Eleanor Bridge Interim Repair Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Eleanor Bridge Interim Repair Project, managed by the San Francisco Public Utilities Commission and the City and County of San Francisco, involves critical infrastructure restoration in California. The primary scope of work includes replacing a damaged one to two inch thick concrete overlay on the bridge deck with a new composite system consisting of methacrylate primer and impervious polyester polymer concrete, along with minor repairs to the bridge soffit. Phase 2 of the project extends the scope to include concrete repairs on the downstream side of the dam, specifically targeting the piers and spillway bays. Additional work will be performed on the foundation of the diversion or training wall, various arches atop the reservoir, and the concrete gravity wall sections located on the upstream side of the dam. This project has been granted a categorical exemption under CEQA Class 1, Section 15301, with final approval issued in July 2026.

General Info

Tuolumne County project for Eleanor Bridge deck restoration and dam infrastructure concrete repairs.

Agency

California → Tuolumne County

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Tuolumne County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Tuolumne County
Office AddressN/A
Contacts
Timothy JohnstonSenior Planner

Full Description

Show more
Replace the existing damaged 1-2-inch-thick concrete overlay atop the existing bridge deck with a new composite overlay comprised of impervious polyester polymer concrete (PPC) and methacrylate primer. Additional minor repairs on the soffit (underside) of the bridge. The Phase 2 scope of work proposes concrete repair on specific areas of the spillway bays and piers on the downstream side of the dam, the foundation of the training or diversion wall, certain arches atop of the reservoir, and along the west and east gravity wall sections of concrete on the upstream side of the dam.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, subsurface investigation, and shoring; pipeline and utility installations involving tunneling, boring, jacking, micro tunneling, and cathodic protection; and surface improvements including asphalt paving, traffic signals, lighting, and landscaping. Required materials and services encompass ready mix supply, precast concrete, manhole materials, and welding services. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. Additionally, subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Quotes are being accepted through the Building Connected system, with a response deadline of November 18, 2025. Interested parties may contact Lead Estimator Ken Johnston for further project details and scheduling information.
Kiewit Infrastructure West Co.

POSTED

18 minutes ago

DEADLINE

in 15 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS