Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 26, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

East Branch Cutoff Wall Construction Project

Awarded
W911WN-13-R-0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 11 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 11 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 11 hours ago

DEADLINE

in about 19 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 11 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 16 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

The East Branch Cutoff Wall Construction Project, solicitation W911WN-13-R-0002, is a dam safety modification effort managed by the U.S. Army Engineer District, Pittsburgh, located in Elk County, Pennsylvania. The project involves the construction of a concrete cutoff wall approximately 2,155 feet long with a maximum depth of 240 feet to create a seepage barrier. With an estimated construction magnitude between 100 million and 250 million dollars and a performance period of 1,740 calendar days, the scope includes mobilization, site work, dam crest widening, exploratory drilling, and extensive slurry control drilling and grouting. The procurement process involved ten amendments, which refined technical specifications, updated Davis-Bacon wage determinations, and extended the proposal deadline to October 10, 2013. Comprehensive technical requirements are established through a Geotechnical Baseline Report and detailed specifications for quality control, instrumentation monitoring, and erosion and sedimentation control. The project is subject to strict environmental compliance, including Individual NPDES permits for stormwater discharge and approved E&S control plans to manage approximately 18.37 acres of disturbed land.

General Info

Contract Value

$180,855,800.61

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

PA, USA

Set-Aside

NONE

Award Issued Date

Documents

74

Amendment 0008 - Contractor Questions & Responses

PDF, High priority: read this first44 pages · q-and-a
High

Amendment 0009: Contractor Questions and Responses (435-448)

PDF, High priority: read this first2 pages · q-and-a
High

Attachment 8 - Contractor Proposed Quantities

XLSX, High priority: read this first40 pages · specifications
High

Dam Safety E&S Drawings - East Branch Clarion River Lake

PDF, High priority: read this firstspecifications
High

East Branch Dam Dam Safety Modifications - Tech Specs Volume 3D (AMEND 0008)

PDF, High priority: read this firstspecifications
High

East Branch Dam - GBR Appendix F: Discontinuity Data

PDF, High priority: read this firstspecifications
High

East Branch Dam - GBR Appendix I: Instrumentation Data

PDF, High priority: read this firstspecifications
High

East Branch Dam - Geotechnical Baseline Report Appendix D-2

PDF, High priority: read this firstspecifications
High

East Branch Dam - Geotechnical Baseline Report (April 2013)

PDF, High priority: read this firstspecifications
High

East Branch Dam Safety Modification - Bid Schedule

XLSX, High priority: read this first8 pages · specifications
High

East Branch Dam Safety Modification - Bid Schedule

DOCX, High priority: read this first12 pages · specifications
High

East Branch Dam Safety Modification Phase 1 - E&S Report

PDF, High priority: read this firstspecifications
High

East Branch Dam Safety Modifications - Volume 3 Attachments (Amendment 0008)

PDF, High priority: read this firstspecifications
High

East Branch Lake Dam Safety Modifications - GBR Appendix D-1

PDF, High priority: read this firstspecifications
High

East Branch Lake Dam Safety Modifications - GBR Appendix G

PDF, High priority: read this first366 pages · specifications
High

East Branch Lake Dam Safety Modifications - Laboratory Test Data

PDF, High priority: read this firstspecifications
High

East Branch Lake Dam Safety Modifications - Tech Specs Vol 3C (AMEND 0008)

PDF, High priority: read this firstspecifications
High

Fast Branch Dam Safety Modification - E&S Control Report

PDF, High priority: read this firstspecifications
High

Fast Branch Dam Safety Modification - E&S Control Report (AMEND 0008)

PDF, High priority: read this firstspecifications
High

General Decision PA130004 - Pennsylvania Heavy and Highway Construction

PDF, High priority: read this first19 pages · wage-determination
High

PA130004 - Heavy and Highway Construction Wage Determination

PDF, High priority: read this first17 pages · wage-determination
High

Phase I Site Development - E&S Drawings (TRM-Lined Channel Swimming Pool)

PDF, High priority: read this firstspecifications
High

Section 00 31 31.13 08 - Subsurface Investigation Information

PDF, High priority: read this first3 pages · specifications
High

Section 00 31 31.13 08 - Subsurface Investigation Information

PDF, High priority: read this first3 pages · specifications
High

Section 01 45 00.00 10 - Quality Control (Amendment 0009)

PDF, High priority: read this first17 pages · specifications
High

Section 31 09 13.00 08 - Instrumentation and Monitoring (Amendment 0009)

PDF, High priority: read this first26 pages · specifications
High

Section 31 32 23.13 08 - Permanent Foundation Drilling and Grouting (Amendment 0009)

PDF, High priority: read this first43 pages · specifications
High

W911WN-13-R-0002-0008 Amendment 0008

PDF, High priority: read this first113 pages · amendment
High

W911WN-13-R-0002-0008 Contract Drawings Index

PDF, High priority: read this firstspecifications
High

W911WN-13-R-0002 Amendment 0001

PDF, High priority: read this first3 pages · amendment
High

W911WN-13-R-0002 Amendment 0002

PDF, High priority: read this first4 pages · amendment
High

W911WN-13-R-0002 Amendment 0003 - East Branch Cutoff Wall Construction Project

PDF, High priority: read this first2 pages · amendment
High

W911WN-13-R-0002 Amendment 0004 - East Branch Cutoff Wall Construction Project

PDF, High priority: read this first2 pages · amendment
High

W911WN-13-R-0002 Amendment 0005 - East Branch Cutoff Wall Construction Project

PDF, High priority: read this first2 pages · amendment
High

W911WN-13-R-0002 Amendment 0006

PDF, High priority: read this first2 pages · amendment
High

W911WN-13-R-0002 Amendment 0007

PDF, High priority: read this first2 pages · amendment
High

W911WN-13-R-0002 Amendment 0008 - East Branch Cutoff Wall Construction Project

PDF, High priority: read this first3 pages · amendment
High

W911WN-13-R-0002 Amendment 0009

PDF, High priority: read this first3 pages · amendment
High

W911WN-13-R-0002 Amendment 0010 - East Branch Cutoff Wall Construction Project

PDF, High priority: read this first2 pages · amendment
High

W911WN-13-R-0002 Attachment 6: Offeror's Expected Funding Profile

DOCX, High priority: read this first2 pages · specifications
High

W911WN-13-R-0002 East Branch Cutoff Wall Construction - Q&A Amendment 0006

PDF, High priority: read this first14 pages · q-and-a
High

W911WN-13-R-0002 East Branch Dam Cutoff Wall Rehabilitation Project

PDF, High priority: read this first114 pages · ifb
High

W911WN-13-R-0002 East Branch Dam Cutoff Wall Rehabilitation Project

PDF, High priority: read this first113 pages · rfp
High

W911WN-13-R-0002 East Branch Lake Dam Safety Modifications - Technical Specifications

PDF, High priority: read this first726 pages · specifications
High

W911WN-13-R-0002 East Branch Lake Dam Safety Modifications - Volume 1 Technical Specifications

PDF, High priority: read this first702 pages · specifications
High

W911WN-13-R-0002 East Branch Lake Dam Safety Modifications - Volume 1 Technical Specifications

PDF, High priority: read this first702 pages · specifications
High

W911WN-13-R-0002 East Branch Lake Dam Safety Modifications - Volume 3 Attachments

PDF, High priority: read this first254 pages · specifications
High

W911WN-13-R-0002 East Branch Lake - GBR Appendix B

PDF, High priority: read this first27 pages · specifications
High

W911WN-13-R-0002 East Branch Lake GBR Appendix E

PDF, High priority: read this firstspecifications
High

W911WN-13-R-0002 East Branch Lake - GBR Appendix J

PDF, High priority: read this first78 pages · specifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

18 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline added: Jun 21, 2013. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 21, 2013 to Jul 19, 2013. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jul 19, 2013 to Aug 9, 2013. The notice description changed.

Notice updated

Response deadline changed from Aug 9, 2013 to Aug 29, 2013. The notice description changed.

Notice updated

Response deadline changed from Aug 29, 2013 to Sep 25, 2013. The notice description changed.

Notice updated

Response deadline changed from Sep 25, 2013 to Sep 27, 2013. The notice description changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

Notice type changed from Solicitation to Special Notice. The notice title changed. The notice description changed. The point of contact changed.

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Pittsburgh
Contacts2 people available
OfficePITTSBURGH, PA, 15222-4198, USA
Office AddressPITTSBURGH, PA, 15222-4198, USA
Contacts
Carole M. HouseholderContract Specialist
Cynthia J SmithContracting Officer

Full Description

Show more
AMENDMENT 0010 is hereby posted. AMENDMENT 0009 is hereby posted. AMENDMENT 0008 is hereby posted. AMENDMENT 0007 is hereby posted. AMENDMENT 0006 is hereby posted. AMENDMENT 0005 is hereby posted. AMENDMENT 0004 is hereby posted. AMENDMENT 0003 is hereby posted. AMENDMENT 0002 is hereby posted. AMENDMENT 0001 is hereby posted. ~~~~~~~~~~~~~~~ REQUEST FOR PROPOSAL: SF 1442 for the East Branch Cutoff Wall Construction Project is hereby posted. Site Visit was scheduled for 22 May 2013. Proposals due on 10 October 2013 11:00AM.

More opportunities from Department Of Defense → W072 Endist Pittsburgh

Same awarding agency

NAICS: 238160
New
Federal
Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement
Solicitation # W911WN26QA062
The U.S. Army Corps of Engineers, Pittsburgh District, is soliciting quotes for the complete replacement of the standing seam metal roof on the Control Tower Building at Mosquito Creek Lake in Cortland, Ohio. This non-commercial construction project is a 100 percent Small Business Set-Aside under NAICS 238160, with an estimated value between $150,000.00 and $350,000.00. The scope of work includes the demolition and disposal of existing roof panels, box gutters, scuppers, and the lightning protection system, as well as the installation of a new gutter system and a certified, non-penetrating Lightning Protection System. Additional requirements include rerouting vent and exhaust pipes through the masonry side wall and refurbishing up to 95 linear feet of cold-formed metal sub-framing that exhibits significant corrosion or deformation. The project will be awarded as a single Firm-Fixed Price contract based on best value, evaluating both price and past performance. The performance period is 365 calendar days from the written Notice to Proceed, with work hours restricted to Monday through Friday, 7:00 AM to 4:00 PM. Contractors must adhere to strict quality and safety standards, including EM 385-1-1, UL 2218 Class 4 impact resistance, and Davis-Bacon Act wage determinations for Trumbull County, Ohio. Required submissions include a Quality Control Plan and documented credentials for key personnel. Performance and payment bonds totaling 100 percent of the contract price are required upon award.
Roofing Contractors

POSTED

4 days ago

DEADLINE

in 6 days
View Details
NAICS: 237990
New
Federal
JP Murtha Float Mooring Bitts Retrofit
Solicitation # W911WN27BA001
The United States Army Corps of Engineers, Pittsburgh District, is soliciting a Firm-Fixed-Price construction contract for the John P. Murtha Floating Mooring Bitts Retrofit. This project involves complex in-the-wet construction within an active navigation lock, requiring the design, fabrication, and installation of two dewatering boxes and the installation of Government-furnished floating mooring bitts into contractor-fabricated embedded frames on the river chamber middle wall. The scope includes heavy demolition, concrete wire-sawing, core drilling, and the use of certified commercial dive teams for underwater inspection and cofferdam sealing. The contractor must provide and operate a compliant floating plant, including a crane/deck barge and push boat, in accordance with EM 385-1-1. The work is to be completed within 730 calendar days after the notice to proceed. This is an unrestricted full and open solicitation under NAICS code 237990, with a small business size standard of 45 million dollars. Award will be granted to the lowest responsive and responsible offeror, with a 10 percent price evaluation preference provided to HUBZone certified firms. Bidders must maintain active registrations in the System for Award Management and the Procurement Integrated Enterprise Environment, as all responses must be submitted electronically via PIEE. The contract requires performance and payment bonds, adherence to the Davis-Bacon Act under wage determination PA20260002, and the execution of partnering sessions between the contractor and government personnel. Final acceptance is contingent upon a pre-final inspection and a formal final acceptance inspection to ensure the facility is returned to a condition equal to or better than its original state.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS