Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

East Valley Parkway and Midway Drive Drainage Improvement Project - PL24-0257

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Escondido

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

East Valley Parkway and Midway Drive, Escondido, CA, 92025

Set-Aside

NONE

Documents

(10)

East Valley Parkway and Midway Drive Drainage Improvement Project Summary Form

PDFenvironmental-summary

IS-MND Appx E_Noise & Vibration Assessment Memorandum

PDFtechnical-memorandum

Caltrans Comment Letter on East Valley Parkway Drainage Improvement Project MND

PDFcomment-letter

Notice of Intent to Adopt Mitigated Negative Declaration for East Valley Parkway and Midway Drive Drainage Improvement Project

PDFspecial-notice

East Valley Parkway and Midway Drive Drainage Improvement Project Notice of Completion

PDFnotice-of-completion

East Valley Parkway and Midway Drive Drainage Improvement Project Draft IS-MND October 2025

PDFinitial-study-mitigated-negative-declaration

Draft Biological Technical Report for East Valley Parkway and Midway Drive Drainage Improvement Project

PDFbiological-technical-report

IS-MND Appx A_AQ-GHG-Energy Memo - East Valley Parkway Drainage Project

PDFtechnical-memorandum

Cultural Resource Assessment Memorandum for East Valley Parkway and Midway Drive Drainage Improvements Project

PDFcultural-resource-assessment

Preliminary Geotechnical Evaluation for Escondido East Valley Parkway & Midway Drive Drainage Project

PDFgeotechnical-evaluation

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Escondido
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Escondido
Office AddressN/A
Contacts
Matthew SouttereProject Manager, Capital Improvements Project
Melissa WhittemoreAssociate/Senior Environmental Project Manager
Ivan FloresPrincipal Planner

Interested Companies (1)

Show more
Michael Bakers International
San Diego, CA

Full Description

Show more
The proposed East Valley Parkway and Midway Drive Drainage Improvement Project (hereafter referred to as “proposed project” or “project”) would involve increasing the capacity of the storm water drainage systems in the central portion of the city. The existing storm water drainage systems in the project area are undersized and unable to collect and convey anticipated flow rates, resulting in more than 1,600 properties being completely or partially within a Federal Emergency Management Agency (FEMA) 100year floodplain. Localized flooding occurs within the project area and has triggered deployment of sandbags and road closures an average of five times per year since 2019. The proposed project would involve the construction of: • Approximately 16,700 linear feet of reinforced concrete box culverts beneath existing roadways and adjacent public rights-of-way (e.g., sidewalks), • Approximately 4,400 linear feet of reinforced concrete pipelines beneath existing roadways and adjacent public rights-of-way (e.g., sidewalks), and • Four new points of connection for storm water to enter Escondido Creek within the project site. The culverts would range in size from a single 6-foot by 4-foot culvert (24 square feet in area) to a dual 12-foot by 10-foot culvert (240 square feet in area). The pipelines would be 36 inches in diameter (approximately 7 square feet in area) and 54 inches in diameter (about 16 square feet in area). The project would require relocation of some existing underground utility lines to accommodate the proposed storm water drainage culverts. After relocation of existing utilities and installation of the proposed storm water drainage culverts and pipes, the affected roadways/sidewalks would be resurfaced. Road resurfacing would include the provision of storm water drainage inlets along both sides of the roads to collect runoff. The proposed storm water drainage improvements would provide filtration and treatment of runoff before discharging into Escondido Creek pursuant to state and regional water quality requirements. The proposed culverts/pipes would be installed beneath existing public rights-of-way primarily associated with roadways and sidewalks, including segments of North Midway Drive, South Midway Drive, East Lincoln Avenue, East Mission Avenue, North Citrus Avenue, North Rose Street, East Grand Avenue, East Washington Avenue, Daisy Street, and an unnamed alley immediately south of East Washington Avenue and north of Escondido Creek, between North Rose Street and Begonia Street. Construction of the proposed project is anticipated to commence in the first quarter of 2026 and be completed in approximately 24 months.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Peninsula Avenue And Delaware Street Traffic Signal Modification Project
Solicitation # 46R031
The Peninsula Avenue and Delaware Street Traffic Signal Modification Project (Project No. 46R031) is a public works solicitation issued by the City of San Mateo, California. The project involves modifying the street lighting system to ensure full functionality and operational capacity, with a scope of work that includes mobilization, temporary traffic and pedestrian control, asphalt paving and base removal, and the installation of various concrete structures, pavement markings, and electrical components. The estimated construction cost is 533,325 dollars, and the project must be completed within 45 working days. Bids are due by 2:00 p.m. on October 15, 2026, and must be submitted as sealed bids to the City Clerk. The contract will be awarded to the lowest responsive and responsible bidder who possesses a Class A contractor's license and the necessary capacity to perform the work. Award criteria include the bidder's experience, the quality of previous work and materials, and the ability to meet the project timeline. Requirements for the winning contractor include providing a bid bond of at least 10 percent of the aggregate bid, as well as performance and payment bonds equal to the full contract price. Additionally, the contractor must comply with California Prevailing Wage Law, ADA accessibility standards, and provide a one-year warranty against latent faults or defective materials. All work must adhere to the 2018 Caltrans Standard Plans and the April 15, 2022, Caltrans Revised Standard Specifications.
CITY OF SAN MATEO, CALIFORNIA

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 11 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS