Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

El Monte Pipeline No 2

Forecast
S-10008State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The El Monte Pipeline No 2 project involves the rehabilitation and repair of 12.2 miles of existing pipeline infrastructure stretching from near Lake Jennings to the Alvarado Water Treatment Plant at Lake Murray, passing through the cities of Santee, La Mesa, El Cajon, and San Diego, as well as the unincorporated community of Lakeside. The scope includes targeted improvements at 69 locations encompassing 1.35 acres, with work focused on replacing approximately 450 feet of deteriorated pipeline sections along El Monte Road using open trench methods, upgrading and reconstructing critical appurtenances such as air valves, blowoffs, and access structures, and installing new isolation valves to enhance system control and reliability. These efforts aim to extend the pipeline’s service life, improve operational efficiency, and ensure long-term water delivery reliability. In addition to pipeline-specific work, the project includes restoration of infrastructure affected by construction, such as repairs to curbs, gutters, sidewalks, and ADA-compliant ramps at intersections, as well as landscape mitigation measures that involve repairing ornamental vegetation in previously developed areas and conducting native plant revegetation in open space zones. The project is administered by the City of San Diego, with Nancy Graham serving as the primary point of contact, and is forecasted to be posted on June 9, 2026, under the broader context of infrastructure resilience in the Navajo Community Planning Area of Council District 7. All work is designed to comply with environmental and accessibility standards while minimizing disruption to surrounding communities.

General Info

Rehabilitate 12.2 miles of pipeline, replace 450 feet, upgrade appurtenances, restore infrastructure, ensure water reliability.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseForecast
Posted

forecast

Notice updated

The notice description changed.

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Ramesis BustamenteAssociate Engineer

Full Description

Show more
The project proposes rehabilitation and repairs along 12.2 miles of the existing El Monte Pipeline, including the Grossmont Tunnel. The purpose of the rehabilitation is to extend the pipeline’s service life, enhance operational efficiency, and improve reliability. Improvements are proposed at approximately 69 locations comprising 1.35 acres along the existing pipeline, including improvements to and reconstruction of existing appurtenances, such as air valves, blowoffs, and access structures; installation of new isolation valves; and open trench replacement of approximately 450 feet of deteriorated pipeline along El Monte Road. The project would also include repairs to curb and gutter, sidewalks, and Americans with Disabilities Act (ADA) ramps at affected intersections, the repair of ornamental landscape in previously developed areas and native plant revegetation in open space areas. The pipeline alignment is located in the cities of Santee, La Mesa, El Cajon, and San Diego and the unincorporated community of Lakeside. The project is approximately 12.2 miles long and extends from near Lake Jennings in the northeast to the Alvarado Water Treatment Plant at Lake Murray in the southwest (Navajo Community Planning Area, Council District 7). WBS Number: S-10008.02.06

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
SLED
Hammerman Gas/Diesel Tank Replacement Gunpowder Falls State Park
Solicitation # BPM059366
This project, solicitation BPM059366, involves the removal and replacement of above-ground gasoline and diesel fuel storage systems at the Gunpowder Falls State Park Hammerman Area in Baltimore County, Maryland. The scope of work requires the contractor to provide all labor, equipment, and materials to remove existing tanks, dispensers, piping, electronic systems, concrete pads, and bollards. Key deliverables include the installation of new storage tanks, concrete pads, and side-mount dispensers, as well as the provision of temporary gasoline and diesel tanks with metered dispensers for the duration of the project. All work must adhere to strict safety and environmental standards, including NFPA 30, 30A, and 78, API standards 650 and 620, and Maryland Department of the Environment regulations, with backfill compacted to a minimum of 95 percent. The contract is a Small Business Reserve Procurement, limiting the award to certified small businesses. The basis of award is the lowest responsive and responsible total bid. Procurement goals include a 15.00% MBE and 2.0% VSBE participation rate, with liquidated damages applicable for failure to comply with MBE requirements. The state reserves the right to apply reciprocal preference for resident bidders. Final acceptance is contingent upon the approval of the Facility Manager and DNR Project Engineer, requiring the submission of an approved electrical inspection certificate, a disposal manifest for contaminated soils and equipment, and three sets of manufacturer manuals and as-built drawings. Invoices are to be submitted to the Maryland Department of Natural Resources in Annapolis, with payments typically issued within 30 days of receipt of a proper invoice.

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237120
New
Federal
WH Ford RTC Fueling System Repairs
Solicitation # W9128F27RA054
Solicitation W9128F27RA054 is a design-build, firm-fixed-price contract for fueling system repairs at the W.H. Ford Regional Training Center in Kentucky, managed by the US Army Corps of Engineers, Omaha District. This project is a total set-aside restricted to 100% small businesses under NAICS code 237120. The scope of work involves comprehensive upgrades to two 10,000-gallon above-ground storage tanks, including the installation of an emergency fuel shutoff station, leak detection equipment, and an upgraded automatic tank gauging system. Additional requirements include repairing concrete and pavement, recoating fuel system canopies and piping, replacing tank vents, and improving grounding systems and equipment access platforms. All work must adhere to EM 385-1-1 safety standards, as well as IBC, NFPA, and ADA accessibility guidelines. Proposals must be submitted electronically in two separate volumes: a technical volume covering specialized experience, a Gantt chart for the project schedule, and a technical approach, and a separate pricing volume. The government will utilize the Lowest Price Technically Acceptable (LPTA) source selection process to award the contract. The proposal submission deadline has been extended to December 21, 2026, at 14:00 CST. Once awarded, the contractor must commence work within 10 days of the Notice to Proceed, with a final completion deadline of June 18, 2027. Compliance with the Davis-Bacon Act and Buy American requirements is mandatory.
W071 Endist Omaha

POSTED

2 days ago

DEADLINE

in about 2 months
View Details
NAICS: 237120
New
Federal
Gas Line Repair
Solicitation # GasLineRepair
The 55th Contracting Squadron at Offutt Air Force Base, Nebraska, is conducting a sources sought market survey to identify qualified contractors for the repair and replacement of gas distribution system components. The scope of work includes repairing gas leaks on 6 inch and 8 inch pipes and valves, as well as replacing components on 2 inch pipes and valves. Specific tasks involve repairing a 6 inch HDPE line near B479, replacing 8 inch valves and flanges near B73, and replacing a 2 inch isolation valve on the service line to B73. The project also requires the replacement or reconnection of cathodic protection and the installation of new valve boxes and risers marked for gas. The period of performance extends from the time of award until April 30, 2027. Due to base gas load requirements, the 8 inch valve replacement must be performed during warmer spring weather, specifically when temperatures show five consecutive days with lows above 40 degrees Fahrenheit and highs above 65 degrees Fahrenheit. All work must comply with 49 CFR 192, API, ASME, and American Gas Association standards, as well as ISO 9001 quality management processes. Contractors are required to provide welder certifications and perform pressure testing for at least one hour post-installation. This is a small business set-aside under NAICS code 237120. Interested parties must submit their capabilities package, including company information and socio-economic status, to the designated point of contact by 12:00 PM CST on November 17, 2026.
FA4600 55 Cons Pkp

POSTED

3 days ago

DEADLINE

in 11 days
View Details

More opportunities from California → City of San Diego

Same awarding agency

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS