Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Ed Z'berg Sugar Pine Point State Park Accessibility Improvements

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California Parks and Recreation, Department of

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

12799 Sugar Pine ADA Accessibility Improvements Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Joel BonillaEngineering Geologist

Full Description

Show more
The project proposes to complete improvements in the General Creek Campground and Visitor Center Point State Park to provide accessible recreation accessibility guidelines and associated legal mandates. Work will: At the General Creek Campground Kiosk Stripe and sign existing asphalt to create one (1) ADA-compliant van parking stall; Complete a path of travel to connect the new parking spot to the existing entry kiosk; Install two (2) wheel stops and remove one (1) large boulder; Excavate up to 4-in. to remove an existing asphalt walkway between the parking lot and kiosk and construct a timber-edged, ADA-compliant asphalt walkway, with the walkway edge 4-in. lower where it meets the campground road, to tie into the existing kiosk landing; On both the north and south ends of the kiosk, excavate up to 6-in to remove existing non-compliant asphalt crosswalks and transitions and install ADA-compliant asphalt crosswalks and transitions; Remove the existing concrete kiosk entry pad and pour a new ADA-compliant concrete entry pad (drain Inlet to remain); and Install a 5-ft x 20-ft, ADA-compliant asphalt pad in front of the wood sheds. At the General Creek Shower Buildings Remove an existing ADA parking stall and install one (1) van accessible ADA-compliant parking stall; Stripe and sign the new van-accessible ADA-compliant parking stall and install one (1) wheel stop; Remove an existing non-compliant asphalt walkway, from the parking to the shower building, and install a timber-edged ADA-compliant asphalt walkway in its place; Remove an existing non-compliant asphalt walkway from the shower building to the ADA Trail, and install a timber edged ADA-compliant asphalt walkway in its place; and Remove an existing non-compliant concrete path of travel around both shower buildings and pour a new ADA-compliant concrete path of travel around both shower buildings In the Visitor Center/Museum Day Use Parking Area Remove four (4) existing non-compliant parking stalls and construct four (4) new Single Van ADA-compliant asphalt parking stalls; and Install four (4) wheel stops and stripe and sign the new 4 asphalt parking stalls.

Similar Contracts

Same NAICS industry code