Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Georgia was posted on February 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

East Lake Booster Pump Station (BPS) Relocation

Closed
PE-67555-NONST-2026-000000018State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. With an engineer's estimate of 36,000,000 dollars, the project is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. Filanc is soliciting quotes for a wide range of scopes, including pipeline infrastructure such as pipe, valves, welding, cathodic protection, and jack and bore operations; site work including paving, striping, flatwork, precast vaults, fencing, and potholing; and technical services such as surveying, videography, testing, inspections, settlement monitoring, and E&IC. Additional requirements include SWPPP implementation, traffic control and plans, and asbestos pipe demolition and removal. Bids are due by 2:00 PM on September 18, 2026. The solicitation is open to various small business set-asides, including SDB, WOSB, HUBZone, and VOSB, and strongly encourages participation from SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, and equipment if necessary. Interested parties can obtain plans and specifications at no cost by contacting Julia Masaitis. The project falls under NAICS code 237110 and emphasizes a strict commitment to equal opportunity and non-discrimination.
Filanc

POSTED

about 12 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The contract entails the pre-construction consultation and construction for replacing the existing East Lake Booster Pump Station (BPS) at its current location. The project includes installing approximately 5,000 linear feet of new water main piping connected to the BPS site, aimed at enhancing system hydraulics. The new BPS will feature horizontal split case pumps housed within a new building designed to maintain current operations of the on-site ground storage tanks. Additional components will include a standby power generator with an automatic transfer switch, demolition of the existing BPS interior while potentially retaining the existing building for storage, and new facilities such as a roll-up door, crane system for pump maintenance, and a climate-controlled electrical room with new switchgear and variable frequency drives (VFDs). Issued by the Henry County Water and Sewer Authority in Georgia, this solicitation was posted on February 20, 2026, with a response deadline of March 20, 2026. The contract opportunity, identified as PE-67555-NONST-2026-000000018, seeks qualified vendors to execute the work under a state and local government agency (SLED) procurement process. Points of contact for the project include Jeff Allen, reachable via email or phone, facilitating direct communications related to the solicitation and project specifics.

General Info

Replace East Lake Booster Pump Station with new pumps, piping, generator, and upgraded facilities.

Agency

Georgia → Henry County Water and Sewer AuthorityView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(1)

East Lake BPS Relocation Construction Manager at Risk Invitation

PDF1 pagerfp

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Henry County Water and Sewer Authority
Contacts1 person available
OfficeN/A
Organization / Agency
Georgia → Henry County Water and Sewer Authority
View Agency Profile
Office AddressN/A

Full Description

Show more
The Project consists of the following major elements: pre-construction consultation and construction of a replacement of the existing East Lake BPS with a new BPS on the existing site, as well as approximately 5,000 linear feet (LF) of new water main outside of the existing BPS property (suction and discharge piping) to improve the system hydraulics. The new BPS is anticipated to have the following features: - Horizontal split case pumps inside new BPS building - Site piping designed to maintain the existing operations of the onsite ground storage tanks - Standby power generator with automatic transfer switch - The existing BPS interior will be demolished, and the building will be left for storage if possible - The new building will have a roll up door and crane system for pump removal/access, climate controlled electrical room with new switchgear and VFDs.