Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on January 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Edison High School Central Plant Cooling Tower Replacement and EMS Upgrade

Awarded
26-36State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
WOJC - Multi-Building Plumbing Leak Repair Project
Solicitation # WOJC – Multi-Building Plumbing Leak Repair Project
Education and Training Resources is seeking quotes for a subcontracting opportunity to perform multi-building plumbing leak repairs at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work includes replacing leaking shower P-trap drain pipes in Harris Hall Dormitory (Rooms 123 and 213), repairing a cracked drain pipe in the pipe chase of Room 216, and replacing heat pipe sections in the Administration Building and King Hall. All work must comply with the Massachusetts State Plumbing Code, International Plumbing Code, and all applicable federal, state, and local regulations. Contractors are responsible for providing new, commercial-quality materials suitable for hydronic heating service and must ensure all joints are leak-tight. Bids are due by October 30, 2026, and must include a detailed cost breakdown of labor and materials, a proposed service schedule, and a quote valid for at least 60 days. Award selection is not based solely on the lowest price; ETR will evaluate qualifications, administrative compliance, and cost. Required submission documents include a SAM.gov UEI number, active registration, Massachusetts business licenses, a signed W-9, a Vendor Acknowledgement Form, and certificates of insurance for Liability, Workers Compensation, Automobile, and Builders Risk. The project is subject to several federal regulations, including the Davis-Bacon Act and the Service Contract Act, requiring the submission of weekly certified payroll reports. Depending on the project value, payment and performance bonds may be required for contracts exceeding 35,000 dollars. Additionally, contractors must adhere to OSHA safety standards, including lock-out/tag-out procedures, and comply with ETR's Affirmative Action Plan. Invoices must include a valid Purchase Order number and be submitted to Accounts Payable, with payment contingent upon proof of receipt of goods or services.
Westover Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in 1 day
NAICS: 238220
New
CBP6585 Bldg. 22 HVAC Replacement
Solicitation # CBP6585
Management and Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontract to replace the HVAC equipment serving Building 22 at the San Diego Job Corps Center in Imperial Beach, California. The scope of work includes the removal of existing systems and the installation of a new 5-ton condenser, 5-ton evaporator coil, furnace, condenser pad, gas flex, shut-off valve, pigtail, fused disconnect, electrical whip, and condensate drain. The contractor is responsible for providing all labor, materials, and equipment, and must deliver a fully operational system along with two sets of operation and maintenance manuals and all applicable manufacturer and installer warranties. Final acceptance is contingent upon inspection and approval by the San Diego Job Corps Center Facilities and Maintenance Department. This small business set-aside opportunity under NAICS 238220 has an estimated price range of 0 to 25,000 dollars. Bids are due by October 28, 2026, and must include a detailed cost breakout, proof of insurance, three references, and a mandatory physical site visit. If a bid is equal to or greater than 25,000 dollars, a bid bond of 20 percent is required, and the awarded contractor must provide performance and payment bonds equal to 100 percent of the contract price from a surety with at least an A- rating. Compliance with the Davis-Bacon Act, OSHA safety standards, and various Federal Acquisition Regulations is mandatory, including the submission of weekly certified payroll and SF 1413 forms. Award will be based on overall best value as determined by MTC.
San Diego Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in about 15 hours
NAICS: 238220
New
MJCC EXHAUST FANS BLD. 1429
Solicitation # mjcc-exhaust-fans-bld-1429
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes from qualified HVAC and mechanical contractors to restore the exhaust fan and louver systems in Building 1429 located in Kentucky. The project scope involves inspecting, repairing, and replacing various components to ensure safe and reliable operation, specifically addressing failures in exhaust fans 1 through 8. Key tasks include replacing failed louver actuators, control transformer fuses, and contactor coils, as well as installing missing motors, blades, and guards for exhaust fan 5. All work must adhere to applicable building codes, manufacturer requirements, and generally accepted HVAC practices. The contract will be awarded to the responsible offeror who provides a technically acceptable quote at the lowest price. Proposals must include detailed line-item pricing for each fan and system-wide components, equipment specifications, and evidence of Kentucky state registration and licensing. Contractors must comply with Davis-Bacon Act labor standards, providing weekly certified payroll with every invoice. Additional requirements include maintaining a 90-day bid guarantee, providing proof of insurance, and demonstrating the ability to secure performance and payment bonding for contracts exceeding 100,000 dollars. Final acceptance is contingent upon a successful walk-through, a completed punch list, and the delivery of all operating and maintenance manuals.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 8 hours ago

DEADLINE

in 1 day
NAICS: 238220
New
Centennial Dry Sprinkler System & Compressor Replacement Services
Solicitation # centennial-dry-sprinkler-system-compressor-replacement-services
Management & Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide dry-type sprinkler system and compressor replacement services at the Centennial Job Corps Center in Nampa, Idaho. The project focuses on eliminating severe piping leaks and replacing failing infrastructure in Building CM (Men's Dormitory), Building CW (Women's Dormitory), and Building D (Recreation). The scope of work includes the demolition and disposal of existing distribution piping and air compressors, the installation of a new code-approved piping network and properly sized compressor, and comprehensive operational and leak testing. All work must adhere to NFPA 25 (2023 Edition) and other local, state, and national codes, with a required performance period of 30 consecutive business days following the Notice to Proceed. Bids are due by December 1, 2026, and must be based on an overall best-value evaluation. Mandatory requirements for consideration include a physical site visit, a detailed cost breakout, and proof of insurance. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from an A-rated surety. This solicitation is set aside for HUBZone, Woman-owned, and Service-Disabled Veteran-owned small businesses. Contractors must comply with Davis-Bacon Act prevailing wage rates for building construction in Idaho and submit weekly certified payroll reports to receive payment. Additional compliance requirements include the submission of an SF 1413 form and adherence to FAR standards regarding debarment disclosure and safety.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 238220
New
Dorm Hot Water Tank Replacement – Glenmont Job Corps Center – S26-006
Solicitation # S26-006
Adams and Associates, Inc. is seeking qualified mechanical and plumbing contractors for solicitation S26-006 to replace domestic hot water storage tanks and associated equipment at the Glenmont Job Corps Center in Glenmont, New York. This subcontracting opportunity involves the removal and disposal of four 505-gallon tanks and the installation of four new 500-gallon insulated storage tanks, four heat exchangers, and one bronze Bell and Gossett circulator pump in the North Dormitory. The scope of work encompasses all labor, materials, rigging, piping modifications using ProPress materials, electrical reconnections, and insulation. To maintain facility operations, the contractor must provide temporary hot water arrangements and adhere to strict site security and safety protocols, including a prohibition on fraternization with students and personnel. The project is estimated to take between two and a half to three weeks to complete. Proposals are due by November 9, 2026, at 4:00 PM ET, following a site walkthrough on October 29, 2026. Award decisions will be based on a weighted evaluation of price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent), with the lowest price not guaranteeing an award. Selected contractors must comply with New York State statutory insurance requirements and Davis-Bacon prevailing wage determinations. Payment terms are Net 30 days upon completion and receipt of invoice. Required submission documents include a current W-9, vendor questionnaire with UEI and NAICS code, and applicable New York State licenses and certifications.
Adams and Associates, Inc.

POSTED

about 8 hours ago

DEADLINE

in 13 days
NAICS: 238220
New
MJCC HVAC BLD. 1403-04 B HALL
Solicitation # mjcc-hvac-bld-1403-04-b-hall
Insights Training Group LLC, on behalf of the Muhlenberg Job Corps Center in Kentucky, is soliciting fixed-price quotes for an HVAC project at Building 1403-04 B Hall. The scope of work requires the contractor to furnish and install two 4-ton twinned split systems featuring Trane 17 SEER condensing units, 95% AFUE high-efficiency gas furnaces, and matching indoor evaporator coils using R-454B refrigerant. Additional requirements include the installation of new refrigerant line sets, exterior line hide, a Honeywell Pro 8000 programmable thermostat with a remote sensor, and necessary condensate drain piping and pumps. The project must be completed within 45 days of award, with all work adhering to manufacturer specifications, local codes, and OSHA and EPA regulations. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Award will be granted to the responsible offeror whose quote is technically acceptable and represents the lowest price. To be considered, bidders must provide evidence of Kentucky state registration and licensing, proof of ability to secure performance and payment bonding, a completed New Vendor Profile, a W-9, and a minimum 90-day bid guarantee. All work must comply with Davis-Bacon Act labor standards, requiring the submission of weekly certified payroll and a signed Statement of Compliance with every invoice. Quotes are due by October 30, 2026, at 5:00 PM via email to [email hidden].
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 8 hours ago

DEADLINE

in 1 day
NAICS: 238220
New
Roswell JCC – Male Dormitory Bldg. Water Source Heat Pump Replacement (20 units)
Solicitation # roswell-jcc-male-dormitory-bldg-water-source-heat-pump-replacement-20-units
The Career Systems Development Corporation is soliciting proposals for the total replacement of twenty ceiling-mounted water source heat pumps at the Roswell Job Corps Center Male Dormitory Building 558 in New Mexico. The scope of work involves the removal and off-site disposal of twenty failed units and the installation of new Bosch 1-ton units or an equivalent model. The installation must include all necessary ducting, electrical work, thermostats, wiring, flexible hoses, and pressure valves. Additionally, the contractor must install smoke dampers with fusible links in all vents leading into the plenum and ensure all materials used in the plenum are plenum rated. All work must comply with NFPA 101, NFPA 70, and all applicable plumbing, mechanical, and building codes. This solicitation is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone concerns. Proposals are due by November 7, 2026, and must include a safe work process, detailed costs for materials, labor, and bonding, the total project cost, equipment cut sheets, warranty information, and requested payment terms. The project is subject to the Davis Bacon Act Wage Determination NM20260014, requiring the submission of weekly certified payroll reports for invoice approval. Furthermore, any proposal exceeding 100,000 dollars will require payment and performance bonding for 100 percent of the contract value upon award.
Career Systems Development Corporation

POSTED

about 8 hours ago

DEADLINE

in 10 days
NAICS: 238220
New
WOJC – Buried Domestic Hot Water (DHW) Pipe Repair
Solicitation # wojc-buried-domestic-hot-water-dhw-pipe-repair-0
Education & Training Resources is seeking quotes for a subcontracting opportunity to repair buried domestic hot water piping at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work involves the excavation, removal, and repair of compromised piping up to 4 inches in diameter at two specific locations: behind Singletary Hall and on the east side of Harris Hall. The selected contractor must provide all labor, materials, and equipment, ensuring work meets industry standards and includes a one-year equipment and workmanship warranty. Final project closeout requires a signed punch list and all applicable warranties. Bids are due by 4:00 PM on November 6, 2026, and must be submitted to Garrett Owens via email or physical delivery. To be considered, offerors must provide a completed bid sheet with a detailed cost breakdown, a proposed service schedule, Massachusetts licensing, and a comprehensive vendor packet including a W-9, SAM.gov UEI number, and certificates of insurance. This is a small business set-aside opportunity requiring compliance with the Davis-Bacon Act or Service Contract Act, including the submission of weekly certified payroll reports. Depending on the project value, payment and performance bonds may be required for contracts exceeding 35,000 dollars. Award selection is at the sole discretion of ETR and is not based solely on the lowest bid.
Westover Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The Fresno Unified School District awarded contract 26-36 to Lawson Mechanical Contractors, LLC for the Edison High School Central Plant Cooling Tower Replacement and EMS Upgrade. The project scope involves replacing two water towers and condenser pumps, adding drives and sweep filtration, and upgrading the central plant energy management system. The contract was awarded based on a lowest responsive and responsible bidder model, with the winning bid totaling 863,575 dollars, which includes a 30,000 dollar allowance for unforeseen underground utilities. The project is scheduled for completion within 103 to 109 calendar days, with an anticipated start date of April 20, 2026. Prime contractors were required to hold a valid Class C-20 license and undergo prequalification. The contract mandates a 3 percent participation goal for Disabled Veteran Business Enterprises and requires strict adherence to California building codes, OSHA standards, and Division of the State Architect structural testing and inspection requirements. Key deliverables include shop drawings, as-built documentation, and commissioning results to ensure a fully operational system.

General Info

Lawson Mechanical will replace Edison High cooling towers and EMS for 863,575 dollars.

Contract Value

$0

Place of Performance

CA, USA

Set-Aside

NONE

Award Issued Date

Documents

15

Addendum No. 1 for Bid No. 26-36 Edison High School Cooling Tower Replacement

PDF, High priority: read this firstamendment
High

Addendum No. 2 for Bid No. 26-36 Edison High School Cooling Tower Replacement

PDF, High priority: read this firstamendment
High

Addendum No. 3 for Bid No. 26-36 Edison High School Cooling Tower Replacement

PDF, High priority: read this firstamendment
High

Bid No. 26-36 Edison High School Central Plant Cooling Tower Replacement and EMS Upgrade

PDF, High priority: read this firstifb
High

Bid No. 26-36 Edison High School Cooling Tower Replacement Notice to Bidders

PDF, High priority: read this firstnotice-to-bidders
High

Bid No. 26-36 Subcontractors List - Edison High School Cooling Tower Replacement

PDF, High priority: read this firstsubcontractors-list
High

Bid No. 26-36 Subcontractors List - Edison High School Cooling Tower Replacement

PDF, High priority: read this firstsubcontractors-list
High

Bid No. 26-36 Subcontractors List - Edison High School Cooling Tower Replacement

PDF, High priority: read this firstsubcontractors-list
High

Bid No. 26-36 Subcontractors List - Edison High School Cooling Tower Replacement

PDF, High priority: read this firstsubcontractors-list
High

DSA 103-22 Structural Tests and Special Inspections for Edison High School

PDF, High priority: read this firstspecial-inspection-list
High

Fresno Unified School District Cooling Tower Replacement Technical Specifications

PDF, High priority: read this firstspecifications
High

26-36 Drawings

PDF, Low priorityother
Low

Bid 26-36 Edison High School Cooling Tower Replacement Job Walk Sign-In Sheets

PDF, Low priorityjob-walk-sign-in-sheet
Low

Bid No. 26-36 Edison High School Central Plant Cooling Tower Replacement Bidders List

PDF, Low prioritybidders-list
Low

Bid Tabulation for Bid No. 26-36 Edison High School Cooling Tower Replacement

PDF, Low prioritybid-tabulation
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Fresno Unified School District
Contacts1 person available
OfficeCA, USA
Office AddressCA, USA
Contacts

Full Description

Show more
Return to Bid List Bid NUMBER 26-36 TITLE Edison High School Central Plant Cooling Tower Replacement and EMS Upgrade PROCESS One Step Unsealing BASE CURRENCY USD STATUS Awarded DESCRIPTION BID DOCUMENTS BIDDERS RESULTS CALENDAR
You must log in to register for Bid Events and to view Bid Question and Response information.
NUMBER 26-36 TITLE Edison High School Central Plant Cooling Tower Replacement and EMS Upgrade AVAILABLE DATE 1/30/2026 10:00 AM CLARIFICATION DEADLINE 2/18/2026 5:00 PM DUE DATE 3/3/2026 2:00 PM CONTACT INFORMATION Please use the Clarification tab to submit Bid questions. Otherwise please call +1 (555) 000-0000 for Technical Support. BID TYPE Formal Bid BILL TO Maintenance, 4600 N. Brawley Ave., Fresno, CA 93722 US SHIP TO Maintenance, 4600 N. Brawley Ave., Fresno, CA 93722 US DESCRIPTION
ONLINE BID OPENING: PRELIMINARY BID RESULTS ARE AVAILABLE ON THE RESULTS TAB
As soon as the buyer un-seals all bids, preliminary results are available.
After comprehensive review, the final bid results will be sent out to all bidders.
Optionally, you may attend on Teams using the information provided below.
 
________________________________________________________________________________
Microsoft Teams meeting 
Join: https://teams.microsoft.com/meet/22236642462185?p=HyNJEF30Hydi0001gW
Meeting ID: 222 366 424 621 85 
Passcode: 3md3tF6J 
Need help? | System reference
Dial in by phone 
+1 (555) 000-0000,,159867980# United States, Fresno 
Find a local number
Phone conference ID: 159 867 980#
________________________________________________________________________________
FRESNO UNIFIED SCHOOL DISTRICT 00 11 00 NOTICE TO BIDDERS
NOTICE INVITING BIDS PURSUANT TO PUBLIC CONTRACT CODE 22000, ET SEQ. (THE UNIFORM PUBLIC CONSTRUCTION COST ACCOUNTING ACT)
Notice is hereby given that the Fresno Unified School DISTRICT (“DISTRICT”) will receive sealed bids for Bid No. 26-36, Edison High School Central Plant Cooling Tower Replacement and EMS Upgrade, to replace two water towers, condenser pumps, add drives, add sweep filtration, and upgrade the central plant energy management system.
DISTRICT hereby notifies all bidders that they will affirmatively ensure that in any Contract entered into pursuant to this advertisement, disabled veteran business enterprises (DVBE) will be afforded full opportunity to submit proposals in response to this invitation and will not be discriminated against on the grounds of race, color, creed, sex or national origin in consideration for award. The DVBE goal for the project is as follows:  three percent (3%) of the dollar amount of the Contract.
Prime Contractor must have a valid Class “C-20” Contractor’s License prior to bidding.
The time allowed for completion for the project shall be 109 Calendar days.
The Architect/Engineers’ estimate for this project is around $900,000 (estimate as of November 2025).
A MANDATORY pre-bid conference has been scheduled at 10:00 AM, February 6, 2026 in front of the Administration Office at Edison High School, 540 E. Cesar Chavez Blvd, Fresno CA 93706.  Contractors bidding as a Prime Contractor for the project must attend in order for their bid to be “responsive”.  Immediately following the pre-bid conference will be a mandatory job-walk of the site(s). All visitors must check-in at the school office using our visitor management system which requires ID verification via government-issued identification card or driver’s license to receive a badge and enter the campus. Bidders may arrive earlier than the scheduled time to obtain their badge.
This project is subject to prequalification. Prequalification applications are to be submitted through Quality Bidders at https://www.qualitybidders.com/ no later than  11:59 PM, February 13, 2026.
Sealed Bids and the DVBE Declaration must be received prior to 2:00 P.M. on March 3, 2026  on Procureware, the DISTRICT’s online bidding portal, after which time the bids will be opened and bid results posted.
Bids shall be accompanied by a certified check, cashier’s check, or a bidder’s bond in an amount not less than ten percent (10%) of total bids made payable to Fresno Unified. 
Bid documents may be downloaded at no charge from the district’s bidding portal, Procureware, at: https://fresnousdpurchasing.procureware.com/home.  All bids must be submitted through the portal. Refer questions to Panhia Moua contact@example.gov.
The District reserves the right to accept or reject any or all bids, or any combination of bids and to waive any irregularities or informalities which may be legally waived.
Published: January 30, 2026

BID EVENTS (3 records) TITLE ATTENDANCE REQUIRED TO BID DESCRIPTION LOCATION REGISTRATION CUTOFF DATE EVENT START DATE EVENT END DATE CANCELLED ATTACHED FILE FILE DESCRIPTION MANDATORY pre-bid conference Yes Contractors bidding as a Prime Contractor for the project must attend in order for their bid to be “responsive”. Immediately following the pre-bid conference will be a mandatory job-walk of the site. In front of the Administration Office at Edison High School, 540 E. Cesar Chavez Blvd, Fresno CA 93706 2/6/2026 10:00 AM 2/6/2026 11:00 AM No Prequal Due Date No Contractors submitting bids to perform as both Prime Contractor/General Contractor or Electrical, Mechanical, and Plumbing Subcontractor must be prequalified prior to bidding on the project. Prequal applications are available through https://www.qualitybidders.com/ 2/13/2026 11:59 PM 2/13/2026 11:59 PM No Verify Prequalification No Prime Contractor/General Contractor or Electrical, Mechanical, and Plumbing Subcontractor must verify they are prequalified prior to bidding on the project. Notify Fresno Unified if your company's application has not been approved with Quality Bidders https://www.qualitybidders.com/ Contact Panhia Moua at contact@example.gov with questions. 2/18/2026 10:00 AM 2/18/2026 10:00 AM No BID CATEGORIES (1 record) CODE TITLE FULL NAME 1100-200 C-20 Warm Air Heating, Ventilating and Air-Conditioning 1000 Construction > 1100 Public Works > 1100-200 C-20 Warm Air Heating, Ventilating and Air-Conditioning

More opportunities from California → Fresno Unified School District

Same awarding agency

NAICS: 238220
New
SLED
Farber Educational Campus Buffer Tank Installation
Solicitation # 1561-00017
The Fresno Unified School District is soliciting bids for the installation of a new Wessels Co. model CBTH-1500-8F buffer tank in the chilled water return piping at the Farber Educational Campus in Fresno, California. This mechanical project includes all labor, materials, and equipment necessary for the installation, as well as the construction of a new reinforced concrete pad. The scope encompasses demolition, installation, and a comprehensive commissioning process involving functional testing, start-up execution, and the provision of record drawings. The project has an estimated value of approximately 140,000 dollars and must be completed within 90 calendar days. Eligible bidders must hold a valid Class C-20 Contractor's License and adhere to strict safety protocols, including OSHA standards and student safety fingerprinting requirements. The contract will be awarded to the lowest responsive and responsible bidder. Key compliance requirements include adherence to prevailing wage laws, registration with the Department of Industrial Relations, and a Disabled Veteran Business Enterprise participation goal of 3 percent. Required submissions include a 10 percent bid bond, with the successful contractor providing performance and payment bonds for 100 percent of the contract amount. Bids are due by November 17, 2026, via the Procureware portal.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in 21 days
View Details
NAICS: 238210
New
SLED
Intrusion Security Upgrades At Various Sites Phase 7
Solicitation # 27-16
The Fresno Unified School District is soliciting bids for project 27-16, which entails intrusion security upgrades across ten school sites, including specific work at Wilson and Cooper buildings. The scope of work involves the removal of obsolete alarm equipment and the installation of new contractor-provided infrastructure, including control panels, power supplies, zone expanders, keypads, motion detectors, door contacts, and glass break detectors. The contractor is responsible for selective demolition, electrical work, conduit and surface raceway installation, low voltage cabling, and necessary patching and painting. While the contractor provides the hardware, the district will handle the programming of the control panel and network configuration. The contract will be awarded to the lowest responsive and responsible bidder based on the price total of Base Bids per Section, with Sections A and B awarded separately. Eligible prime contractors must possess a Class C-10 California State Contractors license and be registered with the Department of Industrial Relations. Bids are due by November 17, 2026, via the Procureware online portal and must include a bid bond equal to 10 percent of the total bid. The project is subject to California prevailing wage laws and includes a Disabled Veteran Business Enterprise goal of 3 percent. Payment terms are set at 95 percent of the unpaid balance, payable within 30 days of approval. Final acceptance is contingent upon the delivery of signed certificates of inspection and the use of UL-listed materials.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

6 days ago

DEADLINE

in 21 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS