EASTERLY TUNNEL DEWATERING AND DIVISION AVENUE PUMP STATION IMPROVEMENTS
Open
EB-2518State & Local
Response Deadline
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
The Northeast Ohio Regional Sewer District (NEORSD) is soliciting bids for the Easterly Tunnel Dewatering and Division Avenue Pump Station Improvements (Solicitation EB-2518). The project requires a contractor to provide all labor, materials, and equipment necessary for the execution of work at the Easterly Tunnel Dewatering Pump Station and Division Avenue Pump Stations. Key technical requirements include the installation of complete and operable electrical systems and power distribution in compliance with NFPA 70 and NEMA 250, as well as adherence to the International Building Code for earthquake requirements. The scope also includes a comprehensive quality control program and the submission of electronic shop drawings and preconstruction media.
Bids must be submitted electronically via the OpenGov portal by January 20, 2027. The selection process emphasizes responsiveness, with a requirement for the two lowest bidders to submit a Qualification Questionnaire within 72 hours of the bid opening. Contractors must comply with Build America, Buy America (BABA) requirements, Davis-Bacon Act prevailing wage rates, and the Americans with Disabilities Act. Additionally, the contract includes a Small Business Enterprise (SBE) policy requiring bidders to meet specific contract goals or demonstrate good faith efforts. There is no specified set-aside status for this solicitation.
General Info
NEORSD seeks bids for Easterly Tunnel dewatering and Division Avenue pump station improvements.
PDF, High priority: read this first9 pages · sbe-data-sheets
HighAI Summary for 72 Hour Document BOP Data Sheets and Good Faith Efforts Checklist: This document provides instructions and forms related to the Business Opportunity Program (BOP) for subcontractor participation. It includes Data Sheets 1, 1a, 2, and 3 for identifying prime and subcontractors, joint ventures, and subcontractor declinations. The document also contains a Good Faith Efforts Checklist that contractors must complete to demonstrate efforts to meet Small Business Enterprise (SBE) participation goals. The forms require signatures and detailed information about subcontractors and joint ventures. The checklist ensures contractors document solicitation efforts, identify subcontracting opportunities, and engage with the District's Office of Contract Compliance. This document is essential for contractors to comply with BOP requirements and demonstrate good faith in subcontractor utilization.
PDF
PDF, High priority: read this first10 pages · contract-document
HighAI Summary for Agreement Between Owner and Contractor - Northeast Ohio Regional Sewer District: A sample contract agreement between the Northeast Ohio Regional Sewer District (Owner) and a Contractor. The document outlines essential terms including time of completion, contract sum structure, liquidated damages for delays, and comprehensive insurance requirements for the contractor and its subcontractors.
PDF
PDF, High priority: read this first34 pages · special-notice
HighAI Summary for American Iron and Steel Compliance and Implementation Guidance: This document outlines the American Iron and Steel (AIS) requirements under P.L. 113-76, Consolidated Appropriations Act, 2014, applicable to projects funded by the Clean Water State Revolving Fund and Drinking Water State Revolving Fund. It includes contractor acknowledgments, compliance warranties, and the conditions under which waivers may be granted. The memorandum section provides detailed implementation guidance, including project coverage, definitions of iron and steel products, and the waiver process. The document is intended to ensure that all iron and steel products used in relevant projects are produced in the United States, with exceptions and oversight provisions clearly described.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for Bidder's Qualification Questionnaire: A qualification questionnaire for public improvement contracts updated 04/02/2026. It requires the two lowest bidders to submit detailed information within 72 hours of bid opening to verify financial responsibility, safety records, equipment availability, and past performance on similar projects.
PDF
PDF, High priority: read this first29 pages · implementation-procedures
HighAI Summary for Build America Buy America Act Implementation Procedures for EPA Office of Water: This memorandum outlines the implementation procedures for the Build America, Buy America Act (BABA) as applied to the EPA Office of Water Federal Financial Assistance Programs. Issued by Assistant Administrator Radhika Fox, it supplements OMB Guidance M-22-11 with specific clarifications for EPA water infrastructure programs. The document details the domestic sourcing requirements effective May 14, 2022, for iron, steel, manufactured products, and construction materials used in federally funded infrastructure projects. It covers multiple EPA water infrastructure programs subject to BABA, including Clean Water and Drinking Water State Revolving Funds, Tribal Infrastructure Grants, and others. The memorandum provides guidance on compliance, waivers, and contract language to ensure adherence to BABA, aiming to support domestic manufacturing and resilient supply chains in the water sector.
PDF
PDF, High priority: read this first8 pages · wage-determination
HighAI Summary for Davis-Bacon Wage Rate Requirements Guidance: This document outlines the Davis-Bacon Wage Rate Requirements applicable to construction projects funded by the Clean Water and Drinking Water State Revolving Funds as of October 30, 2009. It details responsibilities for Ohio EPA and assistance recipients, including municipal or local governmental entities, to ensure compliance with wage determinations from the Department of Labor. The document covers procedures before advertising for bids, during the advertisement period, after bid opening, and during construction, emphasizing monitoring, incorporation of wage determinations, contractor and subcontractor compliance, employee interviews, payroll spot checks, and reporting violations. It serves as a required contract provision to ensure prevailing wage standards are met on federally funded projects.
PDF
PDF, High priority: read this first6 pages · ifb
HighAI Summary for Easterly Tunnel Dewatering and Division Avenue Pump Station Improvements: An invitation for bids (IFB) released on November 24, 2026, for improvements to the Easterly Tunnel Dewatering Pump Station (ETDPS) and Division Avenue Pump Station (DAPS). The project involves mechanical, architectural, and life safety upgrades at ETDPS and pump replacement at DAPS. The bid opening is scheduled for January 20, 2027, and includes a bid form with lump sum payment items and specific allowances.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Easterly Tunnel Dewatering and Division Avenue Pump Station Improvements - Technical Specifications: Technical specifications for the Northeast Ohio Regional Sewer District's Easterly Tunnel Dewatering and Division Avenue Pump Station Improvements project (1670 ETD/DA PSI). Issued for bid in November 2026, the document includes a detailed table of contents covering General Requirements (Division 01), Existing Conditions (Division 02), Concrete (Division 03), Metals (Division 05), Thermal and Moisture Protection (Division 07), Openings (Division 08), Finishes (Division 09), HVAC (Division 23), and Electrical (Division 26).
PDF
PDF, High priority: read this first57 pages · contract-document
HighAI Summary for General Terms and Conditions to the Agreement Between Owner and Contractor: General Terms and Conditions governing the agreement between an Owner and Contractor. The document outlines critical contractual obligations including progress payments, construction administration, dispute resolution, change orders, safety requirements, and termination clauses.
PDF
PDF, High priority: read this first2 pages · supporting-document
HighAI Summary for Listing of Proposed Business Opportunity Program (BOP) Subcontractors: A required submission form for the two lowest bidders to list proposed SBE/DBE subcontractors within 72 hours of bid opening. The document requires details on subcontractor names, locations, services, work components, and subcontract values to ensure compliance with NEORSD SBE Business Opportunity Program goals and Ohio EPA DBE utilization requirements.
PDF
PDF, High priority: read this first2 pages · ifb
HighAI Summary for NEORSD 1670 Easterly Tunnel Dewatering and Division Avenue Pump Station Improvements: Legal notice for Bid File No. EB2518 regarding improvements to the Easterly Tunnel Dewatering and Division Avenue Pump Stations. Work includes pump replacements, piping modifications, and structural repairs. Bids are due January 20, 2027, via OpenGov. Estimated construction cost is $5,300,000 with a 20% SBE goal.
PDF
PDF, High priority: read this first162 pages · specifications
HighAI Summary for NEORSD Easterly Tunnel Dewatering / Division Ave Pump Station Improvements - Vol 2: Volume 2 of the contract documents for Project No. 1670, issued for bid in November 2026. This document contains the Front End Documents and Division 01 General Requirements, as well as a comprehensive Table of Contents for technical specifications spanning multiple divisions including Concrete, Metals, Thermal Protection, Openings, Finishes, HVAC, and Electrical.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Northeast Ohio Regional Sewer District - Easterly Tunnel Dewatering and Division Avenue Pump Station Improvements: Table of Contents for the technical specifications issued for bid in November 2026. The document outlines the project scope for the Easterly Tunnel Dewatering and Division Avenue Pump Station Improvements, covering General Requirements (Division 01), Existing Conditions (Division 02), Concrete (Division 03), Metals (Division 05), Thermal and Moisture Protection (Division 07), Openings (Division 08), Finishes (Division 09), HVAC (Division 23), and Electrical (Division 26).
PDF
PDF, High priority: read this first14 pages · instructions-to-bidders
HighAI Summary for Northeast Ohio Regional Sewer District Instructions to Bidders: This document titled 'Instructions to Bidders' from the Northeast Ohio Regional Sewer District provides detailed guidance for bidders participating in a public improvement contract. It includes definitions, advertisement details, bid submission procedures, form requirements, pricing instructions, and bidder qualifications. The document outlines the electronic bid submission process, bid form completion rules, criteria for bid acceptance or rejection, and conditions related to bidder and subcontractor eligibility. It also covers handling of prices, mathematical errors, and the requirement for a schedule of values post-award. This version is structured with articles covering all essential instructions to ensure compliance and proper bid evaluation.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Prevailing Wage Rates - Skilled Crafts: This document outlines the prevailing wage rates and fringe benefits for various skilled crafts, including Asbestos Workers, Boilermakers, and Bricklayers. It specifies base hourly rates (BHR), fringe benefit payments, apprentice ratios, and jurisdictional boundaries for various unions (e.g., Asbestos Local 207, Boilermaker Local 744) with effective dates ranging from 2024 to 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Project 1670: Easterly Tunnel Dewatering and Division Avenue Pump Station Improvements - Drawings: Issued November 2026, this document provides the general drawings, symbols, and technical specifications for Project 1670 (Easterly Tunnel Dewatering and Division Avenue Pump Station Improvements). It includes a list of drawings across general, civil, electrical, structural, instrumentation, and process mechanical disciplines, as well as symbology and civil general notes for the contractor.
LowAI Summary for 72 Hour Document Non-Collusion Affidavit for Northeast Ohio Regional Sewer District: This document is a Non-Collusion Affidavit sworn by an individual, partnership, or corporation submitting a bid to the Northeast Ohio Regional Sewer District. It affirms that the bid is genuine, not collusive or sham, and that no agreements or communications have been made to fix bid prices or secure unfair advantages. The affidavit includes declarations about the identities and representations of the bidding parties, including officers, attorneys, and agents, and is notarized to confirm its authenticity.
PDF
PDF, Low priority3 pages · certification
LowAI Summary for 72 Hour Lobbying Certification and Disclosure: This document is a Certification Regarding Lobbying and the associated Disclosure of Lobbying Activities (Standard Form-LLL). It certifies that no federal appropriated funds have been used to influence federal officials in connection with federal contracts, grants, loans, or cooperative agreements. It requires disclosure if other funds have been used for lobbying. The form includes instructions for completion, detailing the reporting requirements under 31 U.S.C. 1352, and the penalties for non-compliance. The document is approved by OMB and includes sections for reporting entity information, federal action details, and lobbying registrant data.
PDF
PDF, Low priority1 page · acknowledgement
LowAI Summary for American Iron and Steel Acknowledgement Document: This document is an American Iron and Steel Acknowledgement related to a contract funded by the Clean Water State Revolving Fund and/or Drinking Water State Revolving Fund. It outlines the Contractor's understanding and compliance with the American Iron and Steel Requirement, which mandates that all iron and steel products used in the project be produced in the United States. The Contractor represents and warrants compliance, agrees to provide further certification if requested, and acknowledges potential damages for non-compliance. The State is recognized as a third-party beneficiary of this agreement. The document includes a signature section for the authorized signatory and a checkbox for requesting waivers for non-American made iron and steel products.
PDF
PDF, Low priority1 page · acknowledgement
LowAI Summary for Build America Buy America Acknowledgement: This document is a Build America, Buy America Acknowledgement related to a contract funded with federal monies in the State of Ohio. It outlines the contractor's understanding and compliance with the statutory requirements that all iron, steel, manufactured products, and construction materials used in the project must be produced in the United States. The contractor represents and warrants compliance or the provision of necessary certifications or waivers. It also details the consequences of non-compliance, including potential damages recoverable by the Owner or Funding Authority. The document includes provisions for third-party beneficiary status of the Funding Authority and requires the authorized signatory's name, title, and bidder's firm information.
PDF
PDF, Low priority2 pages · certification
LowAI Summary for Certification Regarding Debarment, Suspension, and Other Responsibility Matters: This document is a Certification Regarding Debarment, Suspension, and Other Responsibility Matters related to Federal assistance programs. It instructs prospective recipients of EPA grants, loans, or cooperative agreements, as well as contractors and subcontractors, to certify that they are not debarred, suspended, or otherwise ineligible to participate in Federal transactions. The certification includes statements about the absence of convictions, indictments, or terminations for cause within the past three years. It also warns that false statements may lead to rejection or termination of awards and potential legal penalties. The document provides submission instructions and contact information for the Ohio EPA Division of Environmental and Financial Assistance.
PDF
PDF, Low priority1 page · certification
LowAI Summary for Contractor Equal Employment Opportunity Certification: This document is a Contractor Equal Employment Opportunity Certification outlining the contractor's commitment to non-discrimination and affirmative action during contract performance. It references compliance with Executive Order No. 11246 of September 24, 1965, and related regulations. The certification includes obligations such as posting notices, non-discriminatory hiring practices, communication with labor unions, and enforcement provisions. It also mandates inclusion of this clause in subcontracts and purchase orders. The document requires signature, date, and identification of the signer and firm.
PDF
PDF, Low priority1 page · special-notice
LowAI Summary for NEORSD Resolution No. 210-26: Authorization to Advertise: Resolution No. 210-26, adopted November 19, 2026, by the Northeast Ohio Regional Sewer District. It authorizes the publication of a notice calling for bids for the Easterly Tunnel Dewatering and Division Avenue Pump Station Improvements (ETDDAPSI) project, with an estimated construction cost of $5,300,000.00, in accordance with Ohio Revised Code Section 6119.10.
PDF
PDF, Low priorityother
LowAI Summary for Northeast Ohio Regional Sewer District Mercury Free Purchasing Policy: This document outlines the Northeast Ohio Regional Sewer District's policy to minimize and avoid the purchase of equipment or materials containing mercury. It serves as part of a Pollutant Minimization Plan (PMP) to comply with NPDES permits and protect the environment. The policy establishes guidelines for purchasing goods, services, and capital improvements, requiring mercury disclosure from vendors and risk-based analyses for capital projects.
PDF
PDF, Low priority20 pages · policy-manual
LowAI Summary for Northeast Ohio Regional Sewer District Small Business Enterprise Program Policies and Procedures Manual: This document is the Small Business Enterprise (SBE) Program Policies and Procedures Manual for the Northeast Ohio Regional Sewer District (NEORSD). It outlines the program's purpose to promote economic opportunities for small businesses in the Cleveland metropolitan area and surrounding counties. The manual includes definitions of key terms such as Affiliate, Bidder, Commercially Useful Function, Contract, and Joint Venture. It also details program administration, eligibility standards, contract award and performance procedures, and remedies for non-compliance. The document aims to administer a race- and gender-neutral contracting program to support small business growth and ensure equal opportunity in NEORSD contracts.
The Northeast Ohio Regional Sewer District (Sewer District) protects public health and the environment by leading effective wastewater and stormwater management. As the largest wastewater treatment provider in the State of Ohio, the Sewer District spans 380 square miles, serves 62 communities and one million residents, treats 90 billion gallons of wastewater a year, and manages more than 400 miles of streams. In addition to its award-winning treatment plant and laboratory performance, the Sewer District's Project Clean Lake construction program will reduce annual Lake Erie pollution by 4 billion gallons by 2035, while its Regional Stormwater Management Program addresses widespread inter-community problems like flooding, pollution, and erosion. NEORSD is an Equal Opportunity Employer. We are committed to fostering a diverse and inclusive workforce, recognizing the full range of human differences and similarities. Through our unwavering efforts to leverage the potential of our diversity, we continually strive to build and foster an environment that respects each individual . We encourage and promote innovation and provide opportunities for all employees to interact, communicate, and realize the full potential of their talents.
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.