Eastern Water Distribution System Reliability Project

Open
PE-75553-NONST-2026-000000067State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Eastern Water Distribution System Reliability Project, managed by Dalton Utilities in Georgia, involves the comprehensive rehabilitation of water infrastructure across numerous roads, including Tibbs Bridge Rd, Headrick Circle, and Sane Rd. The scope of work includes replacing existing pipe infrastructure, valves, and fire hydrants, installing new services, connecting existing mains, and performing driveway crossings using rock or concrete. The contractor is also responsible for all erosion, sedimentation, and pollution control, as well as full site restoration to ensure post-construction conditions are equal to or better than those existing prior to the project. The contract will be awarded to the lowest responsible and responsive bidder, though the owner reserves the right to select the best overall value based on price, schedule, and experience. Bidders must be able to begin work within three weeks of the award and complete the project within a maximum of 455 calendar days. Key requirements include a 10% bid bond, 100% performance and payment bonds, and adherence to Davis-Bacon prevailing wage standards. Additionally, the project mandates specific socioeconomic goals, including a 4.0 percent participation goal for both Minority Business Enterprises (MBE) and Women's Business Enterprises (WBE). Technical specifications require strict adherence to AWWA color codes for detection tape and the use of mechanical equipment for unloading materials to prevent damage. Quality is ensured through owner-led final inspections and operating tests, with a requirement that any identified deficiencies be corrected within five calendar days. Bidders must provide a Statement of Bidder's Qualifications, proof of bonding capacity, and a three-year OSHA incident rate to be considered for the award.

General Info

Dalton Utilities project to rehabilitate water infrastructure in Georgia within 455 days.

Documents

1
PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Dalton Utilities
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → Dalton Utilities
Office AddressN/A
Contacts
Rafael Romero

Full Description

Show more
Construct the Eastern Water Distribution System Reliability Project as shown in the drawings and specifications. The project will include the construction of multiple roads: Tibbs Bridge Rd, Headrick Circle, N. Woodland Dr, Keeter Rd, Riverside Dr, North Dr, Timberlake Dr, Sane Rd, Cavender Rd, Riverbend Rd, Bettis Rd, Gordon Dr, Shirley Dr, Matha Sue Dr, Leon Cr, Conasauga Way, Deal Dr, Greenson Bend, Jackson Kinnamon, Ridley Rd, Callie Jones, Barney Pierce, Thorton Rd, Adam Rd, Stafford Rd, Keswick Dr, Pannel Dr, Cochran Dr, Hwy 225, Hwy 52 Alt, Crestview Dr, Vann Cr, & Mary Sue. Rehab will consist of replacing existing pipe infrastructure, valves, fire hydrants, installing new services, connecting existing mains, driveway crossing (rock/concrete), etc.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and significant upgrades to the existing Morgans Branch Pumping Station in Belmont, North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project is estimated at 16,690,000 dollars and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The work must be substantially complete within 560 calendar days from the commencement date. The contract is administered using EJCDC standard forms and was designed by Willis Engineers, who will serve as the Owner's representative for inspections and quality assurance. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on M/WBE compliance through the submission of Good Faith Efforts forms and Table A. Bidders must provide performance and payment bonds, as well as proof of insurance from providers with an A.M. Best rating of A-VII or better. Key technical requirements include adherence to OSHA fall protection, NEMA standards for motors, and AWS D1.2 for aluminum welding. Payment is processed via applications for payment and becomes due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
WG Construction is seeking MBE/WBE subcontractors for the Jefferson Street Pump Station Replacement project for the City of Winchester, Virginia. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, paving, the relocation of an existing fuel tank, and the demolition of existing facilities. Subcontracting opportunities are specifically available for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Interested parties should contact Trish Mousavizadegan at [email hidden] or [phone hidden] for plans and specifications. The project is governed by solicitation ITB-2026141, with bids due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract requires completion within 610 calendar days from the Notice to Proceed and is subject to Davis-Bacon wage determinations, American Iron and Steel requirements, and U.S. Treasury 2 CFR 200 for federally funded procurements. Award will be granted to the lowest responsive and responsible bidder. Key requirements include the provision of performance and payment bonds equal to 100 percent of the contract amount, adherence to OSHA and ADA standards, and certification of EEO compliance and non-debarment status.
WG Construction Co., Inc.

POSTED

about 3 hours ago

DEADLINE

in 3 days
View Details

More opportunities from Georgia → Dalton Utilities

Same awarding agency

NAICS: 237130
New
SLED
2027 Dalton Telecom Conduit Project
Solicitation # PE-75553-NONST-2027-000000068
The 2027 Dalton Telecom Conduit Project, managed by Dalton Utilities in Georgia, involves the installation of a new telecommunications pathway across several roads, including Industrial South Rd, Callahan Rd, Focus Dr, Brookhollow Ind Blvd, Kraft Dr, South Dalton Bypass, Howell Dr, Enterprise Dr, and Boring Dr. The scope of work requires the contractor to furnish all labor, materials, and equipment to install 11,550 linear feet of two 4-inch underground conduits via directional drilling, 190 linear feet of 12-inch HDPE case bore, and 24 telecommunications vaults (four 60x48 and twenty 48x48). The contractor is responsible for all excavation, vault installation, and site restoration, ensuring that post-construction conditions are equal to or better than pre-construction conditions, including erosion and pollution control. The contract is governed by the laws of the State of Georgia and will be awarded to the lowest responsible and responsive bidder, though the owner reserves the right to select the best overall value based on price, schedule, and experience. Performance is required within 90 calendar days of the Notice to Proceed, with bidders expected to mobilize within three weeks of the bid opening. Financial requirements include a 10% bid bond and 100% performance and payment bonds. Payment terms specify a 30-day window following invoice approval, with a maximum retainage of 10% on progress payments. Final acceptance is contingent upon a final inspection and the submission of precise as-built drawings meeting specific GPS and elevation accuracy standards.
Power and Communication Line and Related Structures Construction

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS