Eastman 2025 LMIG/LRA

Active
PE-64555-NONST-2027-000000018State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Eastman, Georgia is soliciting bids for the resurfacing of approximately 0.85 miles of roadway, involving the application of about 1,139 tons of 9.5mm Superpave asphalt, 339 tons of OGI leveling material, and 85 tons of deep patching to restore the pavement surface. The project also includes approximately 1.70 linear miles of high-build striping and all necessary appurtenances to complete the work to specification. All materials and work must meet required standards for durability and safety, ensuring a long-lasting and properly marked final product. The solicitation, identified by number PE-64555-NONST-2027-000000018, was posted on July 21, 2026, with proposals due by 4:00 PM on August 25, 2026. The procurement is classified under SLED government type, and inquiries should be directed to JamieLynn Harris at jamielynn@hofstadter.com. The work is to be performed within the city limits of Eastman, Georgia.

General Info

Eastman, GA seeks bids for 0.85-mile road resurfacing with asphalt, striping, and appurtenances by August 25, 2026.

Agency

Georgia → City of EastmanView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(1)

2_ AD_BID Eastman 2025 LMIG LRA.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Eastman
Contacts1 person available
OfficeN/A
Organization / Agency
Georgia → City of Eastman
View Agency Profile
Office AddressN/A
Contacts
JamieLynn Harris

Full Description

Show more
The construction of ± 0.85 miles of asphalt resurfacing, including ± 1,139 tons of 9.5mm Superpave, ± 339 tons of OGI leveling, 85 tons of deep patching, ± 1.70 LM of high build striping, and all appurtenances necessary for a complete job.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry Redevelopment Project will overhaul the entry and exit drives along 19th Ave W, replacing deteriorated pavement with new surfaces and upgrading stormwater infrastructure to divert runoff from combined sewer lines to dedicated storm lines, with water quality treatment integrated where qualifying pavement is replaced. The remaining slab of the Downie Building (C-14) from Phase 1 will be demolished and replaced with a mix of additional parking and green space designed as a pollinator habitat, potentially incorporating a stormwater treatment facility. A new irrigation system will support the landscaping, including a redesigned median in the entry drive, and electric vehicle charging stations will be installed in the new parking area to support sustainable transportation. The project will enhance non-motorized transportation by adding a protected two-way bike lane connecting the terminal to the West Wall bike path and improving pedestrian access to the intersection at 21st Ave W and W Emerson Pl, as well as the nearby King County Metro bus stop. Lighting will be upgraded throughout the new parking zone and connecting pathways, and comprehensive wayfinding systems will be implemented to guide pedestrians and cyclists. These improvements aim to increase accessibility, safety, and environmental resilience while aligning with sustainable urban design goals, all under the oversight of the Port of Seattle’s Waterfront Project Management team.
Waterfront Project Management

POSTED

about 4 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
School Street Sidewalk ImporovementsThe Town of North Brookfield is soliciting bids for the School Street Sidewalk Improvements project, which includes the removal and replacement of approximately 185 linear feet of existing concrete sidewalk, installation of a modular block wall, concrete stairs, precast pavers, pavement milling and paving, along with associated seeding and planting. The work is to be completed in accordance with plans and specifications developed by Berkshire Design Group, and all detailed documentation is accessible through biddocs.com. Bids must be submitted by the deadline of August 5, 2026, at 7:00 PM, with the solicitation opened under the number BD-26-1648-BOARD-BOARD-131572 and originally posted on July 22, 2026. The project is being managed by the Board of Selectmen of North Brookfield, Massachusetts, with the official point of contact being Ashley Barre, Purchaser, reachable at 413-582-7000. The place of performance is located at North Main Street in North Brookfield, MA, 01535, and all proposals must comply with the requirements outlined in the official bid documents. The contract is categorized under a SLED agency type, indicating it is a state, local, or educational entity procurement, though no specific small business set-aside designation is provided. Interested parties may access the full solicitation and submission portal via the Commbuys website.
BOARD - Board of Selectmen

POSTED

about 6 hours ago

DEADLINE

in 14 days
View Details