Electric Vehicle Supply Equipment (EVSE) Sierra District Office

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project entails the installation of Electric Vehicle Supply Equipment at the Sierra District Office parking lot to support two future Electric Vehicle Charging Stations. This includes constructing the necessary electrical infrastructure such as buried conduits, new wiring, and connected power systems drawing from the site’s existing electrical source. Fixed bollards and wheel stops will be installed to safeguard the equipment, and designated parking stalls will be clearly marked with stenciling and signage indicating exclusive use for EV charging. All work involving pavement saw cutting, trenching, backfilling, and surface restoration must comply with applicable laws and regulations, ensuring the lot is returned to its original condition after construction. The installation does not include the actual charging units themselves, which are scoped for future deployment. The project is forecasted by the California Department of Parks and Recreation, with primary point of contact Todd Lewis, Chief of District Facilities Management, and Janelle Goulding, Project Director II from the Office of Sustainability, overseeing execution. Work will be performed at the Sierra District Office location in California and is intended to establish foundational infrastructure for eventual EV charging capabilities, promoting sustainable transportation within state-managed facilities without immediate deployment of the charging stations.

General Info

Install EV infrastructure at Sierra District Office parking lot, no charging units included, led by Todd Lewis and Janelle Goulding.

Agency

California Parks and Recreation, Department of

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Todd LewisChief, District Facilities Management, CDPR
Janelle GouldingProject Director II, DGS, Office of Sustainability

Full Description

Show more
The project consists of installing Electric Vehicle Supply Equipment (EVSE) to provide power for two future Electric Vehicle Charging Station (EVCS) unit at the Sierra District Office designated vehicle or employee parking lot. The parking stall will be stenciled for "EV Charging Only" and signage provided to note stall intended for use by designated vehicles. The project includes installation of fixed bollards, wheel stops, where needed to protect equipment, buried conduits, and new electrical equipment including wiring for a complete operational and functional system. Electrical power will be supplied by connection to existing electrical source provided at the site. All work and waste disposal will comply with existing applicable laws, regulations, and ordinances governing work and work will involve pavement saw cutting, trenching, backfilling, and finishing of affected lot surface restored to original condition. The project would provide infrastructure needed to power EVCS to recharge electric vehicles. EVCS unit installations are not within project scope at this time.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
Parsons Corporation is soliciting bids for the Construction Cycle 10 project at the William J. Hughes Technical Center in Atlantic City, New Jersey, supporting the FAA Airport Technology Research and Development branch. The scope of work involves the controlled demolition of existing runway test pavement and the construction of new concrete test slabs measuring approximately 310 by 52.5 feet with a thickness of 15.5 inches. Key requirements include providing aggregate subbase, updating the asphalt base course to a stabilized drainable base, and performing minor design adjustments to plans and specifications. The subcontractor is responsible for procuring all materials, managing waste disposal, and providing geotechnical engineering and roadway materials testing services. The project involves rigorous material characterization tests, including California Bearing Ratio and Plate Load tests, with critical operations phased to allow for continuous subgrade adjustments. Work is primarily scheduled for normal business hours, Monday through Friday, though some after-hours and weekend work may be required. This opportunity is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone certified firms.
Parsons Corporation

POSTED

about 3 hours ago

DEADLINE

in 3 months
View Details
NAICS: 237130
New
Federal
Electrical Projects – Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Request for Information
Solicitation # MHMV200009-MHMV120009-MHMV08002
The U.S. Air Force 377th Contracting Division is seeking market intelligence via a Request for Information (RFI) for the demolition and construction of electrical substations at Kirtland Air Force Base, New Mexico. The project involves three primary efforts: the repair of Substation 9 and its feeders, the removal of Substation 23 with load connection to Substation 24A Feeder 5, and the demolition of Substation 3 to facilitate the rebuild of a modern 10,000 KVA consolidated Substation 10. The goal is to modernize the base electrical infrastructure with 12.47 kV distribution systems, eliminate single points of failure, and ensure regulatory compliance. The government is evaluating the feasibility of using a Progressive Design-Build (PDB) delivery method under an Other Transaction (OT) Agreement pursuant to 10 U.S.C. 2808a. The scope of work requires a phased design approach, moving from conceptual design to a final 100% stamped construction document set, with a target completion date of May 2027 or sooner. Technical requirements include compliance with IBC, UFC 3-501-01, NFPA 70, and IEEE C2 standards, as well as strict adherence to Department of Defense cybersecurity protocols for electric meters. Contractors must provide a Critical Path Method schedule and engage an independent testing organization for system calibration. Key administrative requirements include the provision of performance bonds, adherence to Davis-Bacon wage rates, and strict environmental controls regarding hazardous materials and ozone-depleting compounds. Interested firms are requested to provide company profiles, relevant experience, and feedback on the proposed PDB-OTA acquisition strategy.
FA9401 377 Msg Pk

POSTED

about 8 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237130
New
Federal
USFK C4I Communication Tower and Facility Maintenance CY27
Solicitation # W91QVN26QXXXX
Solicitation W91QVN27QA007 is a Firm Fixed Price request for quotations to provide non-personnel maintenance and repair services for 21 C4I Communication Tower sites and related facilities supporting the 41st Signal Battalion in South Korea. The scope of work includes structural integrity assessments, physical inspections for rust and damage, bonding and grounding tests, lighting protection maintenance, LED beacon and side marker light replacement, tower painting, and lead abatement. Specific facility repairs are limited to the interior and exterior of the Osan Bucket C4I Communication Shelter. The period of performance is a 12-month base period running from January 1, 2027, to December 31, 2027, across five primary locations: CP Walker, Highpoint, Osan Bucket, Yongsan, and Papyongsan. Award will be made on an all-or-none basis to the responsible offeror submitting the lowest price technically acceptable offer. Technical acceptability is evaluated on a pass/fail basis, requiring a complete technical package and proof of mandatory ROK business licenses, specifically Information and Communication and Electrical Construction licenses. Key personnel requirements include a Contract Manager, a CQCSM/Safety Manager with an associate degree and five years of relevant experience, and a Lead Technical Engineer. All quotes must be submitted in Korean Won via PIEE by November 18, 2026, and must include both a detailed price breakdown and a completed SF 1449 pricing schedule. Performance will be monitored via a Quality Assurance Surveillance Plan and a Performance Requirements Summary to ensure compliance with NETCOM and Army regulations.
0411 Aq Hq Contract Augmented

POSTED

about 8 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237130
New
SLED
80627Y0173-Neighborhood Internet Installation at HPD Bronx Family Living Center
Solicitation # 80627Y0173
The New York City Department of Housing Preservation and Development is soliciting proposals for the Neighborhood Internet pilot project at the Bronx Family Living Center. The project involves installing a hybrid fiber/fixed wireless internet network, which includes retrofitting two neighboring buildings for hotel-style Wi-Fi service and installing rooftop antennas to establish one building as a wireless hub. The selected vendor must provide 1GB+ fiber backhaul service and ongoing network maintenance for a three-year term. Technical requirements specify that the network must be certified for Wi-Fi 6 (802.11ax) or newer and comply with Citywide Privacy Protection Policies and Protocols. This is a M/WBE Noncompetitive Small Purchase, meaning only New York City-Certified M/WBE firms are eligible to apply. The contract is estimated to be valued at or above $200,000, making Local Law 63 applicable. Proposals are evaluated primarily on experience, qualifications, and capacity (75% weight), specifically regarding residential wireless and hybrid fiber/wireless deployments. Subcontracting is limited to 40% of the total contract amount, with non-M/WBE subcontractors capped at 20%, though fiber backhaul providers are exempt from this limit. All submissions, including cost proposals and required affirmations regarding the Iran Divestment Act, Macbride Principles, and tax status, must be completed through the PASSPort system.
Department Of Housing Preservation And Development

POSTED

about 20 hours ago

DEADLINE

in 17 days
View Details
NAICS: 237130
New
SLED
Underground Utility District 38 Overhead-to-Underground Service Conversions
Solicitation # CS 09-26-07
Alameda Municipal Power (AMP) is soliciting bids for the Underground Utility District 38 Overhead-to-Underground Service Conversions project (CS 09-26-07). The primary objective is to safely convert 195 residential electrical services from overhead to underground routing without increasing customer capacity or modernizing existing customer-owned equipment, which will be reused if deemed safe by the City Building Division. The scope includes the installation of approximately 8,389 linear feet of aluminum service conductors across standard and 3-inch lateral locations. The project is expected to start around March 1, 2027, and must be completed within 365 calendar days of the Notice to Proceed. Eligible bidders must possess a valid California C-10 Electrical Contractor license and be registered with the Department of Industrial Relations. A mandatory virtual pre-bid meeting was held on November 5, 2026, and all bids must be submitted via the OpenGov Bid Portal by November 25, 2026. The contract will be awarded to the lowest responsive and responsible bidder based on capacity, experience, and past performance. Required submissions include a 10% bid security, a subcontractor list, and a bid schedule. Once awarded, the contractor must provide performance and payment bonds for 100% of the contract price and adhere to the City of Alameda Project Stabilization Agreement to ensure labor harmony and prevailing wage compliance.
Engineering and Operations

POSTED

about 22 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237130
New
SLED
Pre-Qualification: Overhead Contact System (OCS) Rehabilitation Project Phase 4A – Tasman West/East
Solicitation # C26152F
The Santa Clara Valley Transportation Authority (VTA) is soliciting pre-qualifications for the Overhead Contact System (OCS) Rehabilitation Project Phase 4A – Tasman West/East (Contract C26152F). This project, with an estimated construction cost between 1.7 million and 2.3 million dollars, involves the detailed engineering design, procurement, and installation of new 300 kcmil contact wire, registration insulators, in-span insulators, and surge arresters along Tasman Drive and East Java Drive. Work will be performed in an active light rail operating environment, requiring strict adherence to VTA safety procedures and close coordination to minimize service interruptions, particularly near the agency's only LRV wash facility. To be eligible to submit a sealed bid, firms must be approved through a two-stage pre-qualification process. Applicants must submit a completed qualification questionnaire and a Statement of Qualification Certification Form via the VTA eProcurement portal by December 14, 2026. Minimum requirements include the successful installation of at least 5 miles of OCS for a mainline electrification railroad or urban transit system within the last 10 years, with each contract valued at a minimum of 800,000 dollars. Management and supervisory personnel must also possess equivalent experience. Qualification is determined by a scoring matrix, where scores below 55 result in disqualification, and scores of 72 or higher on two interviews are sufficient for approval. Final contract award will be granted to the lowest responsive and responsible bidder.
Engineering and Program Delivery

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS