This Solicitation opportunity from Georgia was posted on February 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
East Lake Booster Pump Station (BPS) Relocation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract entails the pre-construction consultation and construction for replacing the existing East Lake Booster Pump Station (BPS) at its current location. The project includes installing approximately 5,000 linear feet of new water main piping connected to the BPS site, aimed at enhancing system hydraulics. The new BPS will feature horizontal split case pumps housed within a new building designed to maintain current operations of the on-site ground storage tanks. Additional components will include a standby power generator with an automatic transfer switch, demolition of the existing BPS interior while potentially retaining the existing building for storage, and new facilities such as a roll-up door, crane system for pump maintenance, and a climate-controlled electrical room with new switchgear and variable frequency drives (VFDs). Issued by the Henry County Water and Sewer Authority in Georgia, this solicitation was posted on February 20, 2026, with a response deadline of March 20, 2026. The contract opportunity, identified as PE-67555-NONST-2026-000000018, seeks qualified vendors to execute the work under a state and local government agency (SLED) procurement process. Points of contact for the project include Jeff Allen, reachable via email or phone, facilitating direct communications related to the solicitation and project specifics.
General Info
Agency
NAICS
Place of Performance
GA, USASet-Aside
Timeline
Submission Closed
