Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Vinyl Composition Tile (VCT) and Cove Base Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity involves the installation of Vinyl Composition Tile (VCT) and resilient wall base for Dallas Area Rapid Transit (DART) facility projects. The scope of work requires the removal of existing 12-inch by 12-inch VCT and the preparation of the subfloor according to manufacturer specifications. The selected contractor will be responsible for installing 3,500 square feet of Armstrong Imperial Texture Charcoal VCT and 1,200 linear feet of 4-inch 700 Series Dark Gray Vinyl Cove Base. The final deliverable must include fully installed and cleaned flooring and wall base. The solicitation is categorized under NAICS code 238310 and is managed by the Dallas Area Rapid Transit agency in Texas. Interested parties must submit their responses by the deadline of September 14, 2026. This project is structured as a subcontract for prime contractors performing work on DART facilities, ensuring that all flooring materials and installation methods meet specific organizational standards.

General Info

Install 3,500 square feet of VCT and 1,200 linear feet of base for DART.

Agency

Texas → Dallas Area Rapid TransitView Agency

NAICS

238310 - Drywall and Insulation ContractorsView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of B-2098311.

The full solicitation package (12 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Annex Floor Tile and Paint

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Dallas Area Rapid Transit
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → Dallas Area Rapid Transit
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs VCT and resilient wall base for prime contractors on Dallas Area Rapid Transit (DART) facility projects. Removes existing 12-inch by 12-inch VCT, prepares subfloor per manufacturer requirements, and installs 3,500 SF of Charcoal VCT and 1,200 LF of 4-inch 700 Series Dark Gray Vinyl Cove Base. Uses Armstrong Imperial Texture Charcoal VCT. Delivers fully installed and cleaned flooring and wall base.

Similar Contracts

Same NAICS industry code

More opportunities from Texas → Dallas Area Rapid Transit

Same awarding agency

NAICS: 238340
SLED
Annex Floor Tile and Paint
Solicitation # B-2098311
Dallas Area Rapid Transit (DART) has issued solicitation B-2098311 for the replacement of hallway floor tiles and interior wall painting at the Central Rail Operations Facility (CROF) Annex Building in Dallas, Texas. The scope of work includes the removal and installation of approximately 3,500 square feet of charcoal vinyl composition tile, the installation of 1,200 linear feet of dark gray vinyl cove base, leveling of approximately 380.79 square feet of concrete flooring, and the preparation and painting of approximately 10,000 square feet of hallway walls. The project is designed to improve the facility's durability and appearance, with a performance period of five months from the notice to proceed, potentially extendable by eight months. The contract is an invitation for bids for locally funded supplies and services, with the award granted to the responsible bidder who provides the most advantageous price and price-related factors. Bidders must submit a comprehensive package including a bid schedule, representations and certifications, a business questionnaire, and an employee information report. Key requirements include compliance with small business concern provisions, drug-free workplace certifications, and non-discrimination assurances. The contractor is responsible for all labor, materials, and equipment, ensuring that all work meets DART standards and manufacturer recommendations, with final acceptance contingent upon the absence of defects in workmanship.
Tile and Terrazzo Contractors

POSTED

11 days ago

DEADLINE

in 10 days
View Details