Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

ECLWRF Fence Replacement Project

Open
RFB-JM-0152State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The ECLWRF Fence Replacement Project, managed by the West Basin Municipal Water District, involves replacing 2,030 linear feet of perimeter fencing at the Edward C. Little Water Recycling Facility in El Segundo, California. The scope includes installing new tubular fencing, adding a 240-linear-foot extension to an existing CMU wall to achieve a uniform 8-foot height, and repairing and repainting existing gates and fencing. The project also requires the removal and replacement of privacy screening. All work must be completed within 150 calendar days from the Notice to Proceed and is subject to a Project Labor Agreement between West Basin and the Building and Construction Trades Council of Los Angeles/Orange Counties. The contract will be awarded to the lowest bidder based on an evaluation of price, bidder qualifications, and financial ability. Bidders must submit a Bid Form, Bid Bond, Non-Collusion Affidavit, and a Small, Local and Veteran Owned Business Enterprise Program Compliance Form. Technical requirements include strict adherence to West Basin Municipal Water District Standard Specifications (2021), the use of 316 stainless steel for buried bolts and nuts, and specific purple-coded marking for recycled water identification. The project is a public work requiring compliance with state prevailing wage rates and the Build America, Buy America Act. No specific set-aside status is designated for this solicitation.

General Info

West Basin will replace and repair perimeter fencing at the ECLWRF facility.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

6
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstcontract-document
High
PDF, Low prioritycertification
Low
PDF, Low priorityvendor-information-request
Low

Read all 6 documents

Due in 28 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 28 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 6 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering
Contacts2 people available
OfficeCarson, CA, 90746, USA

Interested Companies (6)

BidamericaSheridan, WY
Ferreira ConstructionRancho Cucamonga, CA
JitneyCorona, CA

See All 6 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The Edward C. Little Water Recycling Facility (ECLWRF) is located at the 1935 S. Hughes Way in the City of El Segundo, California. The purpose of this project is to replace the existing 2,030 linear feet perimeter fence surrounding ECLWRF with new tubular fencing, and to add an extension of tubular fence to 240 linear feet of CMU Wall to reach a 8-feet uniform height. The project also includes the repair of gates and pedestrian gates. The project needs to be completed within 150 calendar days from Notice to Proceed. This project is subject to the terms of a Project Labor Agreement (PLA) between West Basin and the Building and Construction Trades Council of Los Angeles/Orange Counties.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
Federal
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additionally, the project includes the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, and the installation of platforms and access improvements. Civil works such as excavation, trenching, and surveying of key points around the reactors are also required. The estimated contract value ranges between 18.5 million and 19.5 million dollars, with a bid opening date of December 2, 2026. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Ranger Pipelines Incorporated is soliciting quotes from certified DBE, DVBE, and SBE subcontractors for specialized services including coating, concrete rehabilitation, electrical work, and welding.
Ranger Pipelines Incorporated

POSTED

about 4 hours ago

DEADLINE

in 7 days
View Details

More opportunities from California → Engineering

Same awarding agency

NAICS: 238220
New
SLED
WRF HVAC Unit Replacement Project
Solicitation # WT26-06
The Ironhouse Sanitary District is soliciting bids for the WRF HVAC Unit Replacement Project (Project No. ISD-WT26-06) located at the WRF Building in Oakley, California. The scope of work involves the installation of a 15-ton Carrier condensing unit and fan coil unit, which includes drilling for copper line sets, running dual circuited line sets, reinstalling electrical and lights in the MCC room, and integrating the system with existing ductwork, drain lines, and isolators. The contractor is also responsible for the disposal of used equipment in accordance with EPA regulations. This solicitation is conducted under the California Uniform Public Construction Cost Accounting Act (CUPCCAA) and is subject to prevailing wage requirements. Qualified contractors must be DIR registered and possess a Class C20 license. Mandatory requirements include a liability insurance policy with at least $1 million per occurrence and $3 million aggregate, as well as current Workers Compensation insurance. Bidders must submit a bid bond for 10% of the total bid and provide a non-collusion declaration, a drug-free workplace certification, and a debarment certification. Contractors not currently on the District's Informal CUPCCAA Contractors List must submit a Contractor Registration Form. There is no set-aside status for this solicitation. The response deadline is December 23, 2026.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

6 days ago

DEADLINE

in 28 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS