Electrical and Conduit Installation for ITS Infrastructure
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract involves the installation of underground conduits, duct banks, junction boxes, grounding systems, and power feeds necessary to support Intelligent Transportation System (ITS) devices including dynamic message signs and emergency service stations. This work is part of a larger effort to modernize and expand transportation infrastructure in Fulton County, Georgia, with the scope focused on ensuring reliable electrical connectivity and safety compliance for ITS equipment. The project requires precise underground construction techniques, adherence to electrical codes, and integration with existing utility networks to support long-term operational needs. Awarded as a subcontract under the Georgia Department of Transportation, the work is governed by NAICS code 238210, indicating it falls under electrical contracting services. The solicitation was posted on August 21, 2026, with an identical deadline for responses, suggesting a concurrent posting and closing process likely indicating a quick-turn or pre-qualified procurement. Performance is limited to Fulton County, and while specific contact or set-aside details are not provided, the contract expects qualified subcontractors to deliver fully compliant, durable, and code-adherent infrastructure ready for immediate integration with ITS hardware.
General Info
Agency
NAICS
Place of Performance
Fulton, GA, USSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
