Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

RFQ-RFP INFLOW AND INFILTRATION ENGINEERING SERVICES FOR WATER & SEWER

Open
26/27-19State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Town of Manchester Water and Sewer Department is seeking professional engineering services to conduct a comprehensive Inflow and Infiltration (I&I) investigation and Sanitary Sewer Evaluation Survey (SSES) for its sanitary sewer collection system. The project aims to address aging infrastructure and excessive wet-weather flows that increase the risk of sanitary sewer overflows and basement backups. The selected firm will be responsible for analyzing existing system data, performing field investigations—including smoke testing, dye testing, and CCTV inspections—and quantifying wet-weather peaking factors. The ultimate goal is to produce a prioritized, GIS-integrated rehabilitation roadmap that distinguishes between public-side defects and private-side contributions to ensure long-term regulatory compliance with Connecticut DEEP NPDES requirements. Proposals must be submitted electronically via the Town of Manchester OpenGov portal by December 3, 2026. The award will be based on the best suited and most advantageous proposal, with cost being only one of several evaluation factors. Required documentation includes a separate proposal, a completed IRS Form W-9, a SAM.GOV registration number, and a Living Wage Certification. Contractors must maintain professional liability and cyber risk insurance of at least $1,000,000 and adhere to the Manchester Living Wage Ordinance if the contract value exceeds $25,000 in a fiscal year.

General Info

Manchester seeks engineering services for a sanitary sewer investigation and rehabilitation roadmap.

Place of Performance

CT, USA

Set-Aside

NONE

Documents

2
PDF, High priority: read this firstrfp
High
PDF, Low priority1 page · living-wage-certification
Low

Read all 2 documents

Due in 17 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 17 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 2 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyConnecticut → Water and Sewer
Contacts2 people available
OfficeManchester, CT, 06040, USA

Interested Companies (7)

AecomChelmsford, MA
ArcadisWakefield, MA
JWBOrange, CT

See All 7 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The Town of Manchester Water and Sewer Department (WSD) operates a sanitary sewer collection system that serves approximately 58,000 residents and conveys an average daily flow of roughly 7 million gallons per day (MGD) to the Hockanum River Water Pollution Control Facility (HRWPCF). During significant rainfall events, extraneous flows from inflow and infiltration (I&I) cause substantial increases in system flow. These peaks reduce available capacity, limit operational redundancy, and elevate the risk of sanitary sewer overflows (SSOs), manhole surcharging, and basement backups. Much of the collection system is aging, and a comprehensive, system-wide assessment of I&I has not been completed in recent years. Without reliable data on the location, type, and relative contribution of I&I sources, the Town cannot effectively prioritize system improvements or sequence rehabilitation work. Completing this work is a near-term priority that will directly inform the WSD's planning efforts and support long-term regulatory compliance with Connecticut DEEP NPDES requirements. A successful project will deliver more than a conventional I&I study or SSES. The highest-value outcome for the Town is a clear, prioritized, and implementable rehabilitation program that: Quantifies wet-weather peaking factors and identifies the basins or sub-basins contributing the greatest volumes of I&I; Distinguishes between public-side defects (mains, manholes) and private-side contributions (laterals, illicit connections) so the Town can focus resources where they produce measurable flow reduction; Provides defensible, GIS-integrated data that can be used immediately for planning and future construction contract documents; and Establishes a practical, phased implementation roadmap that supports near-term flow reduction and long-term system reliability and capacity. Vendors that demonstrate a proven ability to translate field findings into prioritized, actionable recommendations—and that understand the operational constraints of a municipal utility—will be best positioned to support the Town's goals.
Addendum #1: The cost proposal submission requirement in the evaluation criteria section has been removed. Please use the See What Changed link to view all the changes made by this addendum.
Addendum #2: Please use the See What Changed link to view all the changes made by this addendum.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
2708RFQ - Utilities Continuing Services
Solicitation # 2708RFQ
The City of Daytona Beach is soliciting proposals for professional engineering services to support the Utilities Department Capital Improvement Program through a continuing contract structure. The scope is divided into three primary categories: Information Technology, SCADA, and Telecommunications; Stormwater Management; and Water and Reuse Distribution/Wastewater Collection, as well as Water Supply and Treatment/Wastewater Treatment. Services will be performed on a work authorization basis and include planning, design, cybersecurity guidance, and construction engineering inspection. All work must adhere to the most recent City of Daytona Beach technical standards and Standard Details. Qualified firms must be registered with the State of Florida Board of Professional Engineers and submit separate proposal documents for each category they wish to be considered for via the OpenGov platform. Awards will be based on the best overall value rather than the lowest cost, with evaluation weights assigned to the ability of professional personnel (35%), firm experience (30%), and the ability of the project team (25%). Key compliance requirements include adherence to WCAG 2.0 AA for online services, Clean Air Act regulations for contracts exceeding 150,000 dollars, and specific lobbying certifications for offers exceeding 100,000 dollars. The response deadline is December 17, 2026.
Utilities Department

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
SLED
ARCHITECTURAL AND ENGINEERING (A&E) PROFESSIONAL SERVICES NEW EAST END - REGIONAL PARK PROJECT
Solicitation # 2027-01
Goochland County Government is soliciting architectural and engineering professional services for the New East End Regional Park Project in Virginia. The scope of work requires a comprehensive approach encompassing architectural, civil engineering, landscape architectural, environmental, geotechnical, transportation, and utility services. Key deliverables include the development of design documents through conceptual, schematic, and various stages of design development, as well as the execution of technical studies such as wetlands delineation, geotechnical investigations, and a Traffic Impact Study coordinated with VDOT. The selected firm will also be responsible for designing water, sewer, and storm water infrastructure. The contract is awarded through a competitive negotiation process based on professional qualifications and merit, with the term lasting for the duration of the project plus one year following the final construction payment. The selected architect must perform site reviews at least twice monthly for up to 12 months to ensure work quality and protect the county from deficiencies or delays. Applicants must demonstrate experience in the design and construction administration of public parks, provide professional liability insurance, and submit a non-collusion certification. Proposals are limited to 30 pages and must be submitted via the Euna OpenBid DemandStar portal by January 15, 2027.
Goochland County Government

POSTED

about 3 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 541330
New
SLED
Engineer Continuing Services Contract for Utility Projects
Solicitation # 20260176
The City of Port St. Lucie is seeking to establish a continuing services contract with a minimum of five qualified professional engineering firms to provide as-needed support for its utility and infrastructure projects. This solicitation, number 20260176, focuses on the planning, design, permitting, construction administration, inspection, and management of water and wastewater pipelines, facility improvements, pump station upgrades, and general system repairs. These services are intended to support the City's Utility Capital Improvement Plan and Utility Master Plan. The contract will have an initial term of three calendar years, with two optional one-year renewals at the City's discretion. Award selection is based on technical qualifications and best value, with price negotiated separately in accordance with Florida Statute 287.055. Selected firms will be assigned projects on a rotational basis, considering their specific qualifications, current workload, and availability. Proposers must be registered in the State of Florida and provide evidence of their experience with five to ten relevant projects completed within the last decade. Mandatory submissions include a W-9, Certificate of Insurance, and various certifications regarding ethics, drug-free workplaces, and anti-human trafficking laws. Invoices are submitted monthly to the Project Manager, with a standard payment term of at least thirty days.
Utility System

POSTED

about 5 hours ago

DEADLINE

in 21 days
View Details
NAICS: 541330
New
SLED
Schuylkill River Pedestrian and Cyclist Bridge Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)
Solicitation # 27-67-108
The Delaware Valley Regional Planning Commission (DVRPC) is soliciting proposals for the Schuylkill River Pedestrian and Cyclist Bridge Feasibility Study under TCDI Project Category 5. The objective of this study is to improve multimodal access to the Schuylkill River Trail, SEPTA Regional Rail Station, commercial districts, and employment centers. The selected consultant will be responsible for project management, an existing conditions assessment of bridge infrastructure and transit connectivity, and a community engagement program involving residents and agencies such as PennDOT District 6-0 and SEPTA. Key deliverables include an administrative draft, a final feasibility study, and an executive summary, all of which must incorporate ADA accessibility and safety considerations for pedestrians and cyclists. This solicitation, numbered 27-67-108, requires that all competing consultants be prequalified to work on TCDI-funded projects. Proposals must be submitted via the OpenGov portal in PDF format by December 4, 2026, with technical and budget proposals submitted separately. The award will be based on a points-based evaluation of the proposer's ability to meet the criteria, with the final recommendation sent to the DVRPC Board. All funded work must be completed by June 30, 2028. While the project adheres to Title VI of the Civil Rights Act of 1964 to ensure non-discrimination, there is no specific DBE subcontracting goal for this contract.
Community Planning

POSTED

about 5 hours ago

DEADLINE

in 18 days
View Details

More opportunities from Connecticut → Water and Sewer

Same awarding agency

NAICS: 237110
New
SLED
FURNISH AND INSTALL INSERTS FOR SIPHONS 1 & 3 AT GLOBE HOLLOW WATER TREATMENT FACILITY
Solicitation # 26/27-17
The Town of Manchester, Connecticut, is soliciting proposals for solicitation number 26/27-17 to furnish and install inserts for Siphons 1 and 3 at the Globe Hollow Water Treatment Facility. The scope of work includes the repair of the trough discharge point, including all necessary piping, fittings, supports, and seals to ensure a watertight and serviceable discharge consistent with previously repaired siphons. All materials used must be equal or superior to those used on Siphons 2 and 4 and must be NSF/ANSI 61-compliant for potable water service. The project requires a phased approach where Siphon 1 must be tested and operational for one week before work begins on Siphon 3. Proposals are due by November 17, 2026, via the OpenGov portal. The award will be based on a weighted evaluation of price (50%), project schedule (25%), and familiarity with the Globe Hollow Water Treatment Plant (25%). Bidders must provide a bid bond or cashier's check for 5% of the total bid and must be prepared to provide performance and labor and materials bonds equal to 100% of the contract price upon award. Compliance with Connecticut prevailing wage laws and OSHA 10-hour construction safety certification for all employees is mandatory. Required submission documents include a current W-9, SAM registration number, FEIN/EIN, a five-year project history, and a detailed project approach.
Water and Sewer Line and Related Structures Construction

POSTED

about 6 hours ago

DEADLINE

in 14 days
View Details
NAICS: 423930
New
SLED
SALE OF SCRAP METAL
Solicitation # 26/27-10
The Town of Manchester, Connecticut, is soliciting bids for the sale and removal of approximately 45 cubic yards of loosely piled scrap metal waterworks material. The material is sold on an as is and where is basis and is located at ground level at the Water Department storage yard at 3 Line Street. The successful bidder must provide all labor, materials, and equipment necessary for removal, which must be conducted on weekdays between 7:30am and 3:00pm. Bids are being accepted through the Town's OpenGov e-Procurement Portal, with a final response deadline of November 19, 2026, at 11:00am. The contract will be awarded to the bidder offering the highest price per pound. The winning contractor is required to weigh all materials on the State certified truck scale at the Town of Manchester Landfill and provide loaded weight slips for every load. Payment must be made to the Town of Manchester within five business days after pickup, accompanied by scale tickets and a detailed statement of payment calculations. Compliance requirements include the submission of a current IRS Form W-9 and adherence to all Federal and State safety standards. The contractor must maintain comprehensive insurance coverage, including General Liability, Professional Liability, Cyber Risk, and Environmental Liability, with minimum limits of 1 million dollars per occurrence or claim. Additionally, all vendors must maintain an affirmative action policy in accordance with Federal Order 11246.
Recyclable Material Merchant Wholesalers

POSTED

4 days ago

DEADLINE

in 3 days
View Details
NAICS: 238210
SLED
FURNISH AND INSTALL GENERATOR AT LOVE LANE
Solicitation # 26/27-20
The Town of Manchester, Connecticut, is soliciting bids for a complete turnkey solution to furnish and install a standby diesel generator at the Love Lane Pump Station. This critical sewage facility requires continuous operation to protect public health and the environment, necessitating a permanently installed system capable of automatic start and transfer within 10 seconds. The scope of work includes the delivery and installation of a generator with a sound-attenuated enclosure, a UL 1008 automatic transfer switch, and a dual-wall sub-base fuel tank providing at least 48 hours of operation at 100 percent standby rating. The contractor is responsible for all civil and electrical work, including the construction of a concrete pad situated at or above the base flood elevation plus 2 feet, wiring, startup, load-bank testing, and an initial fuel fill. Bidders must provide a mandatory generator sizing report demonstrating compliance with voltage and frequency dip limits. The project must adhere to strict technical standards, including NFPA 110 Level 1 Type 10, NEIWPCC TR-16, and EPA Tier 3 emissions requirements. Administratively, the contract requires compliance with Connecticut prevailing wage laws and the Town of Manchester Living Wage Ordinance. Submissions must include a completed W-9 and Living Wage Certification, with bid prices remaining firm for 60 days. The Town reserves the right to award the contract based on the best interest of the municipality rather than solely on the lowest bid. All bids are due electronically by November 19, 2026, at 11:00 am.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

11 days ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS