Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Electric Vehicle Supply Equipment Project at CAL TRANS District 3 1403 Furneaux

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project at Caltrans District 3 in Marysville/Sacramento involves the installation of underground infrastructure to support future Electric Vehicle Supply Equipment (EVSE) for fleet operations, specifically preparing for two dual-port and one single-port pedestal-mounted charging stations, though the actual charging units are not included in this scope. The work includes burying conduits, installing fixed bollards and wheel stops, and deploying new electrical wiring and equipment to deliver power from an existing on-site source. Five designated parking stalls will be restriped with dedicated EV stenciling and accompanied by clear signage to ensure proper usage and visibility. All pavement work, including saw cutting, trenching, backfilling, and surface restoration, must return the lot to its original condition. Waste disposal and all activities will strictly adhere to relevant legal and regulatory requirements. The project is forecasted to be posted on July 15, 2026, and is being managed through Caltrans District 3 with Peter Hendrix, P.E. as the primary point of contact.

General Info

Install underground EVSE infrastructure, five restriped stalls, conduits, wiring, bollards, and restore pavement per regulations.

Agency

California → Caltrans, District 3 - Marysville/Sacramento

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

1403 Furneaux, CA, 95961

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 3 - Marysville/Sacramento
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 3 - Marysville/Sacramento
Office AddressN/A
Contacts
Peter HendrixZEVI Deputy Division Chief

Full Description

Show more
The project consists of installing the Electric Vehicle Supply Equipment (EVSE) infrastructure for fleet use. This initiative is designed to create a fully operational system that will eventually support two dual ports and one single port, pedestal-mounted Electric Vehicle Charging Stations (EVCS). Note that the installation of the EVCS themselves is outside our current scope and may be handled by others at a later date. As part of this project, five parking stalls will be specially stenciled and restriped. Clear signage will be installed to indicate that these stalls are reserved for electric vehicle use, ensuring easy identification and proper use The project involves the installation of buried conduits, fixed bollards, wheel stops, and new electrical equipment, including all necessary wiring, to deliver a complete and functional system. Electrical power for the EVSE will be drawn from an existing source already available at the site. All aspects of the work, including waste disposal, will be conducted in strict compliance with all applicable laws, regulations, and ordinances. The work will involve pavement saw cutting, trenching, backfilling, and restoring the affected lot surface to its original condition once the installation is complete.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified Small Business Enterprises (SBE), Veteran-Owned Small Business Enterprises (VSBE), and Disadvantaged Business Enterprises (DBE) to serve as subcontractors, material contractors, and suppliers for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The extensive scope of work encompasses civil and site work, including tunneling, boring, and shoring; utility installation involving various piping materials and cathodic protection; asphalt and concrete paving; and specialized electrical and telecommunications systems. The bid deadline is September 15, 2026, with invitations to bid issued through the BuildingConnected system. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades, including carpenters, laborers, and operating engineers, and must demonstrate an ability to maintain labor harmony. Eligible bidders must possess a valid California Contractor license and provide acceptable insurance, with some subcontractors potentially requiring bonding for 100 percent of their contract value, for which Kiewit will reimburse premiums. This project is partially funded by multiple grants from the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating strict adherence to DBE Program requirements. SBE and VSBE firms must provide certification evidence from the Department of General Services and the Port of Long Beach PlanetBids portal.
Kiewit Infrastructure West Co.

POSTED

about 18 hours ago

DEADLINE

in 17 days
View Details