This Solicitation opportunity from Texas was posted on January 1, 1970. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Ector County — CSJ 0572-01-076 — May 2026 Letting — State-Let Construction
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to a state-let construction project in Ector County, Texas, under solicitation number 0572-01-076, with a letting date in May 2026, managed by the Texas Department of Transportation. Work involves erosion control log installation along the right-of-way of SH 302, including secure anchoring with sandbags, proper placement per engineering directives, and implementation of runoff prevention measures, with incidental compost cradle material not separately compensated. The scope also includes pavement work such as prime coat application, fog seal, Superpave asphalt mixtures (PG 70-22), reflective pavement markings, and flexible base construction, all governed by TxDOT Standard Specifications and the TPDS Construction General Permit TXR150000. Performance must occur at project locations determined by the Engineer, with inspection and acceptance based on laboratory and field testing for material compliance, including gradation, asphalt viscosity, and dynamic shear rheometer results. The contract requires adherence to the Davis-Bacon Act with prevailing wage reporting via WH-347 forms, Buy America provisions modified by special provisions, and full subcontract flow-down of all requirements including security, nondiscrimination, and DBE participation as per 49 CFR Part 26. A minimum of 30% self-performance by the prime contractor is mandated, with exemptions allowed for design-build contracts. Bid submissions must follow TxDOT FORM 234-B with no modifications, and pricing is listed only in written form without numeric values, rendering the total contract value undetermined. Security requirements impose administrative, physical, and technical safeguards for TxDOT data, with mandatory reporting of breaches. The period of performance begins within 60 days of authorization, with a possible 60-day delayed start, and working day charges are scheduled to commence on August 11, 2026. All records, including certified payrolls and subcontract documentation, must be retained for three years post-final payment, with federal and state representatives retaining audit and inspection rights. The project is federally funded, requiring compliance with the Cargo Preference Act and Prompt Payment Act, though no formal contract type, FOB terms, payment office details, COR/COTR contacts, or specific funding codes are provided in the documentation.
General Info
Place of Performance
Ector, TX, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from Texas Department of Transportation
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
