East Metro Isolation Bay Renovation

Closed
IFB 325DE002State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
STADIUM GATEWAY PARKING LOT SLURRY SEAL SERVICES
Solicitation # 26-27-12
The City of Anaheim is soliciting bids for slurry seal services at the Stadium Gateway Parking Lot, located at 1900 S. State College Blvd. The project involves cleaning and preparing approximately 158,000 square feet of asphalt, applying one coat of Type 1 slurry seal, and restriping the lot to its existing layout with two coats of paint and updated stenciling. All work must be completed within 45 calendar days of commencement, with the specific requirement that the application be finished in two moves over a single weekend. The contract will be awarded to the lowest responsive and responsible bidder, with evaluation factors including price, past performance, and the ability to meet all technical specifications. Qualified bidders must hold a valid California C-32 Parking and Highway Improvement Contractor's License and be registered as a Public Works Contractor with the Department of Industrial Relations to ensure the payment of prevailing wages. Required submittals include a bid bond, proof of insurance, and a completed vendor questionnaire. Upon award, the contractor must provide performance and labor and materials bonds equal to 100 percent of the annual contract value within 10 calendar days. The contract includes a one-year warranty against defects in workmanship and materials, and requires the submission of Safety Data Sheets for all hazardous substances used. Bids must be submitted electronically by December 18, 2026, and remain valid for 180 days following the closing date.
Convention/Sports/Entertainment

POSTED

about 6 hours ago

DEADLINE

in 30 days
NAICS: 237310
New
SLED
P-020-170-002A Bridge Crossing and Trail Improvements at Patapsco Valley State Park – Mckeldin Area
Solicitation # BPM059427
Solicitation BPM059427 is an Invitation for Bids issued by the Maryland Department of General Services for the construction of a new pedestrian and equestrian bridge in the McKeldin Area of Patapsco Valley State Park. The project involves installing a 105-foot precast concrete bridge consisting of five arch culvert sections with architectural fieldstone facing and 54-inch high breakaway timber safety rails. Additional scope includes trail restoration and tree planting. All work must adhere to the 2026 MDOT-SHA Standard Specifications for Construction and Materials. Bids are due by January 11, 2027, via the eMMA portal, and the contract will be awarded by lot to the responsible bidder offering the lowest price. Key requirements for bidders include the submission of a Bid/Proposal Affidavit, a valid county construction firm license, and at least three professional references. The contract mandates a 25.00 percent MBE and 1.0 percent VSBE procurement goal. Financial guarantees include performance and payment bonds of 200,000 dollars if the award value exceeds that amount. Contractors are subject to prevailing wage rates, Buy American Steel requirements, and a one percent electronic transaction fee on approved invoices. Project completion is defined by the successful testing of all systems and the approval of the Department of General Services.

POSTED

about 9 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
SLED
2017 Fire Damaged Roadway Repairs
Solicitation # C02239
The City of Santa Rosa Transportation and Public Works Department is soliciting bids for the 2017 Fire Damaged Roadway Repairs project, which involves repairing pavement damage caused by the Tubbs Fire. The scope of work is focused on two primary roadway corridors: Bicentennial Way from Cleveland Ave to the Fountaingrove Pkwy on-ramp, and Fountaingrove Pkwy from Mendocino Ave to Daybreak Ct. Key deliverables include the provision of as-built drawings, the replacement of damaged striping with thermoplastic, and the maintenance and relocation of rural mailboxes. The project requires adherence to City Construction Specifications for Public Improvements, City Design and Construction Standards, and the most current Caltrans Standard Specifications. The contract will be awarded to the responsible bidder who submits the lowest responsive bid. Bidders must provide a bid bond of 10 percent of the maximum bid amount, and the successful contractor will be required to provide performance and payment bonds for 100 percent of the contract price. Performance requirements include strict equipment labeling, the submission of baseline and progress schedules, and compliance with ADA standards for curb ramps. The project is subject to prevailing wage requirements and requires the contractor to maintain workers compensation insurance. Bids must be submitted in a sealed envelope to the Transportation and Public Work Department office in Santa Rosa.
Transportation and Public Works Department of City of Santa Rosa

POSTED

about 9 hours ago

DEADLINE

in 29 days
NAICS: 237310
New
SLED
Asphalt Rehabilitation At Diaz Road Facility
Solicitation # 265-2026
The Rancho California Water District is soliciting bids for solicitation 265-2026 to perform asphalt pavement rehabilitation and concrete flowline replacement at its former headquarters facility located at 28061 Diaz Road, Temecula, California. The scope of work includes the removal and replacement of approximately 16,510 square feet of asphalt to a depth of four inches, the milling and overlay of 7,150 square feet of asphalt, and the replacement of 52 linear feet of 6-inch concrete flowline across three locations. The project must be executed in two coordinated phases to ensure continuous access for commercial deliveries and businesses, with all work completed within 30 calendar days of the award and on-site construction finished within five consecutive calendar days of commencement. The contract will be awarded to the lowest responsive and responsible bidder based on the total bid amount. Bidders must submit their proposals via the PlanetBids platform by November 25, 2026, at 2:00 p.m., and must provide bid security of at least 10% of the total bid amount. Mandatory requirements include current registration with the Department of Industrial Relations, compliance with California State Labor Code prevailing wage laws, and the submission of a non-collusion declaration and workers' compensation certification. The successful contractor will be required to provide performance and payment bonds equal to 100% of the contract price and must implement a comprehensive construction site safety plan. Payment may be structured as a lump sum upon project completion or through progress payments.
Procurement Department of Rancho California Water District

POSTED

about 9 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The East Metro Isolation Bay Renovation contract, identified as IFB 325DE002 and managed by the Regional Transportation District (RTD) in Colorado, focuses on critical repairs to Inspection Pit 4, originally constructed in 1980. The project addresses significant structural failures, including detachment of structural steel from the supporting concrete stem wall and visible signs of concrete deterioration. Designed by Short Elliott Hendrickson (S.E.H.), the scope includes complete utility removal from Pit 4, demolition of remaining steel components, lowering of the stem walls below finish grade, reinforcement installations to connect stem walls with the structural deck, new concrete placement, and reinstallation of steel and utilities. The project manual and construction drawings outline comprehensive requirements spanning demolition, concrete, metals, mechanical, plumbing, electrical, and fire protection work while coordinating with existing RTD operations and adhering to applicable building codes and safety standards. This solicitation, posted November 25, 2025, seeks fixed-price bids with a response deadline of January 6, 2026, and anticipates a one-year period of performance upon contract award and issuance of a Notice to Proceed. The contract value is estimated at approximately $223,392, based on an independent cost estimate reflecting all construction elements, fees, insurance, and contingencies. The procurement encourages subcontracting opportunities but sets a zero percent Small Business Enterprise (SBE) participation goal due to limited subcontracting scope. Key administrative and contractual provisions require the contractor to comply with detailed packaging, storage, and labeling standards; submit key personnel documentation; maintain OSHA and local safety compliance; and provide organizational conflict of interest (OCI) disclosures. Inspection, acceptance, and quality control conform to industry standards such as AWS D1.1 for welding, ANSI/AISC for structural steel, ASME for piping, and applicable electrical codes. The contract includes robust requirements for documentation, electronic invoicing, and procurement through RTD’s online portal, ensuring transparency, regulatory compliance, and safe, high-quality execution of the renovation.

General Info

RTD is seeking responses from qualified respondents to provide repairs and renovations to the East Metro isolation bay (Pit 4) This project includes the replacement of various components of the existing RTD East Metro Inspection Pit The Work includes: All construction supervision, demolition, rebuilding, and furnishing and installing of materials; all permits, labor, materials, tools and equipment, and any incidentals necessary to provide a complete and functional system. This includes all concrete, structural steel, mechanical, plumbing, lighting, and electrical connections. The contractor shall dispose of all removed material in accordance with state and federal laws. All work shall adhere to all applicable codes, built to industry standards, and installed in a professional manner.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 8 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 12 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyColorado → Capital Programs
Contacts2 people available
OfficeDenver, CO, 80202, USA

Interested Companies (8)

A.D. Miller ServicesCentennial, CO
Bauen StudiosDenver, Colorado
Canyon Metal Works

See All 8 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Inspection Pit 4 was installed as part of the original building construction in 1980. The structural steel of the drive lane of Pit 4 has pulled away from the concrete stem wall and has been shored up twice in past projects. Currently, the concrete stem wall that supports the structural steel and also acts as a retention wall for Pit 4 shows signs of failure. The design for repair of inspection Pit 4 was conducted by the design team of S.E.H. The repairs in this project include removing all utilities from Pit 4, removing any remaining structural steel, cutting the concrete stem walls to 16" below finish grade, installing reinforcement that ties the stem wall to the structural deck, placing new concrete, then installing all structural steel and utilities.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS