Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

El Portal 125 Tenant Improvement

Closed
CC-1000141State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes such as epoxy mortar flooring, and the installation of updated HVAC, exhaust extraction, and compressed air systems. Additionally, the work includes a full NFPA-compliant fire suppression system, electrical distribution and lighting upgrades, building automation controls, and site improvements including paving, drainage, and hazardous materials abatement. The estimated contract value is between 10 million and 25 million dollars, with a performance period of 730 days after award. The contract is awarded based on the lowest price, with pricing required for two primary exhibit line items: building renovation and paving removal and replacement. Bidders must adhere to strict bonding requirements based on proposal value, including bid, payment, and performance bonds for projects exceeding 150,000 dollars. Compliance with the Davis-Bacon Act, ADA accessibility guidelines, and specific military standards for piping and labeling is mandatory. Project administration will be managed through Wide Area WorkFlow for invoicing, and quality assurance will be enforced via a three-phase control process and a final acceptance inspection involving the Contracting Officer and a Quality Control Manager.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, mechanical and electrical utilities, and an underground stormwater retention system. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator services, fire protection, plumbing, mechanical, electrical, sitework, and crane operations. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform comprehensive water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. The project follows a fire sprinkler discharge and requires the restoration of the first, second, and third floors, including dormitories, offices, and conference rooms. The scope of work encompasses architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to Small Businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms. Award will be based on Best Value, evaluated through a weighted system consisting of price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory pre-bid site visit and provide a detailed cost breakdown, a 90-day bid guarantee, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act and specific Executive Orders regarding minimum wage and paid sick leave. Compliance with OSHA, EPA, ADA, and NFPA-101 Life Safety Code is required, and the contractor must provide a one-year guarantee of workmanship.
Grafton Job Corps

POSTED

about 3 hours ago

DEADLINE

in 8 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation is seeking proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces, including sixteen residential rooms and bathrooms, common areas, and mechanical rooms, to return them to safe residential use. The scope of work involves drywall installation, joint finishing, and painting, as well as the temporary removal and re-installation of HVAC equipment. The contractor is responsible for all labor, materials, equipment, and supervision, ensuring that all restored mechanical, plumbing, electrical, fire/life-safety, and security systems are tested and approved. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Proposing contractors must provide itemized pricing, a detailed work plan including project phasing and occupied-building protection, and evidence of relevant experience. Award requirements include payment and performance bonding for the full project value, as well as general liability insurance of 1 million dollars per occurrence and 3 million dollars general aggregate. A minimum one-year workmanship warranty is required upon final acceptance by CSD.
Career Systems Development Corporation

POSTED

about 3 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The El Portal 125 Tenant Improvement project at the University of California, Merced, involves the construction of fire-rated partitions to create a separate art storage room and event area, reclassifying the space from B occupancy to A type occupancy. The scope of work includes modifications to the HVAC, lighting, and fire sprinkler systems, the installation of fire smoke dampers and rated doors, and general fire stopping. The contractor is responsible for all logistics, including site cleanup, protecting existing contents, and maintaining accessible pathways. Technical requirements mandate compliance with 2022 California building codes, NFPA 13 standards, and ADA requirements, with specific seismic design anchorage for TV installations. The project is estimated at 230,000 dollars and must be performed between October 15, 2026, and January 20, 2027, with a completion timeline of 90 days from the Notice to Proceed. Bids are due by October 14, 2026, and the university will select the lowest responsive and responsible bidder. Qualified contractors must hold a California Contractor License A or B and be registered with the California Department of Industrial Relations. Required submissions include a lump sum base bid, a daily rate for compensable delays, and self-certification for SBE, DBE, WBE, or DVBE status. Performance and payment bonds are required for contracts exceeding 50,000 and 25,000 dollars, respectively, and all workers must be paid prevailing wages in accordance with the California Labor Code.

General Info

UC Merced tenant improvements for art storage and events costing 230,000 dollars.

Place of Performance

Merced, CA, 95343, USA

Set-Aside

NONE

Documents

8
PDF, High priority: read this firstrfb
High
PDF, High priority: read this first41 pages · itb
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first4 pages · specifications
High
PDF, High priority: read this first51 pages · specifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUniversity of California, Merced
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
Bid #CC-1000141: The project involves tenant improvements at El Portal 125, including the construction of new fire-rated walls to create a separate art storage room and event area. Key work items include modifications to the fire sprinkler system, addition of fire smoke dampers, lighting modifications, installation of rated doors, fire stopping, and construction of fire-rated assemblies. Modifications to the HVAC system are also required. The contractor is responsible for protecting all spaces and contents, site cleanup, maintaining accessible pathways, and managing all logistics including lifting, staging, storage, and transportation of personnel, materials, and equipment. Work must be performed between October 15, 2026, and January 20, 2027.

More opportunities from University of California, Merced

Same awarding agency

NAICS: 236220
SLED
Gallo Gym Scoreboard Upgrade
Solicitation # CMN0000089
The Gallo Gym Scoreboard Upgrade (Project No. CMN0000089) is a lump-sum contract issued by the University of California, Merced, for the replacement of an existing scoreboard with a new, larger unit at the Joseph E. Gallo Recreation Center. The scope of work includes the installation of the scoreboard, which has been previously purchased by the University, along with the installation of new electrical circuits, low voltage conduit pathways, and additional structural backing in the exterior wall. The project requires adherence to the State of California Construction Safety Orders, Title 8 and Title 24 of the California Code of Regulations, the Americans with Disabilities Act Title II, and the California Environmental Quality Act. The University will award the contract to the apparent lowest responsive and responsible bidder. Bidders must submit physical, sealed bids using the official University Bid Form, accompanied by bid security totaling 10 percent of the lump sum base. Post-selection requirements include providing three originals of the signed agreement, payment and performance bonds, certificates of insurance, and the qualifications of the proposed superintendent. The contractor is required to submit a detailed project schedule using the Critical Path Method within 30 working days of the Notice to Proceed and provide monthly updates. Contract administration involves strict material handling and quality standards, requiring products to be delivered in original packaging with appropriate UL labeling and stored according to manufacturer instructions. The University's Representative oversees all tests, inspections, and acceptances, requiring 48 hours of written notice prior to such events. Payment is processed following in-person reviews between the contractor and the University's Representative within five working days of an application for payment. The University also emphasizes the participation of Small Business Enterprises and Disabled Veteran Business Enterprises.
Commercial and Institutional Building Construction

POSTED

17 days ago

DEADLINE

in 10 days
View Details
NAICS: 237110
SLED
Campus Lift Station Upgrades
Solicitation # CMJ0000024
The University of California, Merced, is soliciting bids for the Campus Lift Station Upgrades project, identified as solicitation CMJ0000024. With an estimated construction cost of 3,300,000 dollars, the project aims to address capacity issues caused by campus growth. The scope of work includes constructing a new wet well, installing three new pumps, increasing electrical capacity, and providing dedicated emergency power and data feeds. The project also requires modifications to the existing sewer system to utilize the current forced main and adjustments to the adjacent storm detention basin. To ensure continuous operation, a temporary bypass must be implemented during the system cut-over. To be eligible for award, prospective bidders must undergo a prequalification process. Requirements include holding a current California General Engineering Contractor License (Class A) and demonstrating the successful completion of at least two comparable projects in California within the last five years, each valued at 1,000,000 dollars or more. At least one project must specifically involve the construction or renovation of a sewer lift station. Bidders must also provide a claims history, a written safety program meeting CAL/OSHA requirements, and a signed insurance declaration. The contract mandates adherence to prevailing wage laws, UC Fair Wage standards, and non-discrimination policies, while encouraging the participation of Small Business Enterprises and Disabled Veteran Business Enterprises. Prequalification submissions are due by November 17, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

17 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS