Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Washington was posted on October 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Electrical and Pedestrian Lighting

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
26-140 Installation of Emergency Shut Off Switches
Solicitation # 26-140
Solicitation 26-140 is a subcontracting opportunity with Atterbury Job Corps Center, operated by Adams and Associates, Inc. for the U.S. Department of Labor, to install emergency shut-off switches in the Facility Maintenance Shop in Edinburgh, Indiana. The project requires the installation of two mushroom-head push-button emergency shut-off switches and a new 60A, 208/120V, 3-phase, 4-wire, 6-circuit branch circuit panel with a 60A shunt-trip main circuit breaker. All work must comply with OSHA, EPA, FNC guidelines, and applicable state, local, and national building codes. The solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Prospective bidders must have attended a mandatory site visit on November 10, 2026, and must submit a single lump sum proposal by November 20, 2026. Proposals must include a detailed cost breakdown, a timeline for substantial completion, a W9, a completed vendor questionnaire, and proof of a valid Indiana Contractor's License. Award will be based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). The selected contractor must provide proof of automobile liability, general liability, and workers compensation insurance, and must adhere to Davis Bacon Act wage rate decisions. Performance requirements include providing a sequenced construction schedule within 10 days of the Notice to Proceed and correcting any punch list items within 14 days of substantial completion. The contract includes a one-year workmanship guarantee and operates on Net 30 payment terms. Final payment is contingent upon the delivery of a completed SF 1413, certified payroll records, and a release of liens from all subcontractors and suppliers.
Atterbury Job Corps. – Adams & Associates

POSTED

about 7 hours ago

DEADLINE

in 5 days
NAICS: 238210
New
Emergency/Exit Lighting – Mechanical/Electrical Rooms Project
Solicitation # emergencyexit-lighting-mechanicalelectrical-rooms-project
Human Learning Systems dba Quentin Burdick Job Corps is soliciting bids for a subcontracting opportunity to install code-compliant emergency and exit lighting at its center in Minot, North Dakota. The project focuses on correcting deficiencies identified in the 2026 Facility Survey, specifically within the mechanical and electrical rooms of Building 26 (Female Dormitory) and Building 27 (Single Parent Dormitory). The selected contractor will provide all labor, materials, equipment, and supervision to install combination LED emergency/exit light fixtures and required directional markings. All work must adhere to NFPA 101 Life Safety Code and NFPA 70 National Electrical Code standards. This solicitation is set aside for Small Businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. Bidders must comply with the Davis-Bacon Act prevailing wage requirements and provide a current insurance certificate, a contractor's license, and any required North Dakota trade licenses. Proposals must be submitted using the provided bid sheet and include a detailed itemized quotation; a bond is required for proposals exceeding 150,000 dollars. The deadline for proposal submission is December 4, 2026, at 4:00pm CST, with a scheduled site walk-through on November 23, 2026. Payment terms are Net 30 following service verification and invoice receipt.
Human Learning Systems dba Quentin Burdick Job Corps

POSTED

about 7 hours ago

DEADLINE

in 20 days
NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work includes performing visual and infrared thermographic inspections on energized transformers under typical load, installing standardized external oil sampling devices to eliminate the need for internal compartment access, and conducting comprehensive oil testing analysis. Key deliverables include annotated infrared images, written condition assessment reports for each asset, on-site training for agency staff, and the development of standard operating procedures. All work must adhere to strict industry standards, including NETA MTS, IEEE guidelines, NFPA 70E safety protocols, and ASTM D923 for oil sampling. The agency intends to make a single award to the most capable and cost-effective offeror. Evaluation criteria focus on the proposer's experience with utilities or industrial facilities, their ability to provide both oil sampling and infrared inspection services, proposed staffing and methodology, and their fee structure. Proposals must be submitted electronically via PlanetBids by December 23, 2026. Required documentation includes a detailed project approach, a company profile, three references from the last five years, and evidence of cybersecurity compliance through SOC 2 or CAIQ. Selected contractors must provide certificates of insurance and comply with Department of Industrial Relations registration for public works. Payment is processed electronically via ACH, with expedited payment options available for those offering early payment discounts.
Inland Empire Utilities Agency

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 238210
New
Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility
Solicitation # purified-water-replenishment-san-jacinto-valley-advanced-water-purification-facility-2
Axia Electric LLC is soliciting bids from SBE and DBE certified firms for the Eastern Municipal Water District Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility Project in California. The scope of work is divided between the San Jacinto Valley Advanced Water Purification Facility and the Brine Ponds, specifically requesting subcontractors for low voltage systems, fiber optics, and electrical materials and supplies. Bids must be submitted via email to Ryan Falk by 2:00 PM on November 18th, with a final deadline of November 19th. Non-certified firms are encouraged to provide information regarding lower-tier SBE or DBE participation for evaluation. Qualified bidders must be registered to perform public work pursuant to Labor Code Section 1725.5 and agree to the terms of the AGC Master Labor Agreements and Axia's Standard Long Form Subcontract or Purchase Order. Strict insurance requirements are mandatory, including 1 million dollars for Auto Liability and Workers Compensation, 5 million dollars for Excess Liability, and General Liability coverage of 1 million dollars per occurrence, 2 million dollars aggregate, and 2 million dollars for completed operations. All proposers are bound by the prime contract terms and conditions, including all payment provisions.
Axia Electric

POSTED

about 7 hours ago

DEADLINE

in 4 days
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project objective is to engage a qualified electrical contractor to inspect, test, repair, and certify the facility's emergency lighting systems in accordance with NFPA 101 (2024 Edition), NFPA 70, and OSHA regulations. Key deliverables include the documentation of all fixtures within the operator's Computerized Maintenance Management System (CMMS), the establishment of an automated 30-day functional testing schedule, and the application of durable, uniquely numbered labels to each fixture for future tracking. The estimated contract value ranges between $25,000 and $100,000, with a performance period of 30 business days following the written Notice to Proceed. Bids are due by December 1, 2026, and will be awarded based on overall best value. Mandatory requirements for submission include a physical site visit, a signed attendance roster, and a detailed cost breakout on company letterhead. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Compliance with the Davis-Bacon Act, Federal Contractor Minimum Wage requirements, and FAR 52.222-4 regarding work hours and safety standards is mandatory. First-tier subcontractors with awards exceeding $45,000 must also disclose their debarment status per FAR 52.209-6.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 7 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
Joliet Job Corps- Replacement of Water Damaged Transformer
Solicitation # joliet-job-corps-replacement-water-damaged-transformer
Management & Training Corporation (MTC), operating the Joliet Job Corps for the U.S. Department of Labor, is soliciting bids for a fixed-price, single lump sum contract to replace a water-damaged 30 KVA, 480V primary, 120/208V secondary transformer at 1101 Mills Road, Joliet, Illinois. The scope of work includes coordinating electrical outages, implementing OSHA-compliant lockout/tagout procedures, removing and disposing of the damaged unit and hardware per environmental regulations, and installing a new transformer on a structurally adequate elevated support assembly. Key deliverables include two operation and maintenance manuals and a one-year written guarantee for workmanship. The project is a small business set-aside opportunity under NAICS 238210, with a size standard of $19 million. Bids will be awarded based on overall best value. Contractors must provide a detailed cost breakout and a bid bond of 20% for bids exceeding $25,000, with performance and payment bonds required for the awarded contractor. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wages and the submission of weekly certified payroll reports. Required documentation includes the MTC Supplier Packet, SF 1413, and a Unique Entity Identifier (UEI) for FFATA reporting if the award is $40,000 or more. Proposals are due by November 25, 2026, at 3:00 pm CT.
Joliet Job Corps

POSTED

about 7 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

This subcontract focuses on the delivery of electrical infrastructure and pedestrian lighting for roadway projects managed by the City of Seattle Department of Transportation. The selected contractor will work under prime contractors to execute critical technical tasks, including the installation of electrical conduits, trenching, wiring, and the complete setup of operational pedestrian lighting systems. The project falls under NAICS code 238210 and is associated with Public Works in Washington. Interested parties must submit their responses by the deadline of October 28, 2026, following the posting date of October 7, 2026.

General Info

Subcontract for Seattle roadway electrical infrastructure and pedestrian lighting installation by October 28, 2026.

Documents

This scope was carved out of PW#2026-005.

The full solicitation package (10 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

1st Ave NE Shared Use Path - N 120th to N 130th

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Public Works
ContactsNo contacts available
OfficeN/A
Organization / AgencyWashington → Public Works
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs electrical installations and installs pedestrian lighting for prime contractors on City of Seattle Department of Transportation roadway projects. Executes electrical conduit installation, trenching, wiring, and pedestrian lighting system setup. Delivers operational pedestrian lighting and electrical infrastructure.

More opportunities from Washington → Public Works

Same awarding agency

NAICS: 237310
New
SLED
Roosevelt Way Preservation (FHWA)
Solicitation # 2025-074
The Roosevelt Way Preservation Project (PW# 2025-074) is a federally funded infrastructure initiative managed by the Seattle Department of Transportation. The project focuses on improvements to Roosevelt Way NE from NE 92nd Street to Pinehurst Way NE, and Pinehurst Way NE from Roosevelt Way NE to 15th Avenue NE. The scope of work includes planing asphalt overlay, removing and replacing concrete panels and base repair, realigning the intersection at NE 113th Street, and installing curb bulbs at NE 114th Street and NE 115th Street. Additional requirements involve the installation of ADA-compliant curb ramps, sidewalk restoration, channelization, signing, concrete bike barriers, traffic signals, landscaping, and storm drainage. The engineer's estimate for the project is between $12,500,000 and $12,800,000. The contract is awarded to the lowest responsive bidder, with proposed recycling percentages serving as a tie-breaker. Bidders must comply with FHWA regulations, including Buy America requirements and a 13% Federal Small Business Enterprise (FSBE) goal. Performance is governed by the 2026 City of Seattle and WSDOT Standard Specifications. Key administrative requirements include a bid guaranty of 5% of the total bid and the provision of payment and performance bonds. Contractors are responsible for quality control and must coordinate specific inspections, such as those required by KC Metro for shelter footings. Bids are submitted via the OpenGov portal or by hard copy to the City of Seattle.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 4 days
View Details
NAICS: 237310
New
SLED
East Marginal Way S Preservation (FHWA)
Solicitation # 2025-057
The East Marginal Way S Preservation project is a federally funded solicitation (NHPP-1391(005)) issued by the City of Seattle Public Works for roadway improvements from 1st Ave South to the Tukwila City Limits. With an engineer's estimate of $10,800,000, the scope of work focuses on pavement overlay, milling, and spot base repairs, alongside the rechannelization of the roadway to accommodate a protected bike lane and shared use path. Comprehensive infrastructure tasks include the installation of curb ramps, sidewalks, drainage systems, street lighting, signals, signing, striping, and landscaping. Specialized requirements for the project include electrical work and rebar installation, with specific geotechnical considerations for signal pole foundations in lower strength soil zones. The contract is awarded to the lowest responsive bidder, with a tie-breaker preference for the highest percentage of recycled materials. Bidders must adhere to a 13% Federal Small Business Enterprise (FSBE) goal and comply with various federal and state mandates, including Buy America, the Americans with Disabilities Act, and prevailing wage laws. Submission requirements include a bid guaranty of five percent of the total bid and certifications regarding wage law compliance and non-debarment. Project execution must follow the 2026 City of Seattle Standard Specifications and the SDOT Traffic Control Manual, with strict protocols for hazardous materials handling and waste packaging.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in 4 days
View Details
NAICS: 238220
New
SLED
Charles Street Vehicle Maintenance HVAC Improvements
Solicitation # PW#2026-041
Solicitation PW#2026-041 is a mechanical project for the City of Seattle's Department of Finance and Administrative Services to perform HVAC improvements at the Charles Street Vehicle Maintenance facility located at 805 South Charles Street, Seattle, WA. The primary scope of work involves upgrading the existing exhaust fan system and installing a new makeup air unit to improve the removal of noxious gases from the welding shop. The project has an architect and engineer estimate of 1,540,511.00 dollars and requires the contractor to provide all labor, materials, and equipment necessary for completion, including adherence to ADA compliance and DOT regulations. The contract will be awarded to the responsible bidder providing the lowest responsive bid, with a strong emphasis on social equity. Bidders must submit a Women and Minority Business Enterprise (WMBE) Inclusion Plan and earn at least 10 points to be considered responsive, reflecting a past performance utilization rate of 15 percent. Required submissions include a bid bond, a signed Letter of Assent, and a Social Equity Plan. Once awarded, the contractor must provide payment and performance bonds for 100 percent of the contract amount plus state sales tax. Performance is monitored via a matrix focusing on construction work and contract compliance, with liquidated damages of 1,000.00 dollars per working day for delays in achieving substantial completion.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in 4 days
View Details
NAICS: 541320
SLED
Deane's Children's Park Phase I and II Improvements
Solicitation # 2026-RFQ-044
Solicitation 2026-RFQ-044, issued by the City of Mercer Island Public Works department, seeks professional services for the detailed design, permitting, and construction of Phase I and II improvements at Deane's Children's Park located at 5701 Island Crest Way, Washington. The project focuses on expanding inclusive play and accessibility while preserving the site's natural character. Phase I includes nature-based inclusive play features for ages 5 to 12 and older, swings, fencing, accessible parking, a connection to Island Park Elementary, utility infrastructure, and native vegetation restoration. Phase II involves the redevelopment of the central play area with inclusive features for children ages 2 to 12 and older. The selected consultant must be licensed in Washington State per RCW 39.80.020 and adhere to ADA and playground safety standards. The contract will be governed by the City's standard professional services agreement, requiring the consultant to act as an independent contractor and provide comprehensive indemnification to the City. Payment will be made via City warrant within 45 days of receiving monthly invoices. The evaluation process involves screening Statements of Qualifications, which are due by December 4, 2026, and may include short-listing, interviews, and reference checks. The final selection is at the sole discretion of the City. Awarded firms must maintain cost records for three years following final payment and provide technical construction support, including the review of RFIs and shop drawings.
Landscape Architectural Services

POSTED

11 days ago

DEADLINE

in 20 days
View Details
NAICS: 333923
SLED
Gorge Powerhouse Crane Replacement
Solicitation # 2022-076A
The City of Seattle is soliciting Statements of Qualifications for the Gorge Powerhouse Crane Replacement Design-Build Project located in Newhalem, Washington. This project involves the comprehensive design, demolition, construction, and commissioning of two replacement overhead bridge cranes, each rated at 150T, including a new collector for main power and communication circuits and all necessary controls and radio equipment. The estimated contract value is 12.5 million dollars, with an estimated notice to proceed date of March 1, 2027. The selected Design-Builder will be responsible for all project management, engineering, and quality control, ensuring compliance with ASME B30.2 and CMAA Specification 78 standards, as well as the Skagit Hydroelectric Project Historic Resources Management Plan. The procurement process utilizes a scored evaluation to identify the highest scored proposer, beginning with a qualifications phase that emphasizes past performance on similar projects. Qualified firms must provide a bonding commitment of at least 10.5 million dollars and meet strict insurance and registration requirements within the State of Washington. Key deliverables include 60 percent and 90 percent design packages, factory and site acceptance testing, and specialized training for crane operations and maintenance. The contract mandates adherence to prevailing wages, social equity and underutilized business inclusion plans, and strict safety standards, including the provision of an OSHA Experience Factor for the past three years.
Overhead Traveling Crane, Hoist, and Monorail System Manufacturing

POSTED

12 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS