Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on November 14, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Eastrail Mountains to Sound Greenway Regional Trails Connection

Closed
RFQ #24116State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves comprehensive engineering design work for the Eastrail Mountains to Sound Greenway Regional Trails Connection project in Bellevue, Washington. The consultant will develop detailed plans, specifications, and estimates at various stages, including 30%, 60%, 90%, and 100%, culminating in bid-ready documents. The project aims to enhance connectivity and safety by constructing a multi-use path along the west side of 118th Ave SE between I-90 and SE 32nd St, along with a new at-grade walkway on the south side of SE 32nd St between 118th Ave SE and Eastrail. Key features include the installation of a multi-use pathway with retaining walls, planter strips, irrigation, and associated infrastructure such as curb, gutter, and storm drainage systems. Additional improvements encompass resurfacing and restriping existing roadways, installing pedestrian crossings with Rectangular Rapid Flashing Beacons, curb ramps, and crosswalks, as well as site preparation, erosion control, utility relocations, landscaping, lighting, signage, and traffic management measures. The project scope also covers environmentally sensitive area mitigation, stormwater management, and other related enhancements to ensure safety, accessibility, and environmental compliance. The contract, valued between two and five million dollars, is issued by the City of Bellevue under the Washington State Department of Enterprise Services, with a response deadline of December 4, 2024. It is part of a broader effort to improve regional trail connectivity and transportation infrastructure, supporting sustainable mobility and community safety.

General Info

Place of Performance

WA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Bellevue
ContactsNo contacts available
OfficeN/A
Organization / AgencyWashington → City of Bellevue
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The work to be performed by the Consultant consists of preparing preliminary engineering design, and developing 30%, 60%, 90%, 100%, and bid ready design plans, specifications, and estimates (PS&E) for the project. The proposed improvements include the construction of a multi-use path on the west side of 118th Ave SE between I-90 and SE 32nd St, and providing a new at-grade walkway on the south side of SE 32nd St between 118th Ave SE and Eastrail. The major features of the project are as follows: •Construct a multi-use pathway along with associated retaining wall, planter strip with irrigation, curb, and gutter •Resurface and restripe all roadway within the project limits •Install a new RRFB crossing at the intersection of 118th Ave SE and SE 32nd St •Construct new curb ramps and marked crosswalk at the south leg of the intersection of 118th Ave SE and SE 32nd St •Construct a new at-grade walkway on the southern shoulder of SE 32nd St •Other improvements and work associated with the project include, but are not limited to, site preparation, erosion and sediment control, storm drainage system, flow control and water quality facilities (if needed), environmentally sensitive area impact mitigation, franchise utilities relocation (if needed), irrigation, landscaping, channelization, retaining walls, illumination, intelligent transportation systems, signing, traffic control, and other mitigation as required.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS