Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Electrical Engineering (Arc Flash Study)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of 2027-01.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CAT CENTRAL AC REPLACEMENT

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Chatham Area Transit Authority
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs professional electrical safety analysis and labeling for prime contractors on Chatham Area Transit Authority (CAT) facility projects. Conducts an Arc Flash Study and applies required safety labels to all new equipment in accordance with National Electrical Code (NEC) standards using electrical analysis software. Delivers the Arc Flash Study report and physical equipment labels.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Federal
SR Power Supplies Rack Detailed Design for ALS-U
Solicitation # AA-2027-01
The University of California, acting on behalf of the Lawrence Berkeley National Laboratory (LBNL), has issued Request for Proposal No. AA-2027-01 for the detailed design of ALS-U Storage Ring Power Supplies rack assemblies. This engineering services solicitation, classified under NAICS 541330, requires a subcontractor to complete the detailed design of 76 power supply racks across 16 distinct layouts, categorized into Standard, Hard Bend, and ATS/STA sectors. The scope includes developing 3D models using Autodesk Inventor Professional 2025, production drawings, electrical diagrams, and cable-harness documentation. The project follows a phased approach with six mandatory design review milestones, including Preliminary Design Reviews (PDR) and Final Design Reviews (FDR), with a target completion date for the full Technical Data Package of January 31, 2027. The period of performance for the resulting subcontract is expected to extend through January 31, 2029. Proposals must be submitted via email or secure electronic transmission to the University Procurement Representative no later than midnight PST on October 2, 2026. Submissions must include a Technical Volume addressing methodology, schedule, personnel, past performance, and quality assurance, as well as a Business Volume containing the price proposal and mandatory enclosures. The price proposal must feature a firm fixed price for the design package and a separate rate for on-call hourly support. LBNL will award the contract based on the best overall value, evaluating both technical expertise and non-technical factors such as the acceptance of subcontract terms. Mandatory submission requirements include a completed ALS-U Quality Evaluation Survey and a Standard Form Representation and Certification form. The work is primarily to be performed at the subcontractor's facility with remote coordination and occasional on-site visits to Berkeley, California.
Berkeley National Labor - DOE Contractor

POSTED

about 11 hours ago

DEADLINE

in 18 days
View Details
NAICS: 541330
New
SLED
Keller Community Center Roof Replacement Engineering & Design
Solicitation # RFP-KCC-Roof-Design.pdf
The Confederated Tribes of the Colville Reservation is seeking a Washington State Certified and Licensed Engineering Firm to provide stamped engineered drawings and specifications for the replacement of approximately 10,000 square feet of roofing at the Keller Community Center in Nespelem, Washington. The scope of work includes providing construction-ready documents, RFI responses, submittal reviews, professional guidance on asbestos, and assistance with the Construction RFP Scope of Work. The contractor is responsible for providing cost estimates for the entire project and individual sections, including the gymnasium, metal roof, and walkway roof, while ensuring HVAC curbs are sealed and engineering a ladder for roof access. Engineering services are scheduled for completion between October 2026 and March 2027, with continued support through the construction phase. Proposals must be submitted by 3:00 p.m. PST on October 29, 2026, and must not exceed 30 pages. Evaluation is based on a 100-point scale considering technical responsiveness, qualifications, experience, cost, and TERO preferences, with a specific price preference for responsible Indian Offerors within 10 percent of the lowest bid. Awarded contractors must consent to the jurisdiction of the Colville Tribal Court and maintain comprehensive insurance, including Commercial General Liability of 1 million dollars per occurrence. Additionally, contracts exceeding 100,000 dollars require a performance bond, otherwise, a 25 percent retainage applies. All payments are contingent upon the availability of funds within the tribal treasury and follow a fiscal year from October 1 to September 30.
Confederated Tribes of the Colville Reservation

POSTED

about 16 hours ago

DEADLINE

in 28 days
View Details

More opportunities from Georgia → Chatham Area Transit Authority

Same awarding agency

NAICS: 238220
New
SLED
CAT CENTRAL AC REPLACEMENT
Solicitation # 2027-01
The Chatham Area Transit Authority (CAT) is soliciting proposals for the CAT Central AC Replacement project under solicitation number 2027-01. This project involves the installation of new, specification-grade air conditioning equipment in Georgia, with an anticipated contract duration of six months. The selected contractor must provide an arc flash study and labeling for all new equipment in accordance with NEC standards and submit electronic shop drawings and technical data sheets. Proposals must be submitted by 2:00 PM EST on October 23, 2026, consisting of one unbound original, three copies, and an electronic version. Award will be granted to the highest-ranked proposer based on a weighted evaluation, which includes a price cost proposal accounting for 20 percent of the score. The contract is subject to stringent federal and state regulatory requirements, including Buy America preferences, the Davis-Bacon Act for prevailing wages, and E-Verify compliance. Proposers must provide several certifications, including those for lobbying, government-wide debarment, and Disadvantaged Business Enterprise (DBE) status. Financial security is required in the form of a bid guarantee equal to five percent of the bid price, a performance guarantee for 100 percent of the contract value, and a payment bond for 100 percent of the contract price. Additionally, the contractor must maintain commercial general and professional liability insurance with limits of at least 1 million dollars.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

in 22 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS