East County Sand Mine

Awarded
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The East County Sand Mine project, located at 12101 Highway 67 in Lakeside, San Diego County, involves a Major Use Permit and Reclamation Plan to extract approximately 674,000 cubic yards of material, consisting of 632,000 cubic yards of sand and 42,000 cubic yards of topsoil. The operation spans a 27.58-acre site, with sand mining concentrated in deep pits over 17.87 acres to a maximum depth of 415 Mean Sea Level. The project utilizes specific cut slopes of 1.5:1 down to the groundwater level and 3:1 to 3.5:1 below the water table. Additionally, approximately 677,000 cubic yards of clean and inert soil, rock, and concrete will be imported for use as on-site fill, channel rip-rap, and for sale. The project is scheduled for execution in six phases over a 15-year period, with reclamation occurring concurrently with the completion of each extraction phase and a final five-year monitoring period for Phase 5 reclamation during Phase 6. Environmental mitigation includes the creation of new Slaughterhouse Creek and San Vicente Creek channels designed for 100-year storm flows, the expansion of the Anderson channel, and the establishment of an open space easement. The project has been approved by the California Department of Fish and Wildlife and the San Diego Water Board, with the County of San Diego Planning and Development Services serving as the Lead Agency. All operations must adhere to the adopted Mitigation Reporting or Monitoring Plan to ensure no significant environmental effects.

General Info

East County Sand Mine extracts 674k cy sand/topsoil, reclaims site over 15 years, mitigates impacts via new creek channels and soil recycling.

Agency

California → San Diego County

NAICS

212321 - Construction Sand and Gravel MiningView NAICS

Place of Performance

STATE ROUTE 67 AND MORENO AVENUE, CA, 92040

Set-Aside

NONE

Documents

(2)

EPIMS-SDO-41731-R5 CDFW Notice of Determination for East County Sand Mine

PDFnotice-of-determination

Notice of Determination for East County Sand Mine Project R9-2025-0141

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Diego County
Office AddressN/A
Contacts
Alan MonjiENVIRONMENTAL SCIENTIST

Full Description

Show more
The Project consists of a Major Use Permit (MUP) and a Reclamation Plan. The MUP will mine approximately 674,00 cubic yards (CY) of material, 632,000 CY sand and 42,000 CY topsoil out of the entire 27.58 acre Project site. The extraction areas will have 1.5:1 cut slopes down to the groundwater level and 3:1 to 3.5:1 slopes below the water table during the extraction process. Sand mining will occur primarily in deep pits over a 17.87-acre portion of the 27.58 area with a maximum depth of extraction to elevation above 415 Mean Sea Level (MSL). Topsoil mining will occur in the upper four feet of the sand pits and the remainder of the Project site. Approximately 677,000 CY of clean and inert soil, rock, and concrete will be imported and recycled for use as on-site fill, channel rip-rap, and for sale. Sand and topsoil extraction and site reclamation will occur in six phases over a 15-year period. Reclamation of each extraction area will occur concurrent with the completion of each extraction phase. Phase 6 includes the five-year monitoring of Phase 5 reclamation.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS