El Dorado Irrigation District Temporary Reservoir Re-Operation Water Transfer Project

Forecast
2026050621State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The El Dorado Irrigation District Temporary Reservoir Re-Operation Water Transfer Project involves the transfer of up to 5,000 acre-feet of water to buyers during the summer and fall of 2026 in Placerville, California. This transfer will be achieved by re-operating three reservoirs to release water that is not required for local customer demands during 2026 or 2027. The total available volume includes up to 620 acre-feet from Weber Reservoir and up to 4,880 acre-feet combined from Caples and Silver Lakes. To facilitate this, the district will utilize water stored in Jenkinson Lake to meet its own consumptive demands in lieu of using water from Caples and Silver Lakes. All operations will be conducted in accordance with historic flow and release schedules, adhering to all applicable rules regarding lake levels, minimum streamflow, and ramping rate requirements. The project is classified as a forecast under NAICS code 221310. A Notice of Determination has certified that a Negative Declaration was prepared under CEQA, concluding that the project will have no significant environmental effects and requires no mitigation measures.

General Info

EID to temporarily release up to 5,000 acre-feet of surplus water from three reservoirs in 2026 to external buyers.

Agency

California → El Dorado Irrigation District

Place of Performance

Placerville, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → El Dorado Irrigation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → El Dorado Irrigation District
Office AddressN/A
Contacts
Brian DeasonEnvironmental Resources Manager

Full Description

Show more
The El Dorado Irrigation District (EID) proposes to transfer water to the Buyers during summer and fall 2026. EID would make the water available through re-operations of three EID reservoirs to release water otherwise planned to be consumed by EID customers and/or stored within the EID network of reservoirs. The water proposed for transfer is not necessary to meet EID customer demands during 2026 or 2027. The reservoirs and rivers/creeks involved would all operate consistent with their historic flow and release schedules, and would meet all applicable rules and requirements, including but not limited to lake level, minimum streamflow, and ramping rate requirements. The total potential quantity available from the three reservoirs exceeds the maximum transfer volume of 5,000 AF, with up to 620 AF available from Weber Reservoir and up to 4,880 AF combined available from Caples and Silver Lakes. Under the proposed project, EID would rely on water stored in Jenkinson Lake to meet consumptive demands during the transfer period in lieu of using water from Caples and Silver lakes.

Similar Contracts

Same NAICS industry code

NAICS: 221310
New
Federal
Re-Activation of Snake River Water Pump
Solicitation # FA489727Q0004
The Department of Defense is soliciting quotes for a firm fixed price contract to re-activate the Snake River Water Transmission System Intake Pump Station and its associated 14.5-mile raw water transmission pipeline at Mountain Home Air Force Base, Idaho. This total small business set-aside project requires specialized mechanical, civil, and industrial water systems services to inspect, test, and demonstrate the operational readiness of core infrastructure, including raw water pumps, surge vessels, pneumatic charging systems, and electrical switchgear. Key performance milestones include achieving full mechanical and electrical readiness, completing penstock flushing and pipeline filling, and executing a continuous 3.5-million-gallon raw water flow demonstration to the on-base Water Treatment Plant before formally transferring operational control to the 366th Civil Engineer Squadron Operations Flight. The project must adhere to strict technical and safety standards, including UFC 3-401-01, NFPA 70, and USACE EM 385-1-1, with a requirement for the contractor to submit an Activity Hazard Analysis and Site Safety plan. While the contractor is responsible for site inspection and field verification, communication setup and central console integration are explicitly excluded from the scope. Interested parties may attend an optional site visit on November 20, 2026, with all questions due by November 23, 2026. Final responses are due by November 30, 2026. Payments will be processed electronically via the Wide Area WorkFlow system.
FA4897 366 Cons Pkp

POSTED

1 day ago

DEADLINE

in 20 days
View Details
NAICS: 221310
New
Federal
Utilities Privatization of the Water System at U.S. Army Garrison-Hawaii (USAG-HI), Island of Oahu
Solicitation # SP060026R0813
DLA Energy, in coordination with the United States Army, is soliciting proposals for the privatization of the water distribution utility system at U.S. Army Garrison-Hawaii, Island of Oahu. This initiative involves the transfer of ownership, operation, and maintenance responsibilities to a private entity for a maximum term of 50 years. The selected contractor will be responsible for all labor, materials, equipment, and capital investments necessary to ensure continuous, reliable, and safe water services. The process includes a contractor-proposed transition period, after which the system will be conveyed via a Bill of Sale, with real property interests provided as easements or rights of access. Award will be based on a best value determination, where technical capability, past performance, and risk are of approximately equal importance and collectively outweigh price. Technical evaluations will focus on service interruption and contingency plans, operations and maintenance, system deficiency corrections, and the operational transition plan. The total evaluated price is calculated as the net present value of monthly payments over the 50-year period. Proposals must be submitted in four volumes—Technical, Past Performance, Contract Documentation, and Price—via CD-ROM or DVD by January 7, 2027. Due to the sensitive nature of the requirement, offerors must obtain special access to secured documents through SAM.gov and the Joint Certification Program.
DLA Energy

POSTED

1 day ago

DEADLINE

in about 2 months
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS