with a solicitation expected around March 15, 2027. Construction is scheduled to begin in September 2027 and last approximately two years, spanning two dredging seasons from September 1, 2027, to August 31, 2029. The work is divided into two primary sequences: the construction of a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, including an access channel, and the subsequent maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth. The total scope involves mechanically dredging approximately 5,500,000 cubic yards of material using closed clamshell buckets. Specifically, 3,200,000 cubic yards will be removed to create the CAD cell, with material placed at Port Edgewood Basin, Fox Point Reach CAD cells, Prudence Island, and the Rhode Island Sound Disposal Site. The remaining 2,300,000 cubic yards of maintenance material will be placed within the newly constructed Edgewood Shoals North CAD cell. To meet strict environmental windows and project timelines, the contractor must maintain a production rate of at least 300,000 cubic yards every 30 calendar days, operating 24 hours a day, 7 days a week. Interested firms must submit a capabilities package by November 26, 2026, demonstrating experience with these production rates and open water placement in New England during winter months.
W2SD Endist New England

POSTED

about 3 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves comprehensive earthwork and site preparation activities including the excavation and removal of unsuitable soil, transportation of excess material offsite, and the importation of approved fill material to achieve proper site grading and foundation support. The scope requires thorough compaction of the imported fill to meet specified engineering standards and the installation of geotechnical fabric to enhance soil stability and prevent migration of fine particles. All work must be performed in accordance with applicable geotechnical and construction best practices to ensure long-term structural integrity of the site. The contract is designated as a subcontract under NAICS code 237990 and is issued by the Clayton County Board of Commissioners in Georgia. It was posted on June 24, 2026, with a response deadline of July 30, 2026, at 1:00 PM. The place of performance and specific location details are not provided in the data, and no set-aside provisions or point of contact information are included. Interested parties must submit responses through the official portal linked in the solicitation before the deadline to be considered.

General Info

Earthwork and site prep with fill import, compaction, and geotech fabric per engineering standards for Clayton County, Georgia.

Documents

This scope was carved out of PE-63100-NONST-2026-000000097.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ITB #26-97 Riverdale Library Renovations for Clayton County, Georgia

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Clayton County Board of Commissioners
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Excavation of unsuitable soil, hauling off excess material, importing suitable fill, compacting fill, and installing geotechnical fabric for site grading and foundation support.

More opportunities from Georgia → Clayton County Board of Commissioners

Same awarding agency

NAICS: 541614
New
SLED
RFP #26-149 Freight Cluster Plan for Clayton County, GA
Solicitation # 26-149
The Clayton County Board of Commissioners is soliciting proposals under RFP 26-149 for the development of Freight Cluster Plans for Clayton County, Georgia. The project focuses on a study area extending from Tara Boulevard in the west to Mt. Zion Boulevard in the east, and from State Route 138 in the south to Interstate 75 in the north. Key deliverables include a Project Management Plan, Stakeholder Engagement and Outreach Plan, Inventory and Assessment Report, Traffic Study Report, a fiscally constrained short-term action plan, and a long-term vision project list. The work is supported by the Atlanta Regional Commission (ARC) and is contingent upon funding from the Georgia Department of Transportation. Proposals must be submitted electronically via Bidnet by November 19, 2026. The evaluation process is weighted toward understanding the scope of services (25%), organizational qualifications (30%), and project management and personnel (30%), with financial capability (10%) and cost (5%) making up the remainder. Awardees must comply with E-Verify requirements, Title VI of the Civil Rights Act of 1964, and specific bonding and insurance standards. While the county encourages the use of small local businesses, there is no specific SLBE subcontracting goal for this project. Selected proponents will be required to provide comprehensive progress reports to the ARC and may be asked to participate in oral presentations between December 28 and December 31, 2026.
Process, Physical Distribution, and Logistics Consulting Services

POSTED

6 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS