Temporary Moratorium on Data Center Development, Establishment, Intensification, and Expansion

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Rebecca MaloneProgram Manager
Courtney PashPrincipal Planner

Full Description

Show more
Adoption of an ordinance to enact a temporary moratorium on the development of data centers in the City of San Diego. Data centers present a threat to public safety, health and welfare, and a moratorium provides the City with time to study, consider, and potentially adopt regulations to address whether, where, and under what conditions data centers should be allowed within the City.

More opportunities from California → City of San Diego

Same awarding agency

NAICS: 237120
SLED
El Monte Pipeline No 2
Solicitation # S-10008
The El Monte Pipeline No 2 project involves the rehabilitation and repair of 12.2 miles of existing pipeline infrastructure stretching from near Lake Jennings to the Alvarado Water Treatment Plant at Lake Murray, passing through the cities of Santee, La Mesa, El Cajon, and San Diego, as well as the unincorporated community of Lakeside. The scope includes targeted improvements at 69 locations encompassing 1.35 acres, with work focused on replacing approximately 450 feet of deteriorated pipeline sections along El Monte Road using open trench methods, upgrading and reconstructing critical appurtenances such as air valves, blowoffs, and access structures, and installing new isolation valves to enhance system control and reliability. These efforts aim to extend the pipeline’s service life, improve operational efficiency, and ensure long-term water delivery reliability. In addition to pipeline-specific work, the project includes restoration of infrastructure affected by construction, such as repairs to curbs, gutters, sidewalks, and ADA-compliant ramps at intersections, as well as landscape mitigation measures that involve repairing ornamental vegetation in previously developed areas and conducting native plant revegetation in open space zones. The project is administered by the City of San Diego, with Nancy Graham serving as the primary point of contact, and is forecasted to be posted on June 9, 2026, under the broader context of infrastructure resilience in the Navajo Community Planning Area of Council District 7. All work is designed to comply with environmental and accessibility standards while minimizing disruption to surrounding communities.
Oil and Gas Pipeline and Related Structures Construction

POSTED

about 1 month ago

DEADLINE

N/A
View Details
NAICS: 541370
SLED
5175 Del Mar Mesa Road/ PRJ-1149158
Solicitation # PRJ-1149158
The project involves a non-construction lot line adjustment between two parcels at 5005 and 5175 Del Mar Mesa Road in San Diego, California, totaling approximately 5.59 acres and located within the Agricultural-Residential AR-1-2 Base Zone, Coastal Overlay Zone, and Very High Fire Hazard Severity Zone. No physical development or construction is proposed; the sole purpose is to redefine the boundary between the two lots under a Coastal Development Permit, consistent with the Del Mar Mesa Community Plan. The application was processed under a CEQA categorical exemption (Section 15305) for minor land use alterations, with documentation confirming no significant environmental impact, no increase in density, and compliance with zoning and slope conditions. The only financial obligation is a $50.00 administrative fee for filing the Notice of Exemption, paid via check and recorded under transaction number 9074117 and receipt 37-06/11/2026-0521. The City of San Diego Development Services Department is the approving authority, with oversight handled by staff including Daniel Neri and Kelli Rasmus. The applicant, PLSA Engineering through Sarah Hess, submitted a three-page Notice of Exemption and supporting documentation to the San Diego County Recorder’s Office at 1600 Pacific Highway, with no electronic submission or federal procurement mechanisms involved. No federal contract clauses, evaluation factors, payment office structure, contract types, or special requirements apply, as this is a local land use permitting action governed by state environmental law and municipal code, not federal acquisition regulations. The official project identifier is PRJ-1149158, with a posted date of June 11, 2026, and submission required by 10:00 AM on that date in hard copy format.
Surveying and Mapping (except Geophysical) Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
LA JOLLA AND PACIFIC BEACH COMMUNITY PLAN UPDATES
Solicitation # PRJ-1085883
Project PRJ-1085883, managed by the City of San Diego, involves the development of the Cielo Mar residential subdivision located at 8303 La Jolla Shores Drive. The project entails the demolition of an existing 3,304-square-foot single-dwelling unit and accessory structures, the consolidation of three parcels into one, and the subsequent subdivision of the 4.5-acre site into six residential lots and one lot for a private street. The development plan includes the construction of six detached two- to three-story single-family homes with a total combined square footage of 81,748 square feet, including one accessory dwelling unit on lot six. Site improvements will feature a private access road, utility upgrades, sidewalks, and pools. The project is situated within the La Jolla Shores Planned District and is subject to various regulatory overlays, including the Coastal Zone Boundary, Very High Fire Hazard Severity Zone, and Paleontological Sensitivity Area. Comprehensive technical studies have been conducted to ensure compliance, including a preliminary drainage study, a geotechnical investigation for foundation and slope stability, a biological survey to protect sensitive species, and a Phase I cultural resource survey. Environmental compliance is managed through an addendum to the La Jolla and Pacific Beach Community Plan Environmental Impact Report, with additional mandates for a 75 percent waste diversion rate and strict storm water quality management. The project received approval from the City of San Diego Planning Commission on December 4, 2025, with a formal Notice of Determination filed on May 29, 2026.
Land Subdivision

POSTED

5 months ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS