Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Electric Door Operator and Safety Edge Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Dallas Area Rapid Transit Authority involves the supply and installation of motorized drive systems and safety sensors for facility projects. The scope of work includes installing 2hp gear-drive electric operators using LiftMaster Model GH and 4-wire Miller Electric safety edges. The contractor is responsible for wiring push buttons and safety edges to the operator, performing all necessary operational testing, and providing detailed product data sheets to ensure a fully operational motorized door system. The project is categorized under NAICS code 238210 and was posted on August 22, 2026, with a response deadline of September 11, 2026. This engagement is designed for providers acting as subcontractors to prime contractors on DART facility projects within Texas.

General Info

Subcontract for installing motorized drive systems and safety sensors for DART facility projects.

Agency

Texas → Dallas Area Rapid TransitView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of B-2098195.

The full solicitation package (12 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

VAF Overhead Door Replacement | Ref. 2098195

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Dallas Area Rapid Transit
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → Dallas Area Rapid Transit
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs motorized drive systems and safety sensors for prime contractors on Dallas Area Rapid Transit (DART) Authority facility projects. Installs 2hp gear-drive electric operators (LiftMaster Model GH) and 4-wire Miller Electric safety edges. Wires push buttons and safety edges to the operator and performs operational testing. Provides product data sheets. Delivers a fully operational motorized door system.

Similar Contracts

Same NAICS industry code

More opportunities from Texas → Dallas Area Rapid Transit

Same awarding agency

NAICS: 238340
SLED
Annex Floor Tile and Paint
Solicitation # B-2098311
Dallas Area Rapid Transit (DART) has issued solicitation B-2098311 for the replacement of hallway floor tiles and interior wall painting at the Central Rail Operations Facility (CROF) Annex Building in Dallas, Texas. The scope of work includes the removal and installation of approximately 3,500 square feet of charcoal vinyl composition tile, the installation of 1,200 linear feet of dark gray vinyl cove base, leveling of approximately 380.79 square feet of concrete flooring, and the preparation and painting of approximately 10,000 square feet of hallway walls. The project is designed to improve the facility's durability and appearance, with a performance period of five months from the notice to proceed, potentially extendable by eight months. The contract is an invitation for bids for locally funded supplies and services, with the award granted to the responsible bidder who provides the most advantageous price and price-related factors. Bidders must submit a comprehensive package including a bid schedule, representations and certifications, a business questionnaire, and an employee information report. Key requirements include compliance with small business concern provisions, drug-free workplace certifications, and non-discrimination assurances. The contractor is responsible for all labor, materials, and equipment, ensuring that all work meets DART standards and manufacturer recommendations, with final acceptance contingent upon the absence of defects in workmanship.
Tile and Terrazzo Contractors

POSTED

14 days ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS